No. of unauthorized payments
Exception Report Showing the Status of Major Pending Works for the Divisions

Update Data
Rs. in Lakh
Sl. No. Division
Working Divisions
Bill Number Bill Date
Date of Issuance of the Work Order as per PHED-MIS
Vendor Name
Vendor Appointed Against this Work Order as per PHED-MIS
System Order Number
System generated Order No. for the Work Order as per PHED-MIS
Memo Number
Memo no. for Work Order Provided by the Divisions as per PHED-MIS
Order Date
Date of Issuance of the Work Order as per PHED-MIS
work_name
Name of the Work as per the Issued Work Order
Bill Gross Amount Voucher Number Voucher Date System Voucher Number
0 265.95  
1 Siliguri W/S Division BILL/00127/2025-2026 26/06/2025 NARAYAN CH GHOSH ORD/000172/2023-2024 1734/SWSD 22/09/2023 Acceptance cum work order for laying of rising main, distribution system of pipeline, construction of pump houses, boundary wall, sinking of Rig bore deep tube well by Odex-165 method of drilling, development of land and other allied works for Augmentatio 16.05 BP-2026-27-7 09/10/2026 VCH/000217/2026-2027
2 Siliguri W/S Division BILL/00225/2025-2026 28/08/2025 KRISHNA TRADING CO. ORD/000183/2023-2024 1812/SWSD 03/10/2023 Work Order for Construction of 250 cu.m. capacity R.C.C. Elevated Reservoir , 20 Mtrs. Staging height at the head work site including distribution system (HDPE) with rising main, Rig bore 2 nos. big dia T/W by Odex-165 method, providing functional househo 144.50 01000300794/803 09/10/2026 VCH/000201/2026-2027
3 Siliguri W/S Division BILL/00380/2024-2025 17/12/2024 SUDIP BASAK ORD/000245/2022-2023 2094/SWSD 22/12/2022 Construction of Pump House (5.4 X 3.65) size, Rig Bore Big Dia Deep Tubewell by ODEX-165 method of drilling, boundary wall allied with laying of rising main, distribution system and providing functional household tap connection (FHTC) under JJM for M.M. T 42.97 01000300822 09/10/2026 VCH/000537/2024-2025
4 Siliguri W/S Division BILL/00388/2024-2025 23/12/2024 EASHAN POLYMERS PRIVATE LIMITED ORD/000197/2023-2024 1977/SWSD 26/10/2023 Work Order for Construction of 200 cu.m capacity Elevated Reservoir 20 m staging height allied with laying of distribution pipeline, Rising Main, Construction of 3 nos Big dia rig bore tube well by ODEX 165, Pump House (5.4 X 3.60 m), Iron Elemination Pla 62.43 BP-2026-27-26 09/10/2026 VCH/000207/2026-2027
Total 265.95