No. of unauthorized payments
Exception Report Showing the Status of Major Pending Works for the Divisions

Update Data
Rs. in Lakh
Sl. No. Division
Working Divisions
Bill Number Bill Date
Date of Issuance of the Work Order as per PHED-MIS
Vendor Name
Vendor Appointed Against this Work Order as per PHED-MIS
System Order Number
System generated Order No. for the Work Order as per PHED-MIS
Memo Number
Memo no. for Work Order Provided by the Divisions as per PHED-MIS
Order Date
Date of Issuance of the Work Order as per PHED-MIS
work_name
Name of the Work as per the Issued Work Order
Bill Gross Amount Voucher Number Voucher Date System Voucher Number
0 3,314.25  
1 Birbhum Division BILL/00139/2024-2025 16/05/2024 RAMESH AND SHANTI ENGINEERING WORKS ORD/000469/2023-2024 503/BHM 02/02/2024 Continuation Work Order for Supply and delivery of Sluice Valve for Augmentation of Kirnahar Zone-II W/S Scheme under Birbhum Division, P.H.E. Dte. including loading, carriage and unloading at Birbhum Divisional Store at PHE Complex, Dist.-Birbhum unde 8.19 BP-2024-25-81 03/06/2024 VCH/000124/2024-2025
2 Birbhum Division BILL/00209/2024-2025 28/05/2024 ENVIROTECH SOLUTIONS ORD/000841/2022-2023 435/RSD 21/11/2022 Continuation Work Order for Preparation & Submission of DPR for (MAHESHA) Water Supply Scheme (Part-B) under Mayureswar-II Development Block. 3.53 BP-2024-25-84 04/06/2024 VCH/000138/2024-2025
3 Birbhum Division BILL/00213/2024-2025 28/05/2024 ENVIROTECH SOLUTIONS ORD/000845/2022-2023 438/RSD 29/11/2022 Continuation Work Order for Preparation & Submission of DPR for (SULTANPUR) Water Supply Scheme (Part-B) under Mayureswar-II Development Block 3.50 BP-2024-25-84 04/06/2024 VCH/000135/2024-2025
4 Birbhum Division BILL/00228/2024-2025 31/05/2024 SUNIL RABI DAS ORD/000239/2022-2023 2203/BHM 12/10/2022 Construction of 1000 Cum capacity 20mtr. Staging height RCC Over Head Reservoir over RCC pile foundation including pipe connection & allied works for Augmentation of Lohapur Water Supply Scheme under Birbhum Division, PHE Dte. (As per Departmental Drawin 40.16 BP-2024-25-83 03/06/2024 VCH/000120/2024-2025
5 Birbhum Division BILL/00283/2024-2025 14/06/2024 M/S GOUTAM DAS ORD/000692/2021-2022 1467/BHM 03/09/2021 Community based Water purification system with FLUORIDE TREATMENT UNIT for Fluoride Affected Habitations at Village Rajnagar, under Rajnagar Block within Birbhum Division, P.H.E. Dte. (Sl. No.2) 4.33 BP-2024-25-104 18/06/2024 VCH/000186/2024-2025
6 Birbhum Division BILL/00393/2024-2025 16/07/2024 JAMSED ALI KHAN ORD/000431/2023-2024 4180/BHM 31/10/2023 Continution work for Supply of one no. Diesel driven Motor Cab / Maxi Cab (Air Condition) on hire Basis under the Assitant Engineer (H.Q) Birbhum Division P.H.E Dte. (Period from 01.11.2023 to 30.04.2024) 0.39 BP-2024-25-141 22/07/2024 VCH/000263/2024-2025
7 Birbhum Division BILL/00395/2024-2025 16/07/2024 LUMINO SMC JV ORD/000392/2023-2024 4123/BHM 17/10/2023 Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & Different works including Laying of Distribution System, providing FHTCs and construction of switch rooms & Boundary wallswith gates in co 73.68 BP-2024-25-140 22/07/2024 VCH/000268/2024-2025
8 Birbhum Division BILL/00193/2024-2025 28/05/2024 ENVIROTECH SOLUTIONS ORD/000803/2022-2023 360/RSD 20/09/2022 Continuation Work Order for Preparation & Submission of DPR for (BIRCHANDRAPUR) Water Supply Scheme (Part-B) under Mayureswar-I Development Block. 3.30 BP-2024-25-84 04/06/2024 VCH/000142/2024-2025
9 Birbhum Division BILL/00251/2024-2025 10/06/2024 ZEBA CONSTRUCTION ORD/000004/2023-2024 1083/BHM 06/04/2023 Different works related to water supply scheme at DABUK & its adjoining mouzas water supply scheme within MAYURESWAR-I Block including supply of all labour & materials under BIRBHUM Division, PHE Dte. 66.65 BP-2024-25-94 11/06/2024 VCH/000163/2024-2025
10 Birbhum Division BILL/00269/2024-2025 13/06/2024 APEX ENGINEERING ORD/000660/2022-2023 193/BSD 17/05/2022 Continuation work order for "Preparation & Submission of Detail Project Report (DPR) for SHEKHAMPUR Piped Water Supply Scheme under Labpur Development Block within Bolpur Sub-Division under Birbhum Division, PHE Dte." 3.80 BP-2024-25-97 14/06/2024 VCH/000178/2024-2025
11 Birbhum Division BILL/00271/2024-2025 13/06/2024 APEX ENGINEERING ORD/000955/2022-2023 305/BSD 12/08/2022 Continuation work for "Preparation & Submission of Detail Project Report (DPR) for PUNNA Piped Water Supply Scheme within the command area of Labpur Development Block within Bolpur Sub-Division under Birbhum Division, PHE Dte.". 1.14 BP-2024-25-97 14/06/2024 VCH/000176/2024-2025
12 Birbhum Division BILL/00272/2024-2025 13/06/2024 APEX ENGINEERING ORD/000654/2022-2023 146/BSD 12/04/2022 Continuation work order for "Preparation & Submission of Detail Project Report (DPR) for FARIDPUR Piped Water Supply Scheme under Labpur Development Block within Bolpur Sub-Division under Birbhum Division, PHE Dte." 3.69 BP-2024-25-97 14/06/2024 VCH/000180/2024-2025
13 Birbhum Division BILL/00278/2024-2025 13/06/2024 APEX ENGINEERING ORD/000658/2022-2023 179/BSD 05/05/2022 Continuation work order for "Preparation & Submission of Detail Project Report (DPR) for PANCHPARA Piped Water Supply Scheme under Labpur Development Block within Bolpur Sub-Division under Birbhum Division, PHE Dte." 3.19 BP-2024-25-97 14/06/2024 VCH/000168/2024-2025
14 Birbhum Division BILL/00282/2024-2025 14/06/2024 B RAI CONSTRUCTION COMPANY ORD/000189/2023-2024 2262/BHM 12/07/2023 Different works related to water supply scheme at PASCHIM NAOPARA, PHULUR & PURBA SIUR its adjoining mouzas water supply scheme within SAINTHIA Block under Birbhum Division, PHE Dte. 149.34 BP-2024-25-105 18/06/2024 VCH/000187/2024-2025
15 Birbhum Division BILL/00353/2024-2025 28/06/2024 SUNIL RABI DAS ORD/000191/2023-2024 3019/BHM 14/07/2023 Different works related to water supply scheme at Jijigram, Math Basori & Bilaspur and its adjoining mouzas water supply scheme within MURARAI-II Block including supply of all labour & materials under BIRBHUM Division, PHE Dte. 245.93 BP-2024-25-124 08/07/2024 VCH/000239/2024-2025
16 Birbhum Division BILL/00358/2024-2025 08/07/2024 BRAHMA CONSTRUCTION COMPANY ORD/000056/2023-2024 1245/BHM 17/04/2023 Different works related to water supply scheme at DERPUR, KURUMSAHA & MATIARA and its adjoining mouzas water supply scheme within SAINTHIA Block including supply of all labour & materials under Birbhum Division, PHE Dte. 125.12 BP-2024-25-128 10/07/2024 VCH/000243/2024-2025
17 Birbhum Division BILL/00208/2024-2025 28/05/2024 ENVIROTECH SOLUTIONS ORD/000840/2022-2023 324/RSD 08/09/2022 Continuation Work Order for Preparation & Submission of DPR for (MAHESHA) Water Supply Scheme (Part-A) under Mayureswar-II Development Block. 2.55 BP-2024-25-84 04/06/2024 VCH/000137/2024-2025
18 Birbhum Division BILL/00211/2024-2025 28/05/2024 ENVIROTECH SOLUTIONS ORD/000843/2022-2023 437/RSD 25/11/2022 Continuation Work Order for Preparation & Submission of DPR for (PRAYAGPUR) Water Supply Scheme (Part-B) under Mayureswar-II Development Block. 2.40 BP-2024-25-84 04/06/2024 VCH/000141/2024-2025
19 Birbhum Division BILL/00219/2024-2025 30/05/2024 M/S SAHA AND MONDAL CONSTRUCTION ORD/000389/2023-2024 4145/BHM 19/10/2023 Different works related to water supply scheme at GULALGACHI & its adjoining mouzas Water Supply Scheme within RAJNAGAR Block including supply of all labour & materials under Birbhum Division, PHE Dte 101.53 BP-2024-25-79 03/06/2024 VCH/000129/2024-2025
20 Birbhum Division BILL/00225/2024-2025 30/05/2024 M/S SARADA CONSTRUCTION. ORD/000462/2023-2024 13/RWS 25/01/2024 Supply & Installtion of 1 No existing AC machine & other work related to NABL Requirement at Birbhum District Water Testing Laboratory at Suri under Birbhum Division PHE Dte. 0.70 BP-2024-25-76 03/06/2024 VCH/000126/2024-2025
21 Birbhum Division BILL/00227/2024-2025 30/05/2024 RADIANT ORD/000859/2022-2023 93/BSSD 27/05/2022 Preparation & Submission of DPR for Pump House cum Chlorine Room, Boundary Wall, Soil Investigation Report, Construction Over Head Reservoir (OHR), Construction of Pipe carrying structure, Service Road at Head Work Site & Land Development, FHTC Connectio 2.22 BP-2024-25-82 03/06/2024 VCH/000128/2024-2025
22 Birbhum Division BILL/00285/2024-2025 14/06/2024 M/S R B ENTERPRISE ORD/000011/2023-2024 1096/BHM 06/04/2023 Different works related to water supply scheme at HATKALUA PIPED WATER SUPPLY SCHEME (TSM/016242) within LABPUR Block including supply of all labour & materials under Bolpur Sub-Division within Birbhum Division, PHE Dte. 17.22 BP-2024-25-116 08/07/2024 VCH/000231/2024-2025
23 Birbhum Division BILL/00286/2024-2025 14/06/2024 MANASH GHOSH ORD/000661/2021-2022 1556/BHM 16/09/2021 Community based Water Supply arrangement for Fluoride Affected Habitations with SOLAR Power Connection at Village Baidhara (2 Nos. Tubewell) under Block¿Rampurhar¿I, Barmillaka (1 No. Tube well) Block ¿Rampurhar¿II & Sharpur Block-Nalhati-I within Birbhum 15.94 BP-2024-25-103 18/06/2024 VCH/000185/2024-2025
24 Birbhum Division BILL/00288/2024-2025 18/06/2024 MANASH GHOSH ORD/000207/2023-2024 3257/BHM 26/07/2023 Different works related to water supply scheme at NAWAPARA & PRASADPUR and its adjoining mouzas water supply scheme within NALHATI-II Block including supply of all labour & materials under Birbhum Division, PHE Dte. 33.82 BP-2024-25-106 19/06/2024 VCH/000190/2024-2025
25 Birbhum Division BILL/00373/2024-2025 15/07/2024 SOUMITA PAL ORD/000228/2023-2024 199/RSD 28/07/2023 Hiring of Ambassador Car (Diesel) registered Luxury Taxi for the office of the Assistant Engineer, Rampurhat Sub-Division P.H.E. Dte. for 24 hours service including Driver and also including the cost of fuel & lubricants as per terms & condition with effe 0.36 BP-2024-25-137 22/07/2024 VCH/000256/2024-2025
26 Birbhum Division BILL/00198/2024-2025 28/05/2024 ENVIROTECH SOLUTIONS ORD/000807/2022-2023 403/RSD 13/10/2022 Continuation Work Order for Preparation & Submission of DPR for (Lachhiator) Water Supply Scheme (Part-B) under Mayureswar-I Development Block. 3.46 BP-2024-25-84 04/06/2024 VCH/000148/2024-2025
27 Birbhum Division BILL/00201/2024-2025 28/05/2024 ENVIROTECH SOLUTIONS ORD/000831/2022-2023 443/RSD 02/12/2022 Continuation Work Order for Preparation & Submission of DPR for (Bara Turigram) Water Supply Scheme (Part-C) under Mayureswar-I Development Block. 1.21 BP-2024-25-84 04/06/2024 VCH/000145/2024-2025
28 Birbhum Division BILL/00249/2024-2025 10/06/2024 M/S TAPAS KUMAR CHAKRABORTY ORD/000402/2023-2024 4139/BHM 18/10/2023 Different works related to water supply scheme at IKSHUDHARA, KANKALITALA, KASBA & KENDANGAL Piped Water Supply Scheme within BOLPUR-SRINIKETAN Block including supply of all labour & materials under BIRBHUM Division, PHE Dte. 234.08 BP-2024-25-95 11/06/2024 VCH/000164/2024-2025
29 Birbhum Division BILL/00255/2024-2025 10/06/2024 AKASH CONSTRUCTION ORD/000080/2023-2024 1423/BHM 25/04/2023 Different works related to water supply scheme at Dalima, Kahinagar & Dumurgram and its adjoining mouzas water supply scheme within MURARAI-I Block including supply of all labour & materials under BIRBHUM Division, PHE Dte. 163.02 BP-2024-25-96 11/06/2024 VCH/000165/2024-2025
30 Birbhum Division BILL/00259/2024-2025 11/06/2024 NEEL ENTERPRISE ORD/001195/2021-2022 354/BSSD 27/10/2021 Proposed renovation for NABL recognition of Patelnagar Sub District Laboratory under Birbhum Division P.H.E. Dte. Dist: Birbhum. (Sl. No. - 02) 0.95 BP-2024-25-101 14/06/2024 VCH/000167/2024-2025
31 Birbhum Division BILL/00346/2024-2025 28/06/2024 M/S.SUMAN CONSTRUCTION ORD/000161/2023-2024 2065/BHM 08/06/2023 Different works related to Water Supply Scheme at SULTANPUR & its adjoining mouzas Water Supply Scheme within MAYURESWAR-II Block including supply of all labour & materials under BIRBHUM Division, PHE Dte. 78.15 BP-2024-25-119 08/07/2024 VCH/000234/2024-2025
32 Birbhum Division BILL/00351/2024-2025 28/06/2024 CHAYAN KUMAR MONDAL ORD/000589/2023-2024 753/BHM 29/02/2024 Laying of 140 mm HDPE (PE 100, PN-6) pipeline with shifting of existing pipeline for crossing of irrigation canal due to construction of 02 (Two) nos. new bridge of Bahiri under Bolpur Sub-Division, PHE Dte. within Birbhum Division, PHE Dte. (2nd Call) 2.31 BP-2024-25-123 08/07/2024 VCH/000238/2024-2025
33 Birbhum Division BILL/00220/2024-2025 30/05/2024 PREMANANDA ROY BISWAS ORD/000432/2023-2024 4181/BHM 31/10/2023 Continution work for Supply of one no. Diesel Motor Cab/Maxi Cub (Air Condition) on hire basis under the Executive Engineer Birbhum Division P.H.E Dte (Period From 01.11.2023 to 30.04.2024) 1.58 BP-2024-25-86 04/06/2024 VCH/000130/2024-2025
34 Birbhum Division BILL/00221/2024-2025 30/05/2024 PREMANANDA ROY BISWAS ORD/000432/2023-2024 4181/BHM 31/10/2023 Continution work for Supply of one no. Diesel Motor Cab/Maxi Cub (Air Condition) on hire basis under the Executive Engineer Birbhum Division P.H.E Dte (Period From 01.11.2023 to 30.04.2024) 0.78 BP-2024-25-86 04/06/2024 VCH/000131/2024-2025
35 Birbhum Division BILL/00226/2024-2025 30/05/2024 M/S SARADA CONSTRUCTION. ORD/000587/2023-2024 15/RWS 02/02/2024 Continuation Work Order for Supply & installation of 1 No. existing AC machine & other work related to NABL Requirement at Birbhum District Water Testing Laboratory at Suri under Birbhum Division PHE Dte. 0.70 BP-2024-25-76 03/06/2024 VCH/000127/2024-2025
36 Birbhum Division BILL/00367/2024-2025 10/07/2024 B RAI CONSTRUCTION COMPANY ORD/000385/2023-2024 4142/BHM 19/10/2023 Different works related to water supply scheme at LACHHIATOR, DAKSHINGRAM, SONJ & SHIBGRAM and its adjoining mouzas water supply scheme within MAYURESWAR-I Block including supply of all labour & materials under Birbhum Division, PHE Dte. 224.10 BP-2024-25-130 15/07/2024 VCH/000245/2024-2025
37 Birbhum Division BILL/00368/2024-2025 10/07/2024 PRASANTA KUMAR MUKHERJEE ORD/000359/2023-2024 3953/BHM 03/10/2023 Sinking replacement of 200mm dia Tube Well of UPVC pipe 90m deep with fibre glass strainer including connecting main for Haridaspur PWSS under Nalhati Sub- Division within Birbhum Division PHED 13.73 BP-2024-25-132 15/07/2024 VCH/000247/2024-2025
38 Birbhum Division BILL/00369/2024-2025 10/07/2024 M H CONSTRUCTION ORD/000353/2023-2024 3959/BHM 03/10/2023 Construction of 2 no Pump House of 5.40 mtr X 3.6 mtr. Size with sanitary and water supply arrangements at Dantura PWSS, under Nalhati Sub-Division within Birbhum division, P.H.E. Dte. 9.53 BP-2024-25-131 15/07/2024 VCH/000246/2024-2025
39 Birbhum Division BILL/00378/2024-2025 15/07/2024 SOUMITA PAL ORD/000459/2023-2024 27/RSD 22/01/2024 Hiring of Ambassador Car (Diesel) registered Luxury Taxi for the office of the Assistant Engineer, Rampurhat Sub-Division P.H.E. Dte. for 24 hours service including Driver and also including the cost of fuel & lubricants as per terms & condition with effe 0.39 BP-2024-25-138 22/07/2024 VCH/000261/2024-2025
40 Birbhum Division BILL/00391/2024-2025 16/07/2024 WEIR AND DECK CONSTRUCTION ENGINEERS CO OP SOCIETY LTD ORD/000945/2021-2022 1555/BHM 16/09/2021 Community based Water Supply arrangement for Fluoride Affected Habitations with SOLAR Power Connection at Village Beguna Muslimpara (1 No. Tubewell) under Block-Mayureswar-I, Bahadurganja (1 No. Tubewell) Block-Md Bazar & Mandala (1 No. Tubewell) Block-Ra 12.98 BP-2024-25-145 22/07/2024 VCH/000254/2024-2025
41 Birbhum Division BILL/00199/2024-2025 28/05/2024 ENVIROTECH SOLUTIONS ORD/000830/2022-2023 422/RSD 03/11/2022 Continuation Work Order for Preparation & Submission of DPR for (Bara Turigram) Water Supply Scheme (Part-B) under Mayureswar-I Development Block. 3.23 BP-2024-25-84 04/06/2024 VCH/000143/2024-2025
42 Birbhum Division BILL/00270/2024-2025 13/06/2024 APEX ENGINEERING ORD/000950/2022-2023 266/BSD 11/07/2022 Continuation work for "Preparation & Submission of Detail Project Report (DPR) for PUNNA Piped Water Supply Scheme within the command area of Labpur Development Block within Bolpur Sub-Division under Birbhum Division, PHE Dte.¿. 4.11 BP-2024-25-97 14/06/2024 VCH/000177/2024-2025
43 Birbhum Division BILL/00349/2024-2025 28/06/2024 JOY CHAND MAL ORD/000699/2023-2024 57/NSD 14/03/2024 Hiring of SWIFT DZIRE (diesel) registered luxury car for the office of the Assistant Engineer, Nalhati Sub-Division P.H.E. Dte. for 24 hours service including Driver and the cost of fuel & lubricants as per terms & condition with effect from 01.04.2024 to 0.39 BP-2024-25-114 08/07/2024 VCH/000229/2024-2025
44 Birbhum Division BILL/00210/2024-2025 28/05/2024 ENVIROTECH SOLUTIONS ORD/000842/2022-2023 333/RSD 08/09/2022 Continuation Work Order for Preparation & Submission of DPR for (PRAYAGPUR) Water Supply Scheme (Part-A) under Mayureswar-II Development Block. 2.28 BP-2024-25-84 04/06/2024 VCH/000140/2024-2025
45 Birbhum Division BILL/00231/2024-2025 31/05/2024 DISTRICT HEALTH & FAMILY WELFARE SAMITI RAMPURHAT HEALTH DISTRICT null DHFWS/RPH/1164 06/05/2024 Collection & testing of drinking water sample and details information like geographical location GP name /Mouja/habitation location of source with reference household & institution viz schools. angawaris etc. through FTKs & uploading charges related to wa 20.16 BP-2024-25-110 20/06/2024 VCH/000206/2024-2025
46 Birbhum Division BILL/00284/2024-2025 14/06/2024 GB CONSTRUCTION ORD/000580/2023-2024 445/BHM 01/02/2024 Survey, Planning, Design, Supply, Delivery, Erection, Construction, Commissioning and Completion in all respect all Civil and E&M Works including all allied, related and Enabling Works for 5.0 MGD capacity Radial Collector Well, Access Bridge, Substation 499.78 BP-2024-25-110 20/06/2024 VCH/000207/2024-2025
47 Birbhum Division BILL/00289/2024-2025 18/06/2024 SK ALIM ORD/000596/2022-2023 1059/BHM 31/03/2023 Different works related to water supply scheme at KANIOR, KOGRAM & KUSHIPUR PWSS & its adjoining mouzas water supply scheme within Nalhati I Block including supply of all labour & materials under BIRBHUM Division, PHE Dte. 106.53 BP-2024-25-107 19/06/2024 VCH/000189/2024-2025
48 Birbhum Division BILL/00366/2024-2025 10/07/2024 KHAYRASOLE PALLY MANGAL SAMITY ORD/000691/2023-2024 138/BSSD 28/03/2024 Extension/Continuation work order for Engagement of Lab Personnel for the period from 01.04.2024 to 30.09.2024. 0.43 BP-2024-25-135 15/07/2024 VCH/000249/2024-2025
49 Birbhum Division BILL/00398/2024-2025 16/07/2024 SK AKRAM HOSSAIN ORD/000704/2023-2024 269/BSD 15/03/2024 Hiring of 01 (One) no. vehicle for the Office of the Assistant Engineer, Bolpur Sub-Division, P.H.E Dte. under Birbhum Division, P.H.E Dte. For the period of 01.04.2024 to 30.09.2024. 0.40 BP-2024-25-142 22/07/2024 VCH/000267/2024-2025
50 Birbhum Division BILL/00972/2023-2024 15/03/2024 MA KANKALI ENTERPRISE ORD/000472/2022-2023 222/BHM 20/01/2023 Additional work for providing Balance FHTC including laying of distribution system for village Geruapahari JL NO 74,G.P Babuijore, Block- Khoirasole for ensuing draught line situation within Birbhum Division PHE Dte. (Sl. No.8) 0.58 BP-2024-25-75 03/06/2024 VCH/001151/2023-2024
51 Birbhum Division BILL/00194/2024-2025 28/05/2024 ENVIROTECH SOLUTIONS ORD/000802/2022-2023 286/RSD 29/08/2022 Continuation Work Order for Preparation & Submission of DPR for (BIRCHANDRAPUR) Water Supply Scheme (Part-A) under Mayureswar-I Development Block. 2.91 BP-2024-25-84 04/06/2024 VCH/000150/2024-2025
52 Birbhum Division BILL/00200/2024-2025 28/05/2024 ENVIROTECH SOLUTIONS ORD/000829/2022-2023 310/RSD 08/09/2022 Continuation Work Order for Preparation & Submission of DPR for (Bara Turigram) Water Supply Scheme (Part-A) under Mayureswar-I Development Block. 3.56 BP-2024-25-84 04/06/2024 VCH/000144/2024-2025
53 Birbhum Division BILL/00204/2024-2025 28/05/2024 ENVIROTECH SOLUTIONS ORD/000835/2022-2023 371/RSD 21/09/2022 Continuation Work Order for Preparation & Submission of DPR for (CHHAMNA) Water Supply Scheme (Part-B) under Mayureswar-II Development Block. 2.38 BP-2024-25-84 04/06/2024 VCH/000151/2024-2025
54 Birbhum Division BILL/00246/2024-2025 07/06/2024 QUALITY COUNCIL OF INDIA null AAFEE/3215/23-24 11/08/2023 TC-10930 CERTIFICATE PERIOD 24.08.2022-23.08.2024 DUE PERIOD 24.08.2023-23.08.2024 (Chemical year of Accreditation Cycle) 0.28 BP-2024-25-111 28/06/2024 VCH/000223/2024-2025
55 Birbhum Division BILL/00250/2024-2025 10/06/2024 APURBA MONDAL ORD/000098/2023-2024 1980/BHM 05/06/2023 Different works related to water supply scheme at BHEJENA & its adjoining mouzas water supply scheme within MD BAZAR Block including supply of all labour & materials under BIRBHUM Division, PHE Dte. 62.79 BP-2024-25-89 11/06/2024 VCH/000158/2024-2025
56 Birbhum Division BILL/00274/2024-2025 13/06/2024 APEX ENGINEERING ORD/000656/2022-2023 163/BSD 25/04/2022 Continuation work order for "Preparation & Submission of Detail Project Report (DPR) for KHAYERBANI Piped Water Supply Scheme under Labpur Development Block within Bolpur Sub-Division under Birbhum Division, PHE Dte." 2.53 BP-2024-25-97 14/06/2024 VCH/000171/2024-2025
57 Birbhum Division BILL/00275/2024-2025 13/06/2024 APEX ENGINEERING ORD/000661/2022-2023 208/BSD 25/05/2022 Continuation work order for "Preparation & Submission of Detail Project Report (DPR) for THIBA Piped Water Supply Scheme under Labpur Development Block within Bolpur Sub-Division under Birbhum Division, PHE Dte." 2.62 BP-2024-25-97 14/06/2024 VCH/000179/2024-2025
58 Birbhum Division BILL/00277/2024-2025 13/06/2024 APEX ENGINEERING ORD/000657/2022-2023 172/BSD 29/04/2022 Continuation work Order for "Preparation & Submission of Detail Project Report (DPR) for MASTALI Piped Water Supply Scheme under Labpur Development Block within Bolpur Sub-Division under Birbhum Division, PHE Dte." 2.59 BP-2024-25-97 14/06/2024 VCH/000188/2024-2025
59 Birbhum Division BILL/00343/2024-2025 28/06/2024 APEX ENGINEERING ORD/000951/2022-2023 268/BSD 15/07/2022 Continuation work for "Preparation & Submission of Detail Project Report (DPR) for TATINAPARA Piped Water Supply Scheme within the command area of Labpur Development Block within Bolpur Sub-Division under Birbhum Division, PHE Dte.¿. 4.59 BP-2024-25-115 08/07/2024 VCH/000230/2024-2025
60 Birbhum Division BILL/00359/2024-2025 08/07/2024 S K CONSTRUCTION ORD/000190/2023-2024 3020/BHM 14/07/2023 Different works related to Water Supply Scheme at CHHAMNA & its adjoining mouzas Water Supply Scheme within MAYURESWAR-II Block including supply of all labour & materials under BIRBHUM Division, PHE Dte. 125.44 BP-2024-25-129 10/07/2024 VCH/000244/2024-2025
61 Birbhum Division BILL/00055/2024-2025 24/04/2024 SSPR VALVE MANUFACTURING PVT LTD ORD/000347/2023-2024 3946/BHM 03/10/2023 Supply and delivery of Sluice Valve for Augmentation of Kirnahar Zone-I W/S Scheme under Birbhum Division, P.H.E. Dte. including loading, carriage and unloading at Birbhum Divisional Store at PHE Complex, Dist.-Birbhum under Birbhum Division, P.H.E. Dte 9.43 BP-2024-25-87 04/06/2024 VCH/000121/2024-2025
62 Birbhum Division BILL/00230/2024-2025 31/05/2024 DISTRICT HEALTH AND FAMILY WELFARE SAMITY (DHFWS), BIRBHUM null DHFWS/ACCT/697 05/04/2024 Collection & testing of drinking water sample and details information like geographical location GP name /Mouja/habitation location of source with reference household & institution viz schools. angawaris etc. through FTKs & uploading charges related to wa 21.30 BP-2024-25-109 20/06/2024 VCH/000205/2024-2025
63 Birbhum Division BILL/00376/2024-2025 15/07/2024 SOUMITA PAL ORD/000459/2023-2024 27/RSD 22/01/2024 Hiring of Ambassador Car (Diesel) registered Luxury Taxi for the office of the Assistant Engineer, Rampurhat Sub-Division P.H.E. Dte. for 24 hours service including Driver and also including the cost of fuel & lubricants as per terms & condition with effe 0.39 BP-2024-25-138 22/07/2024 VCH/000259/2024-2025
64 Birbhum Division BILL/00377/2024-2025 15/07/2024 SOUMITA PAL ORD/000459/2023-2024 27/RSD 22/01/2024 Hiring of Ambassador Car (Diesel) registered Luxury Taxi for the office of the Assistant Engineer, Rampurhat Sub-Division P.H.E. Dte. for 24 hours service including Driver and also including the cost of fuel & lubricants as per terms & condition with effe 0.39 BP-2024-25-138 22/07/2024 VCH/000260/2024-2025
65 Birbhum Division BILL/00379/2024-2025 15/07/2024 JOY CHAND MAL ORD/000699/2023-2024 57/NSD 14/03/2024 Hiring of SWIFT DZIRE (diesel) registered luxury car for the office of the Assistant Engineer, Nalhati Sub-Division P.H.E. Dte. for 24 hours service including Driver and the cost of fuel & lubricants as per terms & condition with effect from 01.04.2024 to 0.38 BP-2024-25-139 22/07/2024 VCH/000265/2024-2025
66 Birbhum Division BILL/00394/2024-2025 16/07/2024 JAMSED ALI KHAN ORD/000431/2023-2024 4180/BHM 31/10/2023 Continution work for Supply of one no. Diesel driven Motor Cab / Maxi Cab (Air Condition) on hire Basis under the Assitant Engineer (H.Q) Birbhum Division P.H.E Dte. (Period from 01.11.2023 to 30.04.2024) 0.39 BP-2024-25-141 22/07/2024 VCH/000264/2024-2025
67 Birbhum Division BILL/00192/2024-2025 28/05/2024 ENVIROTECH SOLUTIONS ORD/000832/2022-2023 327/RSD 08/09/2022 Continuation Work Order for Preparation & Submission of DPR for (Sonj) Water Supply Scheme (Part-A) under Mayureswar-I Development Block. 2.43 BP-2024-25-88 04/06/2024 VCH/000133/2024-2025
68 Birbhum Division BILL/00197/2024-2025 28/05/2024 ENVIROTECH SOLUTIONS ORD/000806/2022-2023 295/RSD 07/09/2022 Continuation Work Order for Preparation & Submission of DPR for (Lachhiator) Water Supply Scheme (Part-A) under Mayureswar-I Development Block. 2.19 BP-2024-25-84 04/06/2024 VCH/000149/2024-2025
69 Birbhum Division BILL/00202/2024-2025 28/05/2024 ENVIROTECH SOLUTIONS ORD/000833/2022-2023 428/RSD 09/11/2022 Continuation Work Order for Preparation & Submission of DPR for (Sonj) Water Supply Scheme (Part-B) under Mayureswar-I Development Block. 2.17 BP-2024-25-88 04/06/2024 VCH/000132/2024-2025
70 Birbhum Division BILL/00205/2024-2025 28/05/2024 ENVIROTECH SOLUTIONS ORD/000836/2022-2023 292/RSD 02/09/2022 Continuation Work Order for Preparation & Submission of DPR for (CHHOTA TURIGRAM ) Water Supply Scheme (Part-A) under Mayureswar-II Development Block. 2.46 BP-2024-25-84 04/06/2024 VCH/000154/2024-2025
71 Birbhum Division BILL/00253/2024-2025 10/06/2024 AJIMUL ISLAM ORD/000128/2023-2024 2073/BHM 08/06/2023 Sinking of 1 no. new 200mm dia Tube Well of UPVC pipe 90m deep with fibre glass strainer including connecting main for Rajgram PWSS at Jagannathpur CWR site under Nalhati Sub- Division within Birbhum Division PHED. 5.54 BP-2024-25-91 11/06/2024 VCH/000160/2024-2025
72 Birbhum Division BILL/00268/2024-2025 13/06/2024 APEX ENGINEERING ORD/000952/2022-2023 293/BSD 29/07/2022 Continuation work for "Preparation & Submission of additional Detail Project Report (DPR) for DULASAHAPARA Piped Water Supply Scheme within the command area of Labpur Development Block within Bolpur Sub-Division under Birbhum Division, PHE Dte.". 1.27 BP-2024-25-97 14/06/2024 VCH/000173/2024-2025
73 Birbhum Division BILL/00276/2024-2025 13/06/2024 APEX ENGINEERING ORD/000659/2022-2023 185/BSD 11/05/2022 Continuation work order for "Preparation & Submission of Detail Project Report (DPR) for RANIPARA Piped Water Supply Scheme under Labpur Development Block within Bolpur Sub-Division under Birbhum Division, PHE Dte." 2.53 BP-2024-25-97 14/06/2024 VCH/000183/2024-2025
74 Birbhum Division BILL/00280/2024-2025 13/06/2024 APEX ENGINEERING ORD/001135/2021-2022 100/BSD 15/03/2022 Preparation & Submission of Detail Project Report (DPR) for MONACHITURA Piped Water Supply Scheme under Labpur Development Block within Bolpur Sub-Division under Birbhum Division, PHE Dte. 4.39 BP-2024-25-97 14/06/2024 VCH/000169/2024-2025
75 Birbhum Division BILL/00348/2024-2025 28/06/2024 INDRAJIT DAS ORD/000534/2022-2023 665/BHM 28/02/2023 Balance FHTC works at different Villages within coverage area of Tilutia Water Supply Scheme (Zone-II) under Bolpur Sub-Division within Birbhum Division, PHE Dte. (Sl. No.10) 7.61 BP-2024-25-121 08/07/2024 VCH/000236/2024-2025
76 Birbhum Division BILL/00360/2024-2025 08/07/2024 INDRANIL DUTTA ORD/000511/2023-2024 651/BHM 20/02/2024 Trial Bore and new Sinking of 200 mm dia. tubewell 5 (Five) nos. each 39 m. Deep fitted with PVC Housing pipe and Fibre Glass Strainer on the river bank of Mayurakshi under Bandirban (Kanmara) Piped Water Supply Scheme within Birbhum Division PHE Dte. (P 10.51 BP-2024-25-125 10/07/2024 VCH/000240/2024-2025
77 Birbhum Division BILL/00207/2024-2025 28/05/2024 ENVIROTECH SOLUTIONS ORD/000838/2022-2023 296/RSD 07/09/2022 Continuation Work Order for Preparation & Submission of DPR for (DUNA) Water Supply Scheme (Part-A) under Mayureswar-II Development Block. 2.34 BP-2024-25-84 04/06/2024 VCH/000134/2024-2025
78 Birbhum Division BILL/00223/2024-2025 30/05/2024 B RAI CONSTRUCTION COMPANY ORD/000385/2023-2024 4142/BHM 19/10/2023 Different works related to water supply scheme at LACHHIATOR, DAKSHINGRAM, SONJ & SHIBGRAM and its adjoining mouzas water supply scheme within MAYURESWAR-I Block including supply of all labour & materials under Birbhum Division, PHE Dte. 172.79 BP-2024-25-77 03/06/2024 VCH/000136/2024-2025
79 Birbhum Division BILL/00375/2024-2025 15/07/2024 SOUMITA PAL ORD/000228/2023-2024 199/RSD 28/07/2023 Hiring of Ambassador Car (Diesel) registered Luxury Taxi for the office of the Assistant Engineer, Rampurhat Sub-Division P.H.E. Dte. for 24 hours service including Driver and also including the cost of fuel & lubricants as per terms & condition with effe 0.39 BP-2024-25-137 22/07/2024 VCH/000258/2024-2025
80 Birbhum Division BILL/00389/2024-2025 16/07/2024 MS BIMAL MISRA ORD/000766/2021-2022 1551/BHM 16/09/2021 Community based Water Supply arrangement for Fluoride Affected Habitations with SOLAR Power Connection at Village Rautandihi (01 No. Tubewell), Jamsole (1 no.) under Nalhati-I Block & Gopalnagar (01 No. Tubewell) under Dubrajpur Dev. Block within Birbhum 12.98 BP-2024-25-144 22/07/2024 VCH/000253/2024-2025
81 Birbhum Division BILL/00191/2024-2025 28/05/2024 ENVIROTECH SOLUTIONS ORD/000839/2022-2023 423/RSD 03/11/2022 Continuation Work Order for Preparation & Submission of DPR for (DUNA) Water Supply Scheme (Part-B) under Mayureswar-II Development Block. 2.51 BP-2024-25-84 04/06/2024 VCH/000155/2024-2025
82 Birbhum Division BILL/00260/2024-2025 11/06/2024 KANACHI KHADI BHANDAR null PHE/WSSO/112/2827-2844 07/12/2015 Bill for Remuneration of Chemist, Bacteriologist, Lab-Assistant Under Kanachi Khadi Bhandar Sub-District Laboratory (Name of NGO) for the period of MAY- 2024 0.45 BP-2024-25-99 14/06/2024 VCH/000181/2024-2025
83 Birbhum Division BILL/00262/2024-2025 11/06/2024 RAMPURHAT PARIBESH PARISEVA null PHE/WSSO/112/2827-2844 07/12/2015 Bill for Remuneration of Chemist, Bacteriologist, Lab-Assistant Under Rampurhat Paribesh pariseva Sub-District Laboratory (Name of NGO) for the period of MAY-2024 0.45 BP-2024-25-100 14/06/2024 VCH/000182/2024-2025
84 Birbhum Division BILL/00267/2024-2025 13/06/2024 APEX ENGINEERING ORD/000947/2022-2023 232/BSD 10/06/2022 Continuation work for "Preparation & Submission of Detail Project Report (DPR) for DULASAHAPARA Piped Water Supply Scheme within the command area of Labpur Development Block within Bolpur Sub-Division under Birbhum Division, PHE Dte.". 3.98 BP-2024-25-97 14/06/2024 VCH/000174/2024-2025
85 Birbhum Division BILL/00350/2024-2025 28/06/2024 SOURAV MONDAL ORD/000515/2023-2024 663/BHM 20/02/2024 Laying of HDPE distribution parallel pipe line under Maldanga (Zone-I) Piped Water Supply Scheme under Birbhum Division, P.H.E. Dte. 2.45 BP-2024-25-122 08/07/2024 VCH/000237/2024-2025
86 Birbhum Division BILL/00138/2024-2025 16/05/2024 RAMESH AND SHANTI ENGINEERING WORKS ORD/000466/2023-2024 485/BHM 02/02/2024 Continuation work order for Supply and delivery of Sluice Valve for Augmentation of Labpur Zone-I W/S Scheme under Birbhum Division, P.H.E. Dte. including loading, carriage and unloading at Birbhum Divisional Store at PHE Complex, Dist.-Birbhum under Bi 7.69 BP-2024-25-80 03/06/2024 VCH/000123/2024-2025
87 Birbhum Division BILL/00206/2024-2025 28/05/2024 ENVIROTECH SOLUTIONS ORD/000837/2022-2023 380/RSD 26/09/2022 Continuation Work Order for Preparation & Submission of DPR for (CHHOTA TURIGRAM) Water Supply Scheme (Part-B) under Mayureswar-II Development Block. 3.23 BP-2024-25-84 04/06/2024 VCH/000153/2024-2025
88 Birbhum Division BILL/00212/2024-2025 28/05/2024 ENVIROTECH SOLUTIONS ORD/000844/2022-2023 334/RSD 08/09/2022 Continuation Work Order for Preparation & Submission of DPR for (SULTANPUR) Water Supply Scheme (Part-A) under Mayureswar-II Development Block. 2.61 BP-2024-25-84 04/06/2024 VCH/000139/2024-2025
89 Birbhum Division BILL/00233/2024-2025 06/06/2024 SOURAV MONDAL ORD/000520/2023-2024 671/BHM 20/02/2024 Extension of distribution pipe line from Kushmasol to Chandpur, Nichupara and English Medium School and all other allied works for augmentation of Patharchapuri Piped Water Supply Scheme under Birbhum Sadar Sub-Division, P.H.E. Dte. within Birbhum Divisio 5.12 BP-2024-25-93 11/06/2024 VCH/000162/2024-2025
90 Birbhum Division BILL/00287/2024-2025 14/06/2024 MANASH GHOSH ORD/000606/2023-2024 925/BHM 13/03/2024 Allied for Restoration of Existing Bitumious Pucca Road for Laying of Rising Main pipe line from Panchara village to Bahadurpur (Aprox 6 Km) under Panchra Piped Water Supply Scheme under Birbhum Sadar Sub-Division, PHE Dte. within Birbhum Division, P.H.E. 99.56 BP-2024-25-102 18/06/2024 VCH/000184/2024-2025
91 Birbhum Division BILL/00372/2024-2025 15/07/2024 SOUMITA PAL ORD/000228/2023-2024 199/RSD 28/07/2023 Hiring of Ambassador Car (Diesel) registered Luxury Taxi for the office of the Assistant Engineer, Rampurhat Sub-Division P.H.E. Dte. for 24 hours service including Driver and also including the cost of fuel & lubricants as per terms & condition with effe 0.29 BP-2024-25-137 22/07/2024 VCH/000255/2024-2025
92 Birbhum Division BILL/00388/2024-2025 16/07/2024 PURNENDU SAKHAR CHANDRA ORD/000406/2023-2024 4207/BHM 03/11/2023 Construction of Boundary Wall(57.00 m long approx) & Approach Road, Land Development at Pump House-II Site Village- Belgram within the coverage area of Tilutia Water Supply Scheme (Zone-II) under Bolpur Sub-Division within Birbhum Division, PHE Dte 6.84 BP-2024-25-143 22/07/2024 VCH/000251/2024-2025
93 Birbhum Division BILL/00190/2024-2025 28/05/2024 ENVIROTECH SOLUTIONS ORD/000805/2022-2023 376/RSD 23/09/2022 Continuation Work Order for Preparation & Submission of DPR for (DAKSHIN GRAM) Water Supply Scheme (Part-B) under Mayureswar-I Development Block. 2.81 BP-2024-25-84 04/06/2024 VCH/000147/2024-2025
94 Birbhum Division BILL/00252/2024-2025 10/06/2024 SK ALIM ORD/000284/2022-2023 2277/BHM 19/10/2022 Construction of 1000 Cum Capacity and 20.0m Staging Height RCC Over Head Reservoir along with Soil Test and Laying of HDPE pipeline from node point 6 to 13 and node point 272 to 378 and cutting & restoration of concrete road for laying of extension pip 87.02 BP-2024-25-90 11/06/2024 VCH/000159/2024-2025
95 Birbhum Division BILL/00265/2024-2025 13/06/2024 BAHIR CONSTRUCTION PRIVATE LIMITED ORD/000579/2023-2024 737/BHM 28/02/2024 Continuation Work Order for Supply and delivery of Sluice Valve for Augmentation of Khoyrasole Zone-II W/S Scheme under Birbhum Division, P.H.E. Dte. including loading, carriage and unloading at Birbhum Divisional Store at PHE Complex, Dist.-Birbhum un 9.30 BP-2024-25-98 14/06/2024 VCH/000166/2024-2025
96 Birbhum Division BILL/00273/2024-2025 13/06/2024 APEX ENGINEERING ORD/000655/2022-2023 155/BSD 18/04/2022 Continuation work order for "Preparation & Submission of Detail Project Report (DPR) for KADOA Piped Water Supply Scheme under Labpur Development Block within Bolpur Sub-Division under Birbhum Division, PHE Dte." 2.94 BP-2024-25-97 14/06/2024 VCH/000170/2024-2025
97 Birbhum Division BILL/00281/2024-2025 13/06/2024 APEX ENGINEERING ORD/001144/2021-2022 112/BSD 25/03/2022 Continuation work order for "Preparation & Submission of Detail Project Report (DPR) for KURUMBA Piped Water Supply Scheme under Labpur Development Block within Bolpur Sub-Division under Birbhum Division, PHE Dte." 3.40 BP-2024-25-97 14/06/2024 VCH/000172/2024-2025
98 Birbhum Division BILL/00345/2024-2025 28/06/2024 NAUTANDAS AND CO ORD/000047/2023-2024 1258/BHM 17/04/2023 Different works related to water supply scheme at BHALIAN, BANGJITA & BIRSINGHA and its adjoining mouzas water supply scheme within SAINTHIA Block including supply of all labour & materials under Birbhum Division, PHE Dte. 83.96 BP-2024-25-117 08/07/2024 VCH/000232/2024-2025
99 Birbhum Division BILL/00362/2024-2025 08/07/2024 BRAHMA CONSTRUCTION COMPANY ORD/000067/2023-2024 1340/BHM 20/04/2023 Different works related to water supply scheme at MELANPUR & its adjoining mouzas water supply scheme within SAINTHIA Block including supply of all labour & materials under BIRBHUM Division, PHE Dte. 76.00 BP-2024-25-127 10/07/2024 VCH/000242/2024-2025
100 Birbhum Division BILL/00365/2024-2025 08/07/2024 NABIN DEBNATH ORD/000267/2023-2024 3521/BHM 11/08/2023 Construction of 400 cum capacity 20mtr. Staging height RCC Over Head Reservoir over RCC Raft foundation including pipe connection & allied works for augmentation of Bara Zone II W/S Scheme under Nalhati Sub Division with Birbhum Division, PHE Dte.(As p 40.00 BP-2024-25-126 10/07/2024 VCH/000241/2024-2025
101 Birbhum Division BILL/00370/2024-2025 10/07/2024 AVIJIT CHANDA ORD/000473/2022-2023 223/BHM 20/01/2023 Providing necessary water supply arrangement at 17 (Seventeen) Nos Primary School having Electric Power Connection within the command area of Labpur Development Block under Birbhum Division P.H.E.Dte.(Sl. No.5) 4.89 BP-2024-25-133 15/07/2024 VCH/000248/2024-2025
102 Birbhum Division BILL/00371/2024-2025 10/07/2024 A.R. TRADERS ORD/000519/2023-2024 669/BHM 20/02/2024 Sinking replacement of 200mm dia. Tube Well of UPVC pipe 90m deep with fibre glass strainer including connecting main for Raghunathpur PWSS under Nalhati Sub-Division within Birbhum Division, PHED. 14.32 BP-2024-25-136 15/07/2024 VCH/000250/2024-2025
103 Birbhum Division BILL/00374/2024-2025 15/07/2024 SOUMITA PAL ORD/000228/2023-2024 199/RSD 28/07/2023 Hiring of Ambassador Car (Diesel) registered Luxury Taxi for the office of the Assistant Engineer, Rampurhat Sub-Division P.H.E. Dte. for 24 hours service including Driver and also including the cost of fuel & lubricants as per terms & condition with effe 0.38 BP-2024-25-137 22/07/2024 VCH/000257/2024-2025
104 Birbhum Division BILL/00396/2024-2025 16/07/2024 AADIL CONSTRUCTION ORD/000616/2023-2024 481/RWS 28/12/2023 Supply of one no. diesel driven car(Diesel) on hire basis office uses for the officials of the Assistant Engineer, RWS, Birbhum Sub-Division, PHE Dte. (Period from 01.01.2024 to 27.06.2024) 0.39 BP-2024-25-147 22/07/2024 VCH/000252/2024-2025
105 Birbhum Division BILL/00397/2024-2025 16/07/2024 SK AKRAM HOSSAIN ORD/000704/2023-2024 269/BSD 15/03/2024 Hiring of 01 (One) no. vehicle for the Office of the Assistant Engineer, Bolpur Sub-Division, P.H.E Dte. under Birbhum Division, P.H.E Dte. For the period of 01.04.2024 to 30.09.2024. 0.40 BP-2024-25-142 22/07/2024 VCH/000266/2024-2025
106 Birbhum Division BILL/00189/2024-2025 28/05/2024 ENVIROTECH SOLUTIONS ORD/000804/2022-2023 291/RSD 02/09/2022 Continuation Work Order for Preparation & Submission of DPR for (DAKSHIN GRAM) Water Supply Scheme (Part-A) under Mayureswar-I Development Block. 2.61 BP-2024-25-84 04/06/2024 VCH/000146/2024-2025
107 Birbhum Division BILL/00203/2024-2025 28/05/2024 ENVIROTECH SOLUTIONS ORD/000834/2022-2023 287/RSD 31/08/2022 Continuation Work Order for Preparation & Submission of DPR for (CHHAMNA) Water Supply Scheme (Part-A) under Mayureswar-II Development Block. 2.70 BP-2024-25-84 04/06/2024 VCH/000152/2024-2025
108 Birbhum Division BILL/00126/2024-2025 16/05/2024 TEKNO ENTERPRISE ORD/000241/2022-2023 2769/BHM 14/12/2022 Construction of 750cum capacity 20mtr. Staging height RCC Over Head Reservoir over RCC pile foundation including pipe connection & allied works for augmentation of Kirnahar Zone-I W/S Scheme under Birbhum Division, PHE Dte.(As per Departmental Drawing)¿ 45.54 BP-2024-25-78 03/06/2024 VCH/000122/2024-2025
109 Birbhum Division BILL/00245/2024-2025 07/06/2024 QUALITY COUNCIL OF INDIA null AC/5105/23-24 26/10/2023 Surveillance conducted on 9 Sep'23 to 10 Sep'23 honorarium of Rajni kant sharma DR Papia Das 0.39 BP-2024-25-112 28/06/2024 VCH/000224/2024-2025
110 Birbhum Division BILL/00248/2024-2025 10/06/2024 KHAYRASOLE PALLY MANGAL SAMITY ORD/000691/2023-2024 138/BSSD 28/03/2024 Extension/Continuation work order for Engagement of Lab Personnel for the period from 01.04.2024 to 30.09.2024. 0.43 BP-2024-25-92 11/06/2024 VCH/000161/2024-2025
111 Birbhum Division BILL/00266/2024-2025 13/06/2024 APEX ENGINEERING ORD/000662/2022-2023 214/BSD 31/05/2022 Continuation work Order for "Preparation & Submission of Detail Project Report (DPR) for GOPINATHPUR Piped Water Supply Scheme under Labpur Development Block within Bolpur Sub-Division under Birbhum Division, PHE Dte." 3.70 BP-2024-25-97 14/06/2024 VCH/000175/2024-2025
112 Birbhum Division BILL/00347/2024-2025 28/06/2024 M/S PROCHESTA ENTERPRISE ORD/000036/2023-2024 1108/BHM 10/04/2023 Different works related to water supply scheme at DHITORA & its adjoining mouzas water supply scheme within MURARAI-I Block including supply of all labour & materials under BIRBHUM Division, PHE Dte. 28.80 BP-2024-25-120 08/07/2024 VCH/000235/2024-2025
Total 3,314.25