Sl. No. | Division
Working Divisions
|
Bill Number | Bill Date
Date of Issuance of the Work Order as per PHED-MIS
|
Vendor Name
Vendor Appointed Against this Work Order as per PHED-MIS
|
System Order Number
System generated Order No. for the Work Order as per PHED-MIS
|
Memo Number
Memo no. for Work Order Provided by the Divisions as per PHED-MIS
|
Order Date
Date of Issuance of the Work Order as per PHED-MIS
|
work_name
Name of the Work as per the Issued Work Order
|
Bill Gross Amount | Voucher Number | Voucher Date | System Voucher Number |
---|---|---|---|---|---|---|---|---|---|---|---|---|
0 | 431.76 | |||||||||||
1 | Siliguri W/S Division | BILL/00549/2023-2024 | 15/03/2024 | BRM DEVELOPERS | ORD/000118/2023-2024 | 1204/SWSD | 11/08/2023 | Construction of 550 cu.m. capacity R.C.C. Elevated Reservoir, 20 mtrs. Staging height at the head works site, laying Rising Main, laying distribution pipeline with Functional household tap connection (FHTC), construction of 2 (two) nos. Pump House (5.40 X | 98.96 | BP-2024-25-50 | 16/07/2024 | VCH/000577/2023-2024 |
2 | Siliguri W/S Division | BILL/00067/2024-2025 | 20/05/2024 | ENVIROTECH SOLUTIONS | ORD/000323/2022-2023 | 319/SSD | 20/06/2022 | Preparation of Details Project Report (DPR) incl. route survey in connection with proposed Dhemal Piped water supply schemes at the uncovered mouzas under Naxalbari Block of Siliguri Sub Division, PHE Dte. | 2.40 | BP-2024-25-45 | 11/07/2024 | VCH/000096/2024-2025 |
3 | Siliguri W/S Division | BILL/00126/2024-2025 | 02/07/2024 | FAIRDEAL ASSOCIATES | ORD/000122/2023-2024 | 1230/SWSD | 14/08/2023 | Construction of 250 cu.m. Capacity R.C.C. Elevated Reservoir, 20 Mtrs. Staging Height at the head works site (Zone-II), including Rising Mains, Distribution System Providing Functional household Tapn Connection (FHTC), Iron Elimination Plant (IEP) with Bl | 79.79 | BP-2024-25-44 | 10/07/2024 | VCH/000095/2024-2025 |
4 | Siliguri W/S Division | BILL/00127/2024-2025 | 11/07/2024 | RAJEEV RANJAN OJHA | ORD/000044/2023-2024 | 670/SWSD | 16/06/2023 | Construction of 100 Cu.M. capacity R.C.C. Elevated Reservoir of 20 Mtrs. Staging Height with laying distribution system, soil investigation, rising main, boring of deep tubewells, construction of pump houses with toilet, boundary wall at head works and 2n | 64.64 | BP-2024-25-49 | 15/07/2024 | VCH/000104/2024-2025 |
5 | Siliguri W/S Division | BILL/00141/2024-2025 | 12/07/2024 | BUDDHADEV NAG | ORD/000036/2023-2024 | 648/SWSD | 15/06/2023 | Construction of rig bore big dia deep tube well 4 (four) nos. by ODEX-165 method of drilling of BANDARGACHH Piped Water Supply Scheme at Phansidewa block under Siliguri Sub Division, P.H.E. Dte. in the dist. of Darjeeling. | 6.05 | BP-2024-25-52 | 16/07/2024 | VCH/000101/2024-2025 |
6 | Siliguri W/S Division | BILL/00142/2024-2025 | 12/07/2024 | EASHAN POLYMERS PRIVATE LIMITED | ORD/000197/2023-2024 | 1977/SWSD | 26/10/2023 | Work Order for Construction of 200 cu.m capacity Elevated Reservoir 20 m staging height allied with laying of distribution pipeline, Rising Main, Construction of 3 nos Big dia rig bore tube well by ODEX 165, Pump House (5.4 X 3.60 m), Iron Elemination Pla | 74.66 | BP-2024-25-53 | 16/07/2024 | VCH/000100/2024-2025 |
7 | Siliguri W/S Division | BILL/00134/2024-2025 | 12/07/2024 | BUDDHADEV NAG | ORD/000195/2023-2024 | 1427/SWSD | 24/08/2023 | Hiring of I (one) nos Disel Motor CAB on monthly besis for the Assistant Engineer II ,Office of Executive Engineer under Siligui W/S Division, P.H.E Dte..With effect from 25.08.2023 to 24.02.2024 .Total 184 days. | 0.27 | BP-2024-25-55 | 16/07/2024 | VCH/000103/2024-2025 |
8 | Siliguri W/S Division | BILL/00068/2024-2025 | 20/05/2024 | ENVIROTECH SOLUTIONS | ORD/000071/2023-2024 | 264/SSD | 05/06/2023 | PREPARATION OF DETAILS PROJECT REPORT (DPR) INCLUDING ROUTE SURVEY IN CONNECTION WITH AUGMENTATION OF PORJHAR PIPED WATER SUPPLY SCHEME UNDER RAJGANJ BLOCK, JALPAIGURI DISTRICT UNDER SILIGURI W/S DIVISION, P.H.E. DTE | 2.77 | BP-2024-25-47 | 11/07/2024 | VCH/000097/2024-2025 |
9 | Siliguri W/S Division | BILL/00123/2024-2025 | 28/06/2024 | VIJAY KUMAR ARORA | ORD/000277/2022-2023 | 2655/SWSD | 02/03/2023 | Construction of 200 cum capacity RCC Elevated Reservoir, 20 mtrs. Staging height at the head works site along with distribution system rising main, iron elimination plant, pump houses, boundary walls, functional house hold tap connection (FHTC), soil inve | 63.43 | BP-2024-25-42 | 10/07/2024 | VCH/000093/2024-2025 |
10 | Siliguri W/S Division | BILL/00124/2024-2025 | 26/06/2024 | SONA PETROL PUMP | null | 1845/SWSD | 04/10/2023 | Issue of fuel for Office of the Executive Engineer and Assistant Engineers of Siliguri W/S Division, PHE Dte. from 17th March 2024 to 30th May 2024 | 1.87 | BP-2024-25-41 | 08/07/2024 | VCH/000092/2024-2025 |
11 | Siliguri W/S Division | BILL/00129/2024-2025 | 11/07/2024 | TALUKDAR ENTERPRISE | ORD/000289/2023-2024 | 2028/SWSD | 03/11/2023 | Work Order for Running of District laboratory for Physical, Chemical and Bacteriological Test of Water Sample under Siliguri Water Supply Scheme, Dist Darjeeling under Siliguri Water Supply Division, P.H.Engineering Dte. from 01.09.2023 to 31.08.2024 i.e. | 7.69 | BP-2024-25-48 | 15/07/2024 | VCH/000105/2024-2025 |
12 | Siliguri W/S Division | BILL/00135/2024-2025 | 12/07/2024 | BUDDHADEV NAG | ORD/000195/2023-2024 | 1427/SWSD | 24/08/2023 | Hiring of I (one) nos Disel Motor CAB on monthly besis for the Assistant Engineer II ,Office of Executive Engineer under Siligui W/S Division, P.H.E Dte..With effect from 25.08.2023 to 24.02.2024 .Total 184 days. | 0.27 | BP-2024-25-56 | 22/07/2024 | VCH/000106/2024-2025 |
13 | Siliguri W/S Division | BILL/00122/2024-2025 | 28/06/2024 | HIMADRI DAM & CO. | ORD/000037/2023-2024 | 646/SWSD | 15/06/2023 | Construction of Pump House with toilet, plinth protection etc. installation of IEP and Boundary Wall at Thakurganj of THAKURGANJ Piped Water Supply Scheme at Phansidewa block under Siliguri Sub Division, P.H.E. Dte. in the dist. of Darjeeling. | 12.31 | BP-2024-25-43 | 10/07/2024 | VCH/000094/2024-2025 |
14 | Siliguri W/S Division | BILL/00066/2024-2025 | 20/05/2024 | ENVIROTECH SOLUTIONS | ORD/000324/2022-2023 | 402/SSD | 25/07/2022 | Preparation of Details Project Report (DPR) incl. route survey in connection with proposed Lohasing Piped water supply schemes at the uncovered mouzas under Naxalbari Block of Siliguri Sub Division, PHE Dte. | 2.61 | BP-2024-25-46 | 11/07/2024 | VCH/000098/2024-2025 |
15 | Siliguri W/S Division | BILL/00143/2024-2025 | 12/07/2024 | U.K CONSTRUCTIONS | ORD/000039/2023-2024 | 643/SWSD | 15/06/2023 | Laying distribution pipeline and Rising Main allied with construction of 2 nos. big dia rig bore tube well by ODEX-165, Pump House (5.4 X 3.65 m), Iron Elimination Plant (10 cu.m/hr.), Boundary Wall including FHTC at NICHITPUR Piped Water Supply Scheme un | 14.03 | BP-2024-25-54 | 16/07/2024 | VCH/000099/2024-2025 |
Total | 431.76 |