| Sl. No. | Division
Working Divisions
|
Bill Number | Bill Date
Date of Issuance of the Work Order as per PHED-MIS
|
Vendor Name
Vendor Appointed Against this Work Order as per PHED-MIS
|
System Order Number
System generated Order No. for the Work Order as per PHED-MIS
|
Memo Number
Memo no. for Work Order Provided by the Divisions as per PHED-MIS
|
Order Date
Date of Issuance of the Work Order as per PHED-MIS
|
work_name
Name of the Work as per the Issued Work Order
|
Bill Gross Amount | Voucher Number | Voucher Date | System Voucher Number |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 0 | 265.95 | |||||||||||
| 1 | Siliguri W/S Division | BILL/00127/2025-2026 | 26/06/2025 | NARAYAN CH GHOSH | ORD/000172/2023-2024 | 1734/SWSD | 22/09/2023 | Acceptance cum work order for laying of rising main, distribution system of pipeline, construction of pump houses, boundary wall, sinking of Rig bore deep tube well by Odex-165 method of drilling, development of land and other allied works for Augmentatio | 16.05 | BP-2026-27-7 | 09/10/2026 | VCH/000217/2026-2027 |
| 2 | Siliguri W/S Division | BILL/00225/2025-2026 | 28/08/2025 | KRISHNA TRADING CO. | ORD/000183/2023-2024 | 1812/SWSD | 03/10/2023 | Work Order for Construction of 250 cu.m. capacity R.C.C. Elevated Reservoir , 20 Mtrs. Staging height at the head work site including distribution system (HDPE) with rising main, Rig bore 2 nos. big dia T/W by Odex-165 method, providing functional househo | 144.50 | 01000300794/803 | 09/10/2026 | VCH/000201/2026-2027 |
| 3 | Siliguri W/S Division | BILL/00380/2024-2025 | 17/12/2024 | SUDIP BASAK | ORD/000245/2022-2023 | 2094/SWSD | 22/12/2022 | Construction of Pump House (5.4 X 3.65) size, Rig Bore Big Dia Deep Tubewell by ODEX-165 method of drilling, boundary wall allied with laying of rising main, distribution system and providing functional household tap connection (FHTC) under JJM for M.M. T | 42.97 | 01000300822 | 09/10/2026 | VCH/000537/2024-2025 |
| 4 | Siliguri W/S Division | BILL/00388/2024-2025 | 23/12/2024 | EASHAN POLYMERS PRIVATE LIMITED | ORD/000197/2023-2024 | 1977/SWSD | 26/10/2023 | Work Order for Construction of 200 cu.m capacity Elevated Reservoir 20 m staging height allied with laying of distribution pipeline, Rising Main, Construction of 3 nos Big dia rig bore tube well by ODEX 165, Pump House (5.4 X 3.60 m), Iron Elemination Pla | 62.43 | BP-2026-27-26 | 09/10/2026 | VCH/000207/2026-2027 |
| Total | 265.95 | |||||||||||