Sl. No. | Division
Working Divisions
|
Bill Number | Bill Date
Date of Issuance of the Work Order as per PHED-MIS
|
Vendor Name
Vendor Appointed Against this Work Order as per PHED-MIS
|
System Order Number
System generated Order No. for the Work Order as per PHED-MIS
|
Memo Number
Memo no. for Work Order Provided by the Divisions as per PHED-MIS
|
Order Date
Date of Issuance of the Work Order as per PHED-MIS
|
work_name
Name of the Work as per the Issued Work Order
|
Bill Gross Amount | Voucher Number | Voucher Date | System Voucher Number |
---|---|---|---|---|---|---|---|---|---|---|---|---|
0 | 8,121.77 | |||||||||||
1 | Birbhum Division | BILL/00139/2024-2025 | 16/05/2024 | RAMESH AND SHANTI ENGINEERING WORKS | ORD/000469/2023-2024 | 503/BHM | 02/02/2024 | Continuation Work Order for Supply and delivery of Sluice Valve for Augmentation of Kirnahar Zone-II W/S Scheme under Birbhum Division, P.H.E. Dte. including loading, carriage and unloading at Birbhum Divisional Store at PHE Complex, Dist.-Birbhum unde | 8.19 | BP-2024-25-81 | 03/06/2024 | VCH/000124/2024-2025 |
2 | Birbhum Division | BILL/00209/2024-2025 | 28/05/2024 | ENVIROTECH SOLUTIONS | ORD/000841/2022-2023 | 435/RSD | 21/11/2022 | Continuation Work Order for Preparation & Submission of DPR for (MAHESHA) Water Supply Scheme (Part-B) under Mayureswar-II Development Block. | 3.53 | BP-2024-25-84 | 04/06/2024 | VCH/000138/2024-2025 |
3 | Birbhum Division | BILL/00213/2024-2025 | 28/05/2024 | ENVIROTECH SOLUTIONS | ORD/000845/2022-2023 | 438/RSD | 29/11/2022 | Continuation Work Order for Preparation & Submission of DPR for (SULTANPUR) Water Supply Scheme (Part-B) under Mayureswar-II Development Block | 3.50 | BP-2024-25-84 | 04/06/2024 | VCH/000135/2024-2025 |
4 | Birbhum Division | BILL/00228/2024-2025 | 31/05/2024 | SUNIL RABI DAS | ORD/000239/2022-2023 | 2203/BHM | 12/10/2022 | Construction of 1000 Cum capacity 20mtr. Staging height RCC Over Head Reservoir over RCC pile foundation including pipe connection & allied works for Augmentation of Lohapur Water Supply Scheme under Birbhum Division, PHE Dte. (As per Departmental Drawin | 40.16 | BP-2024-25-83 | 03/06/2024 | VCH/000120/2024-2025 |
5 | Birbhum Division | BILL/00283/2024-2025 | 14/06/2024 | M/S GOUTAM DAS | ORD/000692/2021-2022 | 1467/BHM | 03/09/2021 | Community based Water purification system with FLUORIDE TREATMENT UNIT for Fluoride Affected Habitations at Village Rajnagar, under Rajnagar Block within Birbhum Division, P.H.E. Dte. (Sl. No.2) | 4.33 | BP-2024-25-104 | 18/06/2024 | VCH/000186/2024-2025 |
6 | Birbhum Division | BILL/00392/2024-2025 | 16/07/2024 | BIRBHUM INFRAPARK PRIVATE LIMITED | ORD/000333/2022-2023 | 2624/BHM | 28/11/2022 | Implementation of MINI PIPED WATER SUPPLY SCHEME through Waterjet & DTH Boring in 334 (Three Hundred and Thirty Four) no. villages under different blocks having less than 100 households under Birbhum Division PHE Dte. | 1,358.76 | BP-2024-25-179 | 08/08/2024 | VCH/000338/2024-2025 |
7 | Birbhum Division | BILL/00393/2024-2025 | 16/07/2024 | JAMSED ALI KHAN | ORD/000431/2023-2024 | 4180/BHM | 31/10/2023 | Continution work for Supply of one no. Diesel driven Motor Cab / Maxi Cab (Air Condition) on hire Basis under the Assitant Engineer (H.Q) Birbhum Division P.H.E Dte. (Period from 01.11.2023 to 30.04.2024) | 0.39 | BP-2024-25-141 | 22/07/2024 | VCH/000263/2024-2025 |
8 | Birbhum Division | BILL/00395/2024-2025 | 16/07/2024 | LUMINO SMC JV | ORD/000392/2023-2024 | 4123/BHM | 17/10/2023 | Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & Different works including Laying of Distribution System, providing FHTCs and construction of switch rooms & Boundary wallswith gates in co | 73.68 | BP-2024-25-140 | 22/07/2024 | VCH/000268/2024-2025 |
9 | Birbhum Division | BILL/00520/2024-2025 | 21/08/2024 | G.S CONSTRUCTION AND CO. | ORD/000291/2022-2023 | 2443/BHM | 03/11/2022 | Providing necessary water supply arrangement at 24 (Twenty Four) Nos. Primary School having Electric Power Connection within the command area of Bolpur Sriniketan, Dubrajpur, Nalhati-I & Suri-II Development Block under Birbhum Division, P.H.E.Dte. (Sl. N | 17.22 | BP-2024-25-202 | 29/08/2024 | VCH/000416/2024-2025 |
10 | Birbhum Division | BILL/00529/2024-2025 | 23/08/2024 | SUNIL RABI DAS | ORD/000268/2023-2024 | 3522/BHM | 11/08/2023 | Different works related to water supply scheme at NABAGRAM, SAHAPUR & SHASPUR and its adjoining mouzas water supply scheme within RAMPURHAT-II Block including supply of all labour & materials under BIRBHUM Division, PHE Dte. | 206.42 | BP-2024-25-197 | 27/08/2024 | VCH/000392/2024-2025 |
11 | Birbhum Division | BILL/00849/2023-2024 | 09/02/2024 | HIRANMAY GHOSH | ORD/000338/2023-2024 | 3895/BHM | 21/09/2023 | Allied work for Providing Functional Household Tap Connection (FHTC) from exixting distribution system within the command area of Rasa W/S Scheme in Birbhum Sadar Sub-Division under Birbhum Division, PHE Dte. | 36.10 | BP-2024-25-160 | 30/07/2024 | VCH/001152/2023-2024 |
12 | Birbhum Division | BILL/00193/2024-2025 | 28/05/2024 | ENVIROTECH SOLUTIONS | ORD/000803/2022-2023 | 360/RSD | 20/09/2022 | Continuation Work Order for Preparation & Submission of DPR for (BIRCHANDRAPUR) Water Supply Scheme (Part-B) under Mayureswar-I Development Block. | 3.30 | BP-2024-25-84 | 04/06/2024 | VCH/000142/2024-2025 |
13 | Birbhum Division | BILL/00251/2024-2025 | 10/06/2024 | ZEBA CONSTRUCTION | ORD/000004/2023-2024 | 1083/BHM | 06/04/2023 | Different works related to water supply scheme at DABUK & its adjoining mouzas water supply scheme within MAYURESWAR-I Block including supply of all labour & materials under BIRBHUM Division, PHE Dte. | 66.65 | BP-2024-25-94 | 11/06/2024 | VCH/000163/2024-2025 |
14 | Birbhum Division | BILL/00269/2024-2025 | 13/06/2024 | APEX ENGINEERING | ORD/000660/2022-2023 | 193/BSD | 17/05/2022 | Continuation work order for "Preparation & Submission of Detail Project Report (DPR) for SHEKHAMPUR Piped Water Supply Scheme under Labpur Development Block within Bolpur Sub-Division under Birbhum Division, PHE Dte." | 3.80 | BP-2024-25-97 | 14/06/2024 | VCH/000178/2024-2025 |
15 | Birbhum Division | BILL/00271/2024-2025 | 13/06/2024 | APEX ENGINEERING | ORD/000955/2022-2023 | 305/BSD | 12/08/2022 | Continuation work for "Preparation & Submission of Detail Project Report (DPR) for PUNNA Piped Water Supply Scheme within the command area of Labpur Development Block within Bolpur Sub-Division under Birbhum Division, PHE Dte.". | 1.14 | BP-2024-25-97 | 14/06/2024 | VCH/000176/2024-2025 |
16 | Birbhum Division | BILL/00272/2024-2025 | 13/06/2024 | APEX ENGINEERING | ORD/000654/2022-2023 | 146/BSD | 12/04/2022 | Continuation work order for "Preparation & Submission of Detail Project Report (DPR) for FARIDPUR Piped Water Supply Scheme under Labpur Development Block within Bolpur Sub-Division under Birbhum Division, PHE Dte." | 3.69 | BP-2024-25-97 | 14/06/2024 | VCH/000180/2024-2025 |
17 | Birbhum Division | BILL/00278/2024-2025 | 13/06/2024 | APEX ENGINEERING | ORD/000658/2022-2023 | 179/BSD | 05/05/2022 | Continuation work order for "Preparation & Submission of Detail Project Report (DPR) for PANCHPARA Piped Water Supply Scheme under Labpur Development Block within Bolpur Sub-Division under Birbhum Division, PHE Dte." | 3.19 | BP-2024-25-97 | 14/06/2024 | VCH/000168/2024-2025 |
18 | Birbhum Division | BILL/00282/2024-2025 | 14/06/2024 | B RAI CONSTRUCTION COMPANY | ORD/000189/2023-2024 | 2262/BHM | 12/07/2023 | Different works related to water supply scheme at PASCHIM NAOPARA, PHULUR & PURBA SIUR its adjoining mouzas water supply scheme within SAINTHIA Block under Birbhum Division, PHE Dte. | 149.34 | BP-2024-25-105 | 18/06/2024 | VCH/000187/2024-2025 |
19 | Birbhum Division | BILL/00353/2024-2025 | 28/06/2024 | SUNIL RABI DAS | ORD/000191/2023-2024 | 3019/BHM | 14/07/2023 | Different works related to water supply scheme at Jijigram, Math Basori & Bilaspur and its adjoining mouzas water supply scheme within MURARAI-II Block including supply of all labour & materials under BIRBHUM Division, PHE Dte. | 245.93 | BP-2024-25-124 | 08/07/2024 | VCH/000239/2024-2025 |
20 | Birbhum Division | BILL/00358/2024-2025 | 08/07/2024 | BRAHMA CONSTRUCTION COMPANY | ORD/000056/2023-2024 | 1245/BHM | 17/04/2023 | Different works related to water supply scheme at DERPUR, KURUMSAHA & MATIARA and its adjoining mouzas water supply scheme within SAINTHIA Block including supply of all labour & materials under Birbhum Division, PHE Dte. | 125.12 | BP-2024-25-128 | 10/07/2024 | VCH/000243/2024-2025 |
21 | Birbhum Division | BILL/00482/2024-2025 | 05/08/2024 | HIRANMAY GHOSH | ORD/001198/2021-2022 | 383/BSSD | 10/12/2021 | Providing Functional School/Institution/AWC Tap Connection from existing Piped Water Supply Scheme distribution system in situated at different location of Khayrasole Block under Birbhum Sadar Sub Division within Birbhum Division, P.H.E Dte. | 0.89 | BP-2024-25-169 | 08/08/2024 | VCH/000344/2024-2025 |
22 | Birbhum Division | BILL/00483/2024-2025 | 06/08/2024 | MAHAVIR PUMPS MFG PVT LTD | ORD/000038/2023-2024 | 1181/BHM | 12/04/2023 | Different works related to water supply scheme at BANSHANKA & HATIKARA its adjoining mouzas water supply scheme within SURI - II Block including supply of all labour & materials under BIRBHUM Division, PHE Dte. | 69.73 | BP-2024-25-173 | 08/08/2024 | VCH/000348/2024-2025 |
23 | Birbhum Division | BILL/00485/2024-2025 | 06/08/2024 | SADANANDA CHATTARAJ | ORD/000026/2023-2024 | 1093/BHM | 06/04/2023 | Different works related to water supply scheme at CHANDRAPUR & its adjoining mouzas Water Supply Scheme within RAJNAGAR Block including supply of all labour & materials under Birbhum Division, PHE Dte. | 58.35 | BP-2024-25-177 | 08/08/2024 | VCH/000352/2024-2025 |
24 | Birbhum Division | BILL/00487/2024-2025 | 06/08/2024 | SOUMITA PAL | ORD/000459/2023-2024 | 27/RSD | 22/01/2024 | Hiring of Ambassador Car (Diesel) registered Luxury Taxi for the office of the Assistant Engineer, Rampurhat Sub-Division P.H.E. Dte. for 24 hours service including Driver and also including the cost of fuel & lubricants as per terms & condition with effe | 0.40 | BP-2024-25-167 | 08/08/2024 | VCH/000341/2024-2025 |
25 | Birbhum Division | BILL/00489/2024-2025 | 06/08/2024 | M/S ELLIUS KHAN | ORD/000074/2023-2024 | 1344/BHM | 20/04/2023 | Different related to water supply scheme at KHANPUR, Harinduba & Abdullahapur and its adjoining mouzas water supply scheme within MURARAI-I Block including supply of all labour & materials under BIRBHUM Division, PHE Dte | 139.59 | BP-2024-25-183 | 20/08/2024 | VCH/000443/2024-2025 |
26 | Birbhum Division | BILL/00498/2024-2025 | 09/08/2024 | KOUSIK DAS | ORD/000472/2023-2024 | 524/BHM | 05/02/2024 | Sinking of Tubewell, Construction of OHR, Construction of Boundary wall, pump house and laying distribution system along with FHTC works at Augmentation of Dubrajpur (Rural) & its adjoining mouzas water supply scheme within Dubrajpur under Birbhum Divisio | 54.40 | BP-2024-25-180 | 13/08/2024 | VCH/000358/2024-2025 |
27 | Birbhum Division | BILL/00509/2024-2025 | 13/08/2024 | JOY CHAND MAL | ORD/000699/2023-2024 | 57/NSD | 14/03/2024 | Hiring of SWIFT DZIRE (diesel) registered luxury car for the office of the Assistant Engineer, Nalhati Sub-Division P.H.E. Dte. for 24 hours service including Driver and the cost of fuel & lubricants as per terms & condition with effect from 01.04.2024 to | 0.39 | BP-2024-25-194 | 22/08/2024 | VCH/000371/2024-2025 |
28 | Birbhum Division | BILL/00550/2024-2025 | 30/08/2024 | M/S SAHA AND MONDAL CONSTRUCTION | ORD/000389/2023-2024 | 4145/BHM | 19/10/2023 | Different works related to water supply scheme at GULALGACHI & its adjoining mouzas Water Supply Scheme within RAJNAGAR Block including supply of all labour & materials under Birbhum Division, PHE Dte | 123.18 | BP-2024-25-209 | 02/09/2024 | VCH/000494/2024-2025 |
29 | Birbhum Division | BILL/00574/2024-2025 | 04/09/2024 | S R ENTERPRISE | ORD/000576/2023-2024 | 729/BHM | 28/02/2024 | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Zone-IV under Bandirban Water Supply Water Supply Scheme within Birbhum Division, PHE Dte | 75.56 | BP-2024-25-213 | 06/09/2024 | VCH/000498/2024-2025 |
30 | Birbhum Division | BILL/00208/2024-2025 | 28/05/2024 | ENVIROTECH SOLUTIONS | ORD/000840/2022-2023 | 324/RSD | 08/09/2022 | Continuation Work Order for Preparation & Submission of DPR for (MAHESHA) Water Supply Scheme (Part-A) under Mayureswar-II Development Block. | 2.55 | BP-2024-25-84 | 04/06/2024 | VCH/000137/2024-2025 |
31 | Birbhum Division | BILL/00211/2024-2025 | 28/05/2024 | ENVIROTECH SOLUTIONS | ORD/000843/2022-2023 | 437/RSD | 25/11/2022 | Continuation Work Order for Preparation & Submission of DPR for (PRAYAGPUR) Water Supply Scheme (Part-B) under Mayureswar-II Development Block. | 2.40 | BP-2024-25-84 | 04/06/2024 | VCH/000141/2024-2025 |
32 | Birbhum Division | BILL/00219/2024-2025 | 30/05/2024 | M/S SAHA AND MONDAL CONSTRUCTION | ORD/000389/2023-2024 | 4145/BHM | 19/10/2023 | Different works related to water supply scheme at GULALGACHI & its adjoining mouzas Water Supply Scheme within RAJNAGAR Block including supply of all labour & materials under Birbhum Division, PHE Dte | 101.53 | BP-2024-25-79 | 03/06/2024 | VCH/000129/2024-2025 |
33 | Birbhum Division | BILL/00225/2024-2025 | 30/05/2024 | M/S SARADA CONSTRUCTION. | ORD/000462/2023-2024 | 13/RWS | 25/01/2024 | Supply & Installtion of 1 No existing AC machine & other work related to NABL Requirement at Birbhum District Water Testing Laboratory at Suri under Birbhum Division PHE Dte. | 0.70 | BP-2024-25-76 | 03/06/2024 | VCH/000126/2024-2025 |
34 | Birbhum Division | BILL/00227/2024-2025 | 30/05/2024 | RADIANT | ORD/000859/2022-2023 | 93/BSSD | 27/05/2022 | Preparation & Submission of DPR for Pump House cum Chlorine Room, Boundary Wall, Soil Investigation Report, Construction Over Head Reservoir (OHR), Construction of Pipe carrying structure, Service Road at Head Work Site & Land Development, FHTC Connectio | 2.22 | BP-2024-25-82 | 03/06/2024 | VCH/000128/2024-2025 |
35 | Birbhum Division | BILL/00285/2024-2025 | 14/06/2024 | M/S R B ENTERPRISE | ORD/000011/2023-2024 | 1096/BHM | 06/04/2023 | Different works related to water supply scheme at HATKALUA PIPED WATER SUPPLY SCHEME (TSM/016242) within LABPUR Block including supply of all labour & materials under Bolpur Sub-Division within Birbhum Division, PHE Dte. | 17.22 | BP-2024-25-116 | 08/07/2024 | VCH/000231/2024-2025 |
36 | Birbhum Division | BILL/00286/2024-2025 | 14/06/2024 | MANASH GHOSH | ORD/000661/2021-2022 | 1556/BHM | 16/09/2021 | Community based Water Supply arrangement for Fluoride Affected Habitations with SOLAR Power Connection at Village Baidhara (2 Nos. Tubewell) under Block¿Rampurhar¿I, Barmillaka (1 No. Tube well) Block ¿Rampurhar¿II & Sharpur Block-Nalhati-I within Birbhum | 15.94 | BP-2024-25-103 | 18/06/2024 | VCH/000185/2024-2025 |
37 | Birbhum Division | BILL/00288/2024-2025 | 18/06/2024 | MANASH GHOSH | ORD/000207/2023-2024 | 3257/BHM | 26/07/2023 | Different works related to water supply scheme at NAWAPARA & PRASADPUR and its adjoining mouzas water supply scheme within NALHATI-II Block including supply of all labour & materials under Birbhum Division, PHE Dte. | 33.82 | BP-2024-25-106 | 19/06/2024 | VCH/000190/2024-2025 |
38 | Birbhum Division | BILL/00373/2024-2025 | 15/07/2024 | SOUMITA PAL | ORD/000228/2023-2024 | 199/RSD | 28/07/2023 | Hiring of Ambassador Car (Diesel) registered Luxury Taxi for the office of the Assistant Engineer, Rampurhat Sub-Division P.H.E. Dte. for 24 hours service including Driver and also including the cost of fuel & lubricants as per terms & condition with effe | 0.36 | BP-2024-25-137 | 22/07/2024 | VCH/000256/2024-2025 |
39 | Birbhum Division | BILL/00527/2024-2025 | 23/08/2024 | KAZI EMDADUL HAQUE | ORD/000068/2023-2024 | 1341/BHM | 20/04/2023 | Different works related to water supply scheme at PARKUTA & its adjoining mouzas water supply scheme within RAMPURHAT-II Block including supply of all labour & materials under BIRBHUM Division, PHE Dte. | 54.20 | BP-2024-25-198 | 27/08/2024 | VCH/000393/2024-2025 |
40 | Birbhum Division | BILL/00538/2024-2025 | 27/08/2024 | BIPIN KUMAR SINGH | ORD/000076/2023-2024 | 1425/BHM | 25/04/2023 | Different works related to water supply scheme at PARULIA, KHANPUR & PADUMA and its adjoining mouzas water supply scheme within DUBRAJPUR Block including supply of all labour & materials under BIRBHUM Division, PHE Dte. | 252.80 | BP-2024-25-200 | 28/08/2024 | VCH/000395/2024-2025 |
41 | Birbhum Division | BILL/00198/2024-2025 | 28/05/2024 | ENVIROTECH SOLUTIONS | ORD/000807/2022-2023 | 403/RSD | 13/10/2022 | Continuation Work Order for Preparation & Submission of DPR for (Lachhiator) Water Supply Scheme (Part-B) under Mayureswar-I Development Block. | 3.46 | BP-2024-25-84 | 04/06/2024 | VCH/000148/2024-2025 |
42 | Birbhum Division | BILL/00201/2024-2025 | 28/05/2024 | ENVIROTECH SOLUTIONS | ORD/000831/2022-2023 | 443/RSD | 02/12/2022 | Continuation Work Order for Preparation & Submission of DPR for (Bara Turigram) Water Supply Scheme (Part-C) under Mayureswar-I Development Block. | 1.21 | BP-2024-25-84 | 04/06/2024 | VCH/000145/2024-2025 |
43 | Birbhum Division | BILL/00249/2024-2025 | 10/06/2024 | M/S TAPAS KUMAR CHAKRABORTY | ORD/000402/2023-2024 | 4139/BHM | 18/10/2023 | Different works related to water supply scheme at IKSHUDHARA, KANKALITALA, KASBA & KENDANGAL Piped Water Supply Scheme within BOLPUR-SRINIKETAN Block including supply of all labour & materials under BIRBHUM Division, PHE Dte. | 234.08 | BP-2024-25-95 | 11/06/2024 | VCH/000164/2024-2025 |
44 | Birbhum Division | BILL/00255/2024-2025 | 10/06/2024 | AKASH CONSTRUCTION | ORD/000080/2023-2024 | 1423/BHM | 25/04/2023 | Different works related to water supply scheme at Dalima, Kahinagar & Dumurgram and its adjoining mouzas water supply scheme within MURARAI-I Block including supply of all labour & materials under BIRBHUM Division, PHE Dte. | 163.02 | BP-2024-25-96 | 11/06/2024 | VCH/000165/2024-2025 |
45 | Birbhum Division | BILL/00259/2024-2025 | 11/06/2024 | NEEL ENTERPRISE | ORD/001195/2021-2022 | 354/BSSD | 27/10/2021 | Proposed renovation for NABL recognition of Patelnagar Sub District Laboratory under Birbhum Division P.H.E. Dte. Dist: Birbhum. (Sl. No. - 02) | 0.95 | BP-2024-25-101 | 14/06/2024 | VCH/000167/2024-2025 |
46 | Birbhum Division | BILL/00346/2024-2025 | 28/06/2024 | M/S.SUMAN CONSTRUCTION | ORD/000161/2023-2024 | 2065/BHM | 08/06/2023 | Different works related to Water Supply Scheme at SULTANPUR & its adjoining mouzas Water Supply Scheme within MAYURESWAR-II Block including supply of all labour & materials under BIRBHUM Division, PHE Dte. | 78.15 | BP-2024-25-119 | 08/07/2024 | VCH/000234/2024-2025 |
47 | Birbhum Division | BILL/00351/2024-2025 | 28/06/2024 | CHAYAN KUMAR MONDAL | ORD/000589/2023-2024 | 753/BHM | 29/02/2024 | Laying of 140 mm HDPE (PE 100, PN-6) pipeline with shifting of existing pipeline for crossing of irrigation canal due to construction of 02 (Two) nos. new bridge of Bahiri under Bolpur Sub-Division, PHE Dte. within Birbhum Division, PHE Dte. (2nd Call) | 2.31 | BP-2024-25-123 | 08/07/2024 | VCH/000238/2024-2025 |
48 | Birbhum Division | BILL/00408/2024-2025 | 19/07/2024 | M/S GOUTAM DAS | ORD/000116/2023-2024 | 2077/BHM | 08/06/2023 | Laying of Balance Distribution Main pipeline through road crossing differesnt location of NH 14 by adopting Jack Pushing method and all other allied works at Zone-IV under the Piped Water Supply Scheme for Bandirban(Kanmara) Suri-I and Rajnagar Block un | 63.87 | BP-2024-25-148 | 26/07/2024 | VCH/000269/2024-2025 |
49 | Birbhum Division | BILL/00411/2024-2025 | 19/07/2024 | NOBI SEIKH | ORD/000382/2022-2023 | 2842/BHM | 21/12/2022 | Construction of Switch room at Pump House Site with sanitary and water supply arrangement to departmental drawing (Size 3.60 mtr x 3.30 mtr room with 1.2 Mtr. wide verandah),Boundary Wall,PCC approach Road,Land Development (PH No-2) for Augmentation of | 13.29 | BP-2024-25-157 | 29/07/2024 | VCH/000272/2024-2025 |
50 | Birbhum Division | BILL/00416/2024-2025 | 23/07/2024 | KHAYRASOLE PALLY MANGAL SAMITY | ORD/000691/2023-2024 | 138/BSSD | 28/03/2024 | Extension/Continuation work order for Engagement of Lab Personnel for the period from 01.04.2024 to 30.09.2024. | 0.43 | BP-2024-25-153 | 26/07/2024 | VCH/000276/2024-2025 |
51 | Birbhum Division | BILL/00426/2024-2025 | 01/08/2024 | WEIR AND DECK CONSTRUCTION ENGINEERS CO OP SOCIETY LTD | ORD/000263/2023-2024 | 1103/BHM | 10/04/2023 | Construction of 700cum capacity 20mtr. Staging height RCC Over Head Reservoir over RCC Raft foundation including pipe connection & allied works for augmentation of Ahmedpur W/S Scheme under Birbhum Sadar Sub Division within Birbhum Division, PHE Dte. | 30.40 | BP-2024-25-170 | 08/08/2024 | VCH/000345/2024-2025 |
52 | Birbhum Division | BILL/00486/2024-2025 | 06/08/2024 | ANIRUDDHA FARUQUE | ORD/000604/2023-2024 | 863/BHM | 12/03/2024 | Sinking of 250mm x 150mm dia Tube Well, 150 mtr deep by D.R. Rig method using UPVC Pipe (CD) and UPVC Deep Well Screen (RDS) at Tilutia (Zone-II) Water Supply Scheme within Bolpur Sub-Division under Birbhum Division, PHE Dte. (2nd Call) | 9.38 | BP-2024-25-166 | 08/08/2024 | VCH/000340/2024-2025 |
53 | Birbhum Division | BILL/00503/2024-2025 | 13/08/2024 | SUBHANKAR ROY | ORD/000521/2023-2024 | 672/BHM | 20/02/2024 | Additional Laying for connecting pipeline & Distribution system with FHTC works at Beja Piped Water Supply Scheme under Birbhum Division, PHE Dte. | 11.56 | BP-2024-25-192 | 22/08/2024 | VCH/000368/2024-2025 |
54 | Birbhum Division | BILL/00220/2024-2025 | 30/05/2024 | PREMANANDA ROY BISWAS | ORD/000432/2023-2024 | 4181/BHM | 31/10/2023 | Continution work for Supply of one no. Diesel Motor Cab/Maxi Cub (Air Condition) on hire basis under the Executive Engineer Birbhum Division P.H.E Dte (Period From 01.11.2023 to 30.04.2024) | 1.58 | BP-2024-25-86 | 04/06/2024 | VCH/000130/2024-2025 |
55 | Birbhum Division | BILL/00221/2024-2025 | 30/05/2024 | PREMANANDA ROY BISWAS | ORD/000432/2023-2024 | 4181/BHM | 31/10/2023 | Continution work for Supply of one no. Diesel Motor Cab/Maxi Cub (Air Condition) on hire basis under the Executive Engineer Birbhum Division P.H.E Dte (Period From 01.11.2023 to 30.04.2024) | 0.78 | BP-2024-25-86 | 04/06/2024 | VCH/000131/2024-2025 |
56 | Birbhum Division | BILL/00226/2024-2025 | 30/05/2024 | M/S SARADA CONSTRUCTION. | ORD/000587/2023-2024 | 15/RWS | 02/02/2024 | Continuation Work Order for Supply & installation of 1 No. existing AC machine & other work related to NABL Requirement at Birbhum District Water Testing Laboratory at Suri under Birbhum Division PHE Dte. | 0.70 | BP-2024-25-76 | 03/06/2024 | VCH/000127/2024-2025 |
57 | Birbhum Division | BILL/00367/2024-2025 | 10/07/2024 | B RAI CONSTRUCTION COMPANY | ORD/000385/2023-2024 | 4142/BHM | 19/10/2023 | Different works related to water supply scheme at LACHHIATOR, DAKSHINGRAM, SONJ & SHIBGRAM and its adjoining mouzas water supply scheme within MAYURESWAR-I Block including supply of all labour & materials under Birbhum Division, PHE Dte. | 224.10 | BP-2024-25-130 | 15/07/2024 | VCH/000245/2024-2025 |
58 | Birbhum Division | BILL/00368/2024-2025 | 10/07/2024 | PRASANTA KUMAR MUKHERJEE | ORD/000359/2023-2024 | 3953/BHM | 03/10/2023 | Sinking replacement of 200mm dia Tube Well of UPVC pipe 90m deep with fibre glass strainer including connecting main for Haridaspur PWSS under Nalhati Sub- Division within Birbhum Division PHED | 13.73 | BP-2024-25-132 | 15/07/2024 | VCH/000247/2024-2025 |
59 | Birbhum Division | BILL/00369/2024-2025 | 10/07/2024 | M H CONSTRUCTION | ORD/000353/2023-2024 | 3959/BHM | 03/10/2023 | Construction of 2 no Pump House of 5.40 mtr X 3.6 mtr. Size with sanitary and water supply arrangements at Dantura PWSS, under Nalhati Sub-Division within Birbhum division, P.H.E. Dte. | 9.53 | BP-2024-25-131 | 15/07/2024 | VCH/000246/2024-2025 |
60 | Birbhum Division | BILL/00378/2024-2025 | 15/07/2024 | SOUMITA PAL | ORD/000459/2023-2024 | 27/RSD | 22/01/2024 | Hiring of Ambassador Car (Diesel) registered Luxury Taxi for the office of the Assistant Engineer, Rampurhat Sub-Division P.H.E. Dte. for 24 hours service including Driver and also including the cost of fuel & lubricants as per terms & condition with effe | 0.39 | BP-2024-25-138 | 22/07/2024 | VCH/000261/2024-2025 |
61 | Birbhum Division | BILL/00391/2024-2025 | 16/07/2024 | WEIR AND DECK CONSTRUCTION ENGINEERS CO OP SOCIETY LTD | ORD/000945/2021-2022 | 1555/BHM | 16/09/2021 | Community based Water Supply arrangement for Fluoride Affected Habitations with SOLAR Power Connection at Village Beguna Muslimpara (1 No. Tubewell) under Block-Mayureswar-I, Bahadurganja (1 No. Tubewell) Block-Md Bazar & Mandala (1 No. Tubewell) Block-Ra | 12.98 | BP-2024-25-145 | 22/07/2024 | VCH/000254/2024-2025 |
62 | Birbhum Division | BILL/00521/2024-2025 | 21/08/2024 | GHOSH ENTERPRISE | ORD/000078/2023-2024 | 1427/BHM | 25/04/2023 | Different works related to water supply scheme at MONAI & its adjoining mouzas water supply scheme within SAINTHIA Block including supply of all labour & materials under BIRBHUM Division, PHE Dte. | 48.95 | BP-2024-25-191 | 22/08/2024 | VCH/000370/2024-2025 |
63 | Birbhum Division | BILL/00528/2024-2025 | 23/08/2024 | RADHARANI ENTERPRISE | ORD/000071/2023-2024 | 1345/BHM | 20/04/2023 | Different works related to water supply scheme at SHRICHANDRAPUR Piped Water Supply Scheme within Illambazar Block including supply of all labour & materials under BIRBHUM Division, PHE Dte. | 41.63 | BP-2024-25-196 | 27/08/2024 | VCH/000391/2024-2025 |
64 | Birbhum Division | BILL/00199/2024-2025 | 28/05/2024 | ENVIROTECH SOLUTIONS | ORD/000830/2022-2023 | 422/RSD | 03/11/2022 | Continuation Work Order for Preparation & Submission of DPR for (Bara Turigram) Water Supply Scheme (Part-B) under Mayureswar-I Development Block. | 3.23 | BP-2024-25-84 | 04/06/2024 | VCH/000143/2024-2025 |
65 | Birbhum Division | BILL/00270/2024-2025 | 13/06/2024 | APEX ENGINEERING | ORD/000950/2022-2023 | 266/BSD | 11/07/2022 | Continuation work for "Preparation & Submission of Detail Project Report (DPR) for PUNNA Piped Water Supply Scheme within the command area of Labpur Development Block within Bolpur Sub-Division under Birbhum Division, PHE Dte.¿. | 4.11 | BP-2024-25-97 | 14/06/2024 | VCH/000177/2024-2025 |
66 | Birbhum Division | BILL/00349/2024-2025 | 28/06/2024 | JOY CHAND MAL | ORD/000699/2023-2024 | 57/NSD | 14/03/2024 | Hiring of SWIFT DZIRE (diesel) registered luxury car for the office of the Assistant Engineer, Nalhati Sub-Division P.H.E. Dte. for 24 hours service including Driver and the cost of fuel & lubricants as per terms & condition with effect from 01.04.2024 to | 0.39 | BP-2024-25-114 | 08/07/2024 | VCH/000229/2024-2025 |
67 | Birbhum Division | BILL/00406/2024-2025 | 19/07/2024 | ABUL KALAM | ORD/000527/2022-2023 | 884/BHM | 21/03/2023 | Different works related to water supply scheme at Bahadurpur & its adjoining mouzas water supply scheme within Murarai-I Block including supply of all labour & materials under Birbhum Division, PHE Dte. Sl No 01 | 64.35 | BP-2024-25-156 | 26/07/2024 | VCH/000273/2024-2025 |
68 | Birbhum Division | BILL/00501/2024-2025 | 12/08/2024 | ADIL CONSTRUCTION | ORD/000089/2024-2025 | 96/RWS | 27/06/2024 | Supply of one no. diesel driven car(Diesel) on hire basis office uses for the officials of the Assistant Engineer, RWS, Birbhum Sub-Division, PHE Dte.(Period from 28.06.2024 to 26.12.2024) | 0.40 | BP-2024-25-186 | 22/08/2024 | VCH/000374/2024-2025 |
69 | Birbhum Division | BILL/00554/2024-2025 | 30/08/2024 | M/S R B ENTERPRISE | ORD/000361/2023-2024 | 3974/BHM | 04/10/2023 | Different works related to water supply scheme at HARIDASPUR & its adjoining mouzas water supply scheme within MD BAZAR Block including supply of all labour & materials under BIRBHUM Division, PHE Dte | 65.34 | BP-2024-25-206 | 02/09/2024 | VCH/000491/2024-2025 |
70 | Birbhum Division | BILL/00210/2024-2025 | 28/05/2024 | ENVIROTECH SOLUTIONS | ORD/000842/2022-2023 | 333/RSD | 08/09/2022 | Continuation Work Order for Preparation & Submission of DPR for (PRAYAGPUR) Water Supply Scheme (Part-A) under Mayureswar-II Development Block. | 2.28 | BP-2024-25-84 | 04/06/2024 | VCH/000140/2024-2025 |
71 | Birbhum Division | BILL/00231/2024-2025 | 31/05/2024 | DISTRICT HEALTH & FAMILY WELFARE SAMITI RAMPURHAT HEALTH DISTRICT | null | DHFWS/RPH/1164 | 06/05/2024 | Collection & testing of drinking water sample and details information like geographical location GP name /Mouja/habitation location of source with reference household & institution viz schools. angawaris etc. through FTKs & uploading charges related to wa | 20.16 | BP-2024-25-110 | 20/06/2024 | VCH/000206/2024-2025 |
72 | Birbhum Division | BILL/00284/2024-2025 | 14/06/2024 | GB CONSTRUCTION | ORD/000580/2023-2024 | 445/BHM | 01/02/2024 | Survey, Planning, Design, Supply, Delivery, Erection, Construction, Commissioning and Completion in all respect all Civil and E&M Works including all allied, related and Enabling Works for 5.0 MGD capacity Radial Collector Well, Access Bridge, Substation | 499.78 | BP-2024-25-110 | 20/06/2024 | VCH/000207/2024-2025 |
73 | Birbhum Division | BILL/00289/2024-2025 | 18/06/2024 | SK ALIM | ORD/000596/2022-2023 | 1059/BHM | 31/03/2023 | Different works related to water supply scheme at KANIOR, KOGRAM & KUSHIPUR PWSS & its adjoining mouzas water supply scheme within Nalhati I Block including supply of all labour & materials under BIRBHUM Division, PHE Dte. | 106.53 | BP-2024-25-107 | 19/06/2024 | VCH/000189/2024-2025 |
74 | Birbhum Division | BILL/00366/2024-2025 | 10/07/2024 | KHAYRASOLE PALLY MANGAL SAMITY | ORD/000691/2023-2024 | 138/BSSD | 28/03/2024 | Extension/Continuation work order for Engagement of Lab Personnel for the period from 01.04.2024 to 30.09.2024. | 0.43 | BP-2024-25-135 | 15/07/2024 | VCH/000249/2024-2025 |
75 | Birbhum Division | BILL/00398/2024-2025 | 16/07/2024 | SK AKRAM HOSSAIN | ORD/000704/2023-2024 | 269/BSD | 15/03/2024 | Hiring of 01 (One) no. vehicle for the Office of the Assistant Engineer, Bolpur Sub-Division, P.H.E Dte. under Birbhum Division, P.H.E Dte. For the period of 01.04.2024 to 30.09.2024. | 0.40 | BP-2024-25-142 | 22/07/2024 | VCH/000267/2024-2025 |
76 | Birbhum Division | BILL/00972/2023-2024 | 15/03/2024 | MA KANKALI ENTERPRISE | ORD/000472/2022-2023 | 222/BHM | 20/01/2023 | Additional work for providing Balance FHTC including laying of distribution system for village Geruapahari JL NO 74,G.P Babuijore, Block- Khoirasole for ensuing draught line situation within Birbhum Division PHE Dte. (Sl. No.8) | 0.58 | BP-2024-25-75 | 03/06/2024 | VCH/001151/2023-2024 |
77 | Birbhum Division | BILL/00194/2024-2025 | 28/05/2024 | ENVIROTECH SOLUTIONS | ORD/000802/2022-2023 | 286/RSD | 29/08/2022 | Continuation Work Order for Preparation & Submission of DPR for (BIRCHANDRAPUR) Water Supply Scheme (Part-A) under Mayureswar-I Development Block. | 2.91 | BP-2024-25-84 | 04/06/2024 | VCH/000150/2024-2025 |
78 | Birbhum Division | BILL/00200/2024-2025 | 28/05/2024 | ENVIROTECH SOLUTIONS | ORD/000829/2022-2023 | 310/RSD | 08/09/2022 | Continuation Work Order for Preparation & Submission of DPR for (Bara Turigram) Water Supply Scheme (Part-A) under Mayureswar-I Development Block. | 3.56 | BP-2024-25-84 | 04/06/2024 | VCH/000144/2024-2025 |
79 | Birbhum Division | BILL/00204/2024-2025 | 28/05/2024 | ENVIROTECH SOLUTIONS | ORD/000835/2022-2023 | 371/RSD | 21/09/2022 | Continuation Work Order for Preparation & Submission of DPR for (CHHAMNA) Water Supply Scheme (Part-B) under Mayureswar-II Development Block. | 2.38 | BP-2024-25-84 | 04/06/2024 | VCH/000151/2024-2025 |
80 | Birbhum Division | BILL/00246/2024-2025 | 07/06/2024 | QUALITY COUNCIL OF INDIA | null | AAFEE/3215/23-24 | 11/08/2023 | TC-10930 CERTIFICATE PERIOD 24.08.2022-23.08.2024 DUE PERIOD 24.08.2023-23.08.2024 (Chemical year of Accreditation Cycle) | 0.28 | BP-2024-25-111 | 28/06/2024 | VCH/000223/2024-2025 |
81 | Birbhum Division | BILL/00250/2024-2025 | 10/06/2024 | APURBA MONDAL | ORD/000098/2023-2024 | 1980/BHM | 05/06/2023 | Different works related to water supply scheme at BHEJENA & its adjoining mouzas water supply scheme within MD BAZAR Block including supply of all labour & materials under BIRBHUM Division, PHE Dte. | 62.79 | BP-2024-25-89 | 11/06/2024 | VCH/000158/2024-2025 |
82 | Birbhum Division | BILL/00274/2024-2025 | 13/06/2024 | APEX ENGINEERING | ORD/000656/2022-2023 | 163/BSD | 25/04/2022 | Continuation work order for "Preparation & Submission of Detail Project Report (DPR) for KHAYERBANI Piped Water Supply Scheme under Labpur Development Block within Bolpur Sub-Division under Birbhum Division, PHE Dte." | 2.53 | BP-2024-25-97 | 14/06/2024 | VCH/000171/2024-2025 |
83 | Birbhum Division | BILL/00275/2024-2025 | 13/06/2024 | APEX ENGINEERING | ORD/000661/2022-2023 | 208/BSD | 25/05/2022 | Continuation work order for "Preparation & Submission of Detail Project Report (DPR) for THIBA Piped Water Supply Scheme under Labpur Development Block within Bolpur Sub-Division under Birbhum Division, PHE Dte." | 2.62 | BP-2024-25-97 | 14/06/2024 | VCH/000179/2024-2025 |
84 | Birbhum Division | BILL/00277/2024-2025 | 13/06/2024 | APEX ENGINEERING | ORD/000657/2022-2023 | 172/BSD | 29/04/2022 | Continuation work Order for "Preparation & Submission of Detail Project Report (DPR) for MASTALI Piped Water Supply Scheme under Labpur Development Block within Bolpur Sub-Division under Birbhum Division, PHE Dte." | 2.59 | BP-2024-25-97 | 14/06/2024 | VCH/000188/2024-2025 |
85 | Birbhum Division | BILL/00343/2024-2025 | 28/06/2024 | APEX ENGINEERING | ORD/000951/2022-2023 | 268/BSD | 15/07/2022 | Continuation work for "Preparation & Submission of Detail Project Report (DPR) for TATINAPARA Piped Water Supply Scheme within the command area of Labpur Development Block within Bolpur Sub-Division under Birbhum Division, PHE Dte.¿. | 4.59 | BP-2024-25-115 | 08/07/2024 | VCH/000230/2024-2025 |
86 | Birbhum Division | BILL/00359/2024-2025 | 08/07/2024 | S K CONSTRUCTION | ORD/000190/2023-2024 | 3020/BHM | 14/07/2023 | Different works related to Water Supply Scheme at CHHAMNA & its adjoining mouzas Water Supply Scheme within MAYURESWAR-II Block including supply of all labour & materials under BIRBHUM Division, PHE Dte. | 125.44 | BP-2024-25-129 | 10/07/2024 | VCH/000244/2024-2025 |
87 | Birbhum Division | BILL/00401/2024-2025 | 19/07/2024 | SK ALIM | ORD/000102/2023-2024 | 1723/BHM | 12/05/2023 | Emergent repair and replacement of Pipeline below the Railway culvert near Murarai Railway Station with allied works including extension of Pipe line of Murarai Aug. w/s Scheme under Nalhati Sub-Division within Birbhum Division, P.H.E. Dte. | 20.13 | BP-2024-25-150 | 26/07/2024 | VCH/000271/2024-2025 |
88 | Birbhum Division | BILL/00488/2024-2025 | 06/08/2024 | SOUMITA PAL | ORD/000459/2023-2024 | 27/RSD | 22/01/2024 | Hiring of Ambassador Car (Diesel) registered Luxury Taxi for the office of the Assistant Engineer, Rampurhat Sub-Division P.H.E. Dte. for 24 hours service including Driver and also including the cost of fuel & lubricants as per terms & condition with effe | 0.38 | BP-2024-25-167 | 08/08/2024 | VCH/000342/2024-2025 |
89 | Birbhum Division | BILL/00505/2024-2025 | 13/08/2024 | G.MITRA AND ASSOCIATES | ORD/000832/2020-2021 | 254/BSD | 01/12/2020 | Soil Investigation for determination the safe bearing capacity and other relevant parameters of soil at INDAS O.H.R. site of Indas Water Supply Scheme under Bolpur Sub-Division within Birbhum Division, PHE Dte. | 0.48 | BP-2024-25-185 | 22/08/2024 | VCH/000373/2024-2025 |
90 | Birbhum Division | BILL/00546/2024-2025 | 29/08/2024 | KANACHI KHADI BHANDAR | ORD/000756/2023-2024 | 197/RSD | 28/03/2024 | Engagement of Lab Personals for the Kanachi Khadi Bhandar (period from 01.04.2024 to 30.09.2024). | 0.90 | BP-2024-25-211 | 02/09/2024 | VCH/000496/2024-2025 |
91 | Birbhum Division | BILL/00055/2024-2025 | 24/04/2024 | SSPR VALVE MANUFACTURING PVT LTD | ORD/000347/2023-2024 | 3946/BHM | 03/10/2023 | Supply and delivery of Sluice Valve for Augmentation of Kirnahar Zone-I W/S Scheme under Birbhum Division, P.H.E. Dte. including loading, carriage and unloading at Birbhum Divisional Store at PHE Complex, Dist.-Birbhum under Birbhum Division, P.H.E. Dte | 9.43 | BP-2024-25-87 | 04/06/2024 | VCH/000121/2024-2025 |
92 | Birbhum Division | BILL/00230/2024-2025 | 31/05/2024 | DISTRICT HEALTH AND FAMILY WELFARE SAMITY (DHFWS), BIRBHUM | null | DHFWS/ACCT/697 | 05/04/2024 | Collection & testing of drinking water sample and details information like geographical location GP name /Mouja/habitation location of source with reference household & institution viz schools. angawaris etc. through FTKs & uploading charges related to wa | 21.30 | BP-2024-25-109 | 20/06/2024 | VCH/000205/2024-2025 |
93 | Birbhum Division | BILL/00376/2024-2025 | 15/07/2024 | SOUMITA PAL | ORD/000459/2023-2024 | 27/RSD | 22/01/2024 | Hiring of Ambassador Car (Diesel) registered Luxury Taxi for the office of the Assistant Engineer, Rampurhat Sub-Division P.H.E. Dte. for 24 hours service including Driver and also including the cost of fuel & lubricants as per terms & condition with effe | 0.39 | BP-2024-25-138 | 22/07/2024 | VCH/000259/2024-2025 |
94 | Birbhum Division | BILL/00377/2024-2025 | 15/07/2024 | SOUMITA PAL | ORD/000459/2023-2024 | 27/RSD | 22/01/2024 | Hiring of Ambassador Car (Diesel) registered Luxury Taxi for the office of the Assistant Engineer, Rampurhat Sub-Division P.H.E. Dte. for 24 hours service including Driver and also including the cost of fuel & lubricants as per terms & condition with effe | 0.39 | BP-2024-25-138 | 22/07/2024 | VCH/000260/2024-2025 |
95 | Birbhum Division | BILL/00379/2024-2025 | 15/07/2024 | JOY CHAND MAL | ORD/000699/2023-2024 | 57/NSD | 14/03/2024 | Hiring of SWIFT DZIRE (diesel) registered luxury car for the office of the Assistant Engineer, Nalhati Sub-Division P.H.E. Dte. for 24 hours service including Driver and the cost of fuel & lubricants as per terms & condition with effect from 01.04.2024 to | 0.38 | BP-2024-25-139 | 22/07/2024 | VCH/000265/2024-2025 |
96 | Birbhum Division | BILL/00394/2024-2025 | 16/07/2024 | JAMSED ALI KHAN | ORD/000431/2023-2024 | 4180/BHM | 31/10/2023 | Continution work for Supply of one no. Diesel driven Motor Cab / Maxi Cab (Air Condition) on hire Basis under the Assitant Engineer (H.Q) Birbhum Division P.H.E Dte. (Period from 01.11.2023 to 30.04.2024) | 0.39 | BP-2024-25-141 | 22/07/2024 | VCH/000264/2024-2025 |
97 | Birbhum Division | BILL/00450/2024-2025 | 01/08/2024 | APEX ENGINEERING | ORD/000653/2022-2023 | 141/BSD | 07/04/2022 | Continuation work order for "Preparation & Submission of Detail Project Report (DPR) for BHATRA Piped Water Supply Scheme under Labpur Development Block within Bolpur Sub-Division under Birbhum Division, PHE Dte." | 3.72 | BP-2024-25-178 | 08/08/2024 | VCH/000353/2024-2025 |
98 | Birbhum Division | BILL/00652/2024-2025 | 06/09/2024 | AATHARVA CONSTRUCTION | ORD/000674/2023-2024 | 1034/BHM | 15/03/2024 | Laying of Pipe line (DI) in place of existing damaged UPVC pipe line from Seharakuri more towards Sukna village, restoration of UPVC pipe line for Belgaria village including FHTC and all other allied works under Maldanga Piped Water Supply Scheme within | 4.80 | BP-2024-25-220 | 11/09/2024 | VCH/000501/2024-2025 |
99 | Birbhum Division | BILL/00192/2024-2025 | 28/05/2024 | ENVIROTECH SOLUTIONS | ORD/000832/2022-2023 | 327/RSD | 08/09/2022 | Continuation Work Order for Preparation & Submission of DPR for (Sonj) Water Supply Scheme (Part-A) under Mayureswar-I Development Block. | 2.43 | BP-2024-25-88 | 04/06/2024 | VCH/000133/2024-2025 |
100 | Birbhum Division | BILL/00197/2024-2025 | 28/05/2024 | ENVIROTECH SOLUTIONS | ORD/000806/2022-2023 | 295/RSD | 07/09/2022 | Continuation Work Order for Preparation & Submission of DPR for (Lachhiator) Water Supply Scheme (Part-A) under Mayureswar-I Development Block. | 2.19 | BP-2024-25-84 | 04/06/2024 | VCH/000149/2024-2025 |
101 | Birbhum Division | BILL/00202/2024-2025 | 28/05/2024 | ENVIROTECH SOLUTIONS | ORD/000833/2022-2023 | 428/RSD | 09/11/2022 | Continuation Work Order for Preparation & Submission of DPR for (Sonj) Water Supply Scheme (Part-B) under Mayureswar-I Development Block. | 2.17 | BP-2024-25-88 | 04/06/2024 | VCH/000132/2024-2025 |
102 | Birbhum Division | BILL/00205/2024-2025 | 28/05/2024 | ENVIROTECH SOLUTIONS | ORD/000836/2022-2023 | 292/RSD | 02/09/2022 | Continuation Work Order for Preparation & Submission of DPR for (CHHOTA TURIGRAM ) Water Supply Scheme (Part-A) under Mayureswar-II Development Block. | 2.46 | BP-2024-25-84 | 04/06/2024 | VCH/000154/2024-2025 |
103 | Birbhum Division | BILL/00253/2024-2025 | 10/06/2024 | AJIMUL ISLAM | ORD/000128/2023-2024 | 2073/BHM | 08/06/2023 | Sinking of 1 no. new 200mm dia Tube Well of UPVC pipe 90m deep with fibre glass strainer including connecting main for Rajgram PWSS at Jagannathpur CWR site under Nalhati Sub- Division within Birbhum Division PHED. | 5.54 | BP-2024-25-91 | 11/06/2024 | VCH/000160/2024-2025 |
104 | Birbhum Division | BILL/00268/2024-2025 | 13/06/2024 | APEX ENGINEERING | ORD/000952/2022-2023 | 293/BSD | 29/07/2022 | Continuation work for "Preparation & Submission of additional Detail Project Report (DPR) for DULASAHAPARA Piped Water Supply Scheme within the command area of Labpur Development Block within Bolpur Sub-Division under Birbhum Division, PHE Dte.". | 1.27 | BP-2024-25-97 | 14/06/2024 | VCH/000173/2024-2025 |
105 | Birbhum Division | BILL/00276/2024-2025 | 13/06/2024 | APEX ENGINEERING | ORD/000659/2022-2023 | 185/BSD | 11/05/2022 | Continuation work order for "Preparation & Submission of Detail Project Report (DPR) for RANIPARA Piped Water Supply Scheme under Labpur Development Block within Bolpur Sub-Division under Birbhum Division, PHE Dte." | 2.53 | BP-2024-25-97 | 14/06/2024 | VCH/000183/2024-2025 |
106 | Birbhum Division | BILL/00280/2024-2025 | 13/06/2024 | APEX ENGINEERING | ORD/001135/2021-2022 | 100/BSD | 15/03/2022 | Preparation & Submission of Detail Project Report (DPR) for MONACHITURA Piped Water Supply Scheme under Labpur Development Block within Bolpur Sub-Division under Birbhum Division, PHE Dte. | 4.39 | BP-2024-25-97 | 14/06/2024 | VCH/000169/2024-2025 |
107 | Birbhum Division | BILL/00348/2024-2025 | 28/06/2024 | INDRAJIT DAS | ORD/000534/2022-2023 | 665/BHM | 28/02/2023 | Balance FHTC works at different Villages within coverage area of Tilutia Water Supply Scheme (Zone-II) under Bolpur Sub-Division within Birbhum Division, PHE Dte. (Sl. No.10) | 7.61 | BP-2024-25-121 | 08/07/2024 | VCH/000236/2024-2025 |
108 | Birbhum Division | BILL/00360/2024-2025 | 08/07/2024 | INDRANIL DUTTA | ORD/000511/2023-2024 | 651/BHM | 20/02/2024 | Trial Bore and new Sinking of 200 mm dia. tubewell 5 (Five) nos. each 39 m. Deep fitted with PVC Housing pipe and Fibre Glass Strainer on the river bank of Mayurakshi under Bandirban (Kanmara) Piped Water Supply Scheme within Birbhum Division PHE Dte. (P | 10.51 | BP-2024-25-125 | 10/07/2024 | VCH/000240/2024-2025 |
109 | Birbhum Division | BILL/00403/2024-2025 | 19/07/2024 | M/S KRIPASINDHU GHOSH & CO. | ORD/000401/2023-2024 | 4136/BHM | 18/10/2023 | Different works related to water supply scheme at AMLACHATURI & its adjoining mouzas Water Supply Scheme within RAJNAGAR Block including supply of all labour & materials under Birbhum Division, PHE Dte. | 160.50 | BP-2024-25-154 | 26/07/2024 | VCH/000277/2024-2025 |
110 | Birbhum Division | BILL/00417/2024-2025 | 23/07/2024 | NABIN DEBNATH | ORD/000151/2023-2024 | 2019/BHM | 06/06/2023 | Different works related to water supply scheme at SADANANDPUR & its adjoining mouzas water supply scheme within MD BAZAR Block including supply of all labour & materials under BIRBHUM Division, PHE Dte. | 87.32 | BP-2024-25-151 | 26/07/2024 | VCH/000274/2024-2025 |
111 | Birbhum Division | BILL/00421/2024-2025 | 29/07/2024 | PINTU KHAN | ORD/000150/2023-2024 | 1979/BHM | 05/06/2023 | Balance work for for Uttar Gobindapur area, Connecting pipe line, rest portion laying of pipe line for Functional Household Tap Connection (FHTC) of Deriapur Piped Water Supply Scheme under Birbhum Sadar Sub-Division, P.H.E. Dte. within Birbhum Division | 28.01 | BP-2024-25-159 | 30/07/2024 | VCH/000280/2024-2025 |
112 | Birbhum Division | BILL/00500/2024-2025 | 12/08/2024 | KHAYRASOLE PALLY MANGAL SAMITY | ORD/000691/2023-2024 | 138/BSSD | 28/03/2024 | Extension/Continuation work order for Engagement of Lab Personnel for the period from 01.04.2024 to 30.09.2024. | 0.43 | BP-2024-25-189 | 20/08/2024 | VCH/000377/2024-2025 |
113 | Birbhum Division | BILL/00553/2024-2025 | 30/08/2024 | B RAI CONSTRUCTION COMPANY | ORD/000471/2023-2024 | 505/BHM | 05/02/2024 | Different works related to water supply scheme at BIRCHANDRAPUR, ASURLAYA, BARATURIGRAM & KANAIPUR and its adjoining mouzas water supply scheme within MAYURESWAR-I Block including supply of all labour & materials under Birbhum Division, PHE Dte. (2nd C | 163.08 | BP-2024-25-205 | 02/09/2024 | VCH/000490/2024-2025 |
114 | Birbhum Division | BILL/00207/2024-2025 | 28/05/2024 | ENVIROTECH SOLUTIONS | ORD/000838/2022-2023 | 296/RSD | 07/09/2022 | Continuation Work Order for Preparation & Submission of DPR for (DUNA) Water Supply Scheme (Part-A) under Mayureswar-II Development Block. | 2.34 | BP-2024-25-84 | 04/06/2024 | VCH/000134/2024-2025 |
115 | Birbhum Division | BILL/00223/2024-2025 | 30/05/2024 | B RAI CONSTRUCTION COMPANY | ORD/000385/2023-2024 | 4142/BHM | 19/10/2023 | Different works related to water supply scheme at LACHHIATOR, DAKSHINGRAM, SONJ & SHIBGRAM and its adjoining mouzas water supply scheme within MAYURESWAR-I Block including supply of all labour & materials under Birbhum Division, PHE Dte. | 172.79 | BP-2024-25-77 | 03/06/2024 | VCH/000136/2024-2025 |
116 | Birbhum Division | BILL/00375/2024-2025 | 15/07/2024 | SOUMITA PAL | ORD/000228/2023-2024 | 199/RSD | 28/07/2023 | Hiring of Ambassador Car (Diesel) registered Luxury Taxi for the office of the Assistant Engineer, Rampurhat Sub-Division P.H.E. Dte. for 24 hours service including Driver and also including the cost of fuel & lubricants as per terms & condition with effe | 0.39 | BP-2024-25-137 | 22/07/2024 | VCH/000258/2024-2025 |
117 | Birbhum Division | BILL/00389/2024-2025 | 16/07/2024 | MS BIMAL MISRA | ORD/000766/2021-2022 | 1551/BHM | 16/09/2021 | Community based Water Supply arrangement for Fluoride Affected Habitations with SOLAR Power Connection at Village Rautandihi (01 No. Tubewell), Jamsole (1 no.) under Nalhati-I Block & Gopalnagar (01 No. Tubewell) under Dubrajpur Dev. Block within Birbhum | 12.98 | BP-2024-25-144 | 22/07/2024 | VCH/000253/2024-2025 |
118 | Birbhum Division | BILL/00445/2024-2025 | 01/08/2024 | M/S KRIPASINDHU GHOSH & CO. | ORD/000491/2022-2023 | 288/BHM | 01/02/2023 | Retrofitting work for Providing Balance Functional Household Tap Connection (FHTC) in Lalbazar, Malitpur, Saripa and Talbana within the Command area of Bipratikuri Water Supply Scheme (Phase-I) for Swajal Gram under Labpur Block of Bolpur Sub-Division wit | 19.30 | BP-2024-25-168 | 08/08/2024 | VCH/000343/2024-2025 |
119 | Birbhum Division | BILL/00447/2024-2025 | 01/08/2024 | M/S MD AMINUL ISLAM | ORD/000100/2023-2024 | 1719/BHM | 12/05/2023 | Different works related to water supply scheme at SIMGRAM & its adjoining mouzas water supply scheme within MURARAI-II Block including supply of all labour & materials under BIRBHUM Division, PHE Dte. | 12.01 | BP-2024-25-175 | 08/08/2024 | VCH/000350/2024-2025 |
120 | Birbhum Division | BILL/00510/2024-2025 | 14/08/2024 | BIPIN KUMAR SINGH | ORD/000278/2023-2024 | 3598/BHM | 21/08/2023 | Different works related to water supply scheme at MATIKONA, NOHONA, SHIRSHA & CHUNPALASHI Piped Water Supply Scheme within ILLAMBAZAR Block including supply of all labour & materials under Bolpur Sub-Division within Birbhum Division, PHE Dte. | 109.82 | BP-2024-25-187 | 22/08/2024 | VCH/000375/2024-2025 |
121 | Birbhum Division | BILL/00526/2024-2025 | 23/08/2024 | SK.RUHUL AMIN | ORD/000618/2023-2024 | 166/BSD | 15/02/2024 | Laying of Distribution Pipeline with FHTC work at Chowhatta village of Chowhatta Water Supply Scheme due to CMRO Grievance (Grievance Lodging Date: 15.12.2023, Complainant Name: Sk Indadul) in Chowhatta Mohodori - I Gram Panchayet under Bolpur Sub-Divisio | 0.93 | BP-2024-25-195 | 27/08/2024 | VCH/000390/2024-2025 |
122 | Birbhum Division | BILL/00191/2024-2025 | 28/05/2024 | ENVIROTECH SOLUTIONS | ORD/000839/2022-2023 | 423/RSD | 03/11/2022 | Continuation Work Order for Preparation & Submission of DPR for (DUNA) Water Supply Scheme (Part-B) under Mayureswar-II Development Block. | 2.51 | BP-2024-25-84 | 04/06/2024 | VCH/000155/2024-2025 |
123 | Birbhum Division | BILL/00260/2024-2025 | 11/06/2024 | KANACHI KHADI BHANDAR | null | PHE/WSSO/112/2827-2844 | 07/12/2015 | Bill for Remuneration of Chemist, Bacteriologist, Lab-Assistant Under Kanachi Khadi Bhandar Sub-District Laboratory (Name of NGO) for the period of MAY- 2024 | 0.45 | BP-2024-25-99 | 14/06/2024 | VCH/000181/2024-2025 |
124 | Birbhum Division | BILL/00262/2024-2025 | 11/06/2024 | RAMPURHAT PARIBESH PARISEVA | null | PHE/WSSO/112/2827-2844 | 07/12/2015 | Bill for Remuneration of Chemist, Bacteriologist, Lab-Assistant Under Rampurhat Paribesh pariseva Sub-District Laboratory (Name of NGO) for the period of MAY-2024 | 0.45 | BP-2024-25-100 | 14/06/2024 | VCH/000182/2024-2025 |
125 | Birbhum Division | BILL/00267/2024-2025 | 13/06/2024 | APEX ENGINEERING | ORD/000947/2022-2023 | 232/BSD | 10/06/2022 | Continuation work for "Preparation & Submission of Detail Project Report (DPR) for DULASAHAPARA Piped Water Supply Scheme within the command area of Labpur Development Block within Bolpur Sub-Division under Birbhum Division, PHE Dte.". | 3.98 | BP-2024-25-97 | 14/06/2024 | VCH/000174/2024-2025 |
126 | Birbhum Division | BILL/00350/2024-2025 | 28/06/2024 | SOURAV MONDAL | ORD/000515/2023-2024 | 663/BHM | 20/02/2024 | Laying of HDPE distribution parallel pipe line under Maldanga (Zone-I) Piped Water Supply Scheme under Birbhum Division, P.H.E. Dte. | 2.45 | BP-2024-25-122 | 08/07/2024 | VCH/000237/2024-2025 |
127 | Birbhum Division | BILL/00402/2024-2025 | 19/07/2024 | INDRANIL DUTTA | ORD/000509/2023-2024 | 652/BHM | 20/02/2024 | Trial Bore and Sinking for 03 nos. working 200mm dia. Tubewell of 6m depth each with horizontal strainer on the river Bed of Kuskurini and connecting pipe line etc. complete under Augmentation of Nagari Piped Water Supply Scheme under Birbhum Sadar Sub-Di | 6.91 | BP-2024-25-149 | 26/07/2024 | VCH/000270/2024-2025 |
128 | Birbhum Division | BILL/00497/2024-2025 | 09/08/2024 | B.M.SARKAR | ORD/000292/2022-2023 | 2434/BHM | 02/11/2022 | Providing necessary water supply arrangement at 27 (Twenty Seven) Nos. Anganwadi Center having no Electric Power Connection under Kendgore, Khoyrasole & Hazratpur G.P. within the command area of Khoyrasole Development Block under Birbhum Division P.H.E.Dt | 1.39 | BP-2024-25-182 | 13/08/2024 | VCH/000357/2024-2025 |
129 | Birbhum Division | BILL/00504/2024-2025 | 13/08/2024 | M/S MD AMINUL ISLAM | ORD/000353/2022-2023 | 2689/BHM | 06/12/2022 | Laying of Rising Main , Distribution system and Providing FHTC including all allied Works for Piped Water Supply Scheme for Khedamara Mouza (Paikpara Village) under Rampurhat - I Block within Birbhum District. (Sl. No.8) | 14.02 | BP-2024-25-188 | 22/08/2024 | VCH/000376/2024-2025 |
130 | Birbhum Division | BILL/00549/2024-2025 | 30/08/2024 | INDRAJIT DUTTA. | ORD/000667/2023-2024 | 1030/BHM | 15/03/2024 | Trial Bore and new Sinking of 200 mm dia. tubewell 4 (Four) nos. each 39 m. Deep fitted with PVC Housing pipe and Fibre Glass Strainer on the river bank of Mayurakshi under Bandirban (Kanmara) Piped Water Supply Scheme within Birbhum Division, PHE Dte. (P | 5.99 | BP-2024-25-210 | 02/09/2024 | VCH/000495/2024-2025 |
131 | Birbhum Division | BILL/00555/2024-2025 | 30/08/2024 | SSPR VALVE MANUFACTURING PVT LTD | ORD/000607/2023-2024 | 907/BHM | 13/03/2024 | Continuation Work Order for Supply and delivery of Sluice Valve for Augmentation of Kirnahar Zone-I W/S Scheme under Birbhum Division, P.H.E. Dte. including loading, carriage and unloading at Birbhum Divisional Store at PHE Complex, Dist.-Birbhum under | 9.43 | BP-2024-25-207 | 02/09/2024 | VCH/000492/2024-2025 |
132 | Birbhum Division | BILL/00138/2024-2025 | 16/05/2024 | RAMESH AND SHANTI ENGINEERING WORKS | ORD/000466/2023-2024 | 485/BHM | 02/02/2024 | Continuation work order for Supply and delivery of Sluice Valve for Augmentation of Labpur Zone-I W/S Scheme under Birbhum Division, P.H.E. Dte. including loading, carriage and unloading at Birbhum Divisional Store at PHE Complex, Dist.-Birbhum under Bi | 7.69 | BP-2024-25-80 | 03/06/2024 | VCH/000123/2024-2025 |
133 | Birbhum Division | BILL/00206/2024-2025 | 28/05/2024 | ENVIROTECH SOLUTIONS | ORD/000837/2022-2023 | 380/RSD | 26/09/2022 | Continuation Work Order for Preparation & Submission of DPR for (CHHOTA TURIGRAM) Water Supply Scheme (Part-B) under Mayureswar-II Development Block. | 3.23 | BP-2024-25-84 | 04/06/2024 | VCH/000153/2024-2025 |
134 | Birbhum Division | BILL/00212/2024-2025 | 28/05/2024 | ENVIROTECH SOLUTIONS | ORD/000844/2022-2023 | 334/RSD | 08/09/2022 | Continuation Work Order for Preparation & Submission of DPR for (SULTANPUR) Water Supply Scheme (Part-A) under Mayureswar-II Development Block. | 2.61 | BP-2024-25-84 | 04/06/2024 | VCH/000139/2024-2025 |
135 | Birbhum Division | BILL/00233/2024-2025 | 06/06/2024 | SOURAV MONDAL | ORD/000520/2023-2024 | 671/BHM | 20/02/2024 | Extension of distribution pipe line from Kushmasol to Chandpur, Nichupara and English Medium School and all other allied works for augmentation of Patharchapuri Piped Water Supply Scheme under Birbhum Sadar Sub-Division, P.H.E. Dte. within Birbhum Divisio | 5.12 | BP-2024-25-93 | 11/06/2024 | VCH/000162/2024-2025 |
136 | Birbhum Division | BILL/00287/2024-2025 | 14/06/2024 | MANASH GHOSH | ORD/000606/2023-2024 | 925/BHM | 13/03/2024 | Allied for Restoration of Existing Bitumious Pucca Road for Laying of Rising Main pipe line from Panchara village to Bahadurpur (Aprox 6 Km) under Panchra Piped Water Supply Scheme under Birbhum Sadar Sub-Division, PHE Dte. within Birbhum Division, P.H.E. | 99.56 | BP-2024-25-102 | 18/06/2024 | VCH/000184/2024-2025 |
137 | Birbhum Division | BILL/00372/2024-2025 | 15/07/2024 | SOUMITA PAL | ORD/000228/2023-2024 | 199/RSD | 28/07/2023 | Hiring of Ambassador Car (Diesel) registered Luxury Taxi for the office of the Assistant Engineer, Rampurhat Sub-Division P.H.E. Dte. for 24 hours service including Driver and also including the cost of fuel & lubricants as per terms & condition with effe | 0.29 | BP-2024-25-137 | 22/07/2024 | VCH/000255/2024-2025 |
138 | Birbhum Division | BILL/00388/2024-2025 | 16/07/2024 | PURNENDU SAKHAR CHANDRA | ORD/000406/2023-2024 | 4207/BHM | 03/11/2023 | Construction of Boundary Wall(57.00 m long approx) & Approach Road, Land Development at Pump House-II Site Village- Belgram within the coverage area of Tilutia Water Supply Scheme (Zone-II) under Bolpur Sub-Division within Birbhum Division, PHE Dte | 6.84 | BP-2024-25-143 | 22/07/2024 | VCH/000251/2024-2025 |
139 | Birbhum Division | BILL/00448/2024-2025 | 01/08/2024 | SHREE J.M. CONSTRUCTION | ORD/000256/2023-2024 | 3441/BHM | 03/08/2023 | Different works related to water supply scheme at NETURI, PAIKPARA & PAKURIA and its adjoining mouzas water supply scheme within SAINTHIA Block including supply of all labour & materials under Birbhum Division, PHE Dte. | 131.51 | BP-2024-25-171 | 08/08/2024 | VCH/000346/2024-2025 |
140 | Birbhum Division | BILL/00535/2024-2025 | 27/08/2024 | NUR MOBINUL ISLAM | ORD/000589/2022-2023 | 1014/BHM | 30/03/2023 | Providing functional household tap connection (FHTC) from existing distribution system within the command area of Dantura Water Supply Scheme under Nalhati Sub Division within Birbhum Division P.H.E. Dte. | 17.43 | BP-2024-25-199 | 28/08/2024 | VCH/000394/2024-2025 |
141 | Birbhum Division | BILL/00650/2024-2025 | 06/09/2024 | B RAI CONSTRUCTION COMPANY | ORD/000384/2023-2024 | 4141/BHM | 19/10/2023 | Different works related to water supply scheme at DHANASAHA, CHHATAR-BANDI, BHABANIPUR, BHUBANESWAR Piped Water Supply Scheme within ILLAMBAZAR Block including supply of all labour & materials under Bolpur Sub-Division within Birbhum Division, PHE Dte | 216.71 | BP-2024-25-221 | 11/09/2024 | VCH/000503/2024-2025 |
142 | Birbhum Division | BILL/00651/2024-2025 | 06/09/2024 | ABUL HASNATH | ORD/000351/2023-2024 | 3948/BHM | 03/10/2023 | Construction of Switch room at Pump House Site with sanitary and water supply arrangement to departmental drawing (Size 3.60 mtr x 3.30 mtr room with 1.2 Mtr. wide verandah), Boundary Wall, PCC approach Road, Land Development (PH No-3) for Augumentatio | 11.59 | BP-2024-25-222 | 11/09/2024 | VCH/000502/2024-2025 |
143 | Birbhum Division | BILL/00653/2024-2025 | 06/09/2024 | MD ABSAR ALI | ORD/000296/2023-2024 | 3669/BHM | 28/08/2023 | Construction of Office cumGo Down building of Raghunathpur PWSS within Nalhati Sub Division office Premises. | 4.54 | BP-2024-25-219 | 11/09/2024 | VCH/000500/2024-2025 |
144 | Birbhum Division | BILL/00190/2024-2025 | 28/05/2024 | ENVIROTECH SOLUTIONS | ORD/000805/2022-2023 | 376/RSD | 23/09/2022 | Continuation Work Order for Preparation & Submission of DPR for (DAKSHIN GRAM) Water Supply Scheme (Part-B) under Mayureswar-I Development Block. | 2.81 | BP-2024-25-84 | 04/06/2024 | VCH/000147/2024-2025 |
145 | Birbhum Division | BILL/00252/2024-2025 | 10/06/2024 | SK ALIM | ORD/000284/2022-2023 | 2277/BHM | 19/10/2022 | Construction of 1000 Cum Capacity and 20.0m Staging Height RCC Over Head Reservoir along with Soil Test and Laying of HDPE pipeline from node point 6 to 13 and node point 272 to 378 and cutting & restoration of concrete road for laying of extension pip | 87.02 | BP-2024-25-90 | 11/06/2024 | VCH/000159/2024-2025 |
146 | Birbhum Division | BILL/00265/2024-2025 | 13/06/2024 | BAHIR CONSTRUCTION PRIVATE LIMITED | ORD/000579/2023-2024 | 737/BHM | 28/02/2024 | Continuation Work Order for Supply and delivery of Sluice Valve for Augmentation of Khoyrasole Zone-II W/S Scheme under Birbhum Division, P.H.E. Dte. including loading, carriage and unloading at Birbhum Divisional Store at PHE Complex, Dist.-Birbhum un | 9.30 | BP-2024-25-98 | 14/06/2024 | VCH/000166/2024-2025 |
147 | Birbhum Division | BILL/00273/2024-2025 | 13/06/2024 | APEX ENGINEERING | ORD/000655/2022-2023 | 155/BSD | 18/04/2022 | Continuation work order for "Preparation & Submission of Detail Project Report (DPR) for KADOA Piped Water Supply Scheme under Labpur Development Block within Bolpur Sub-Division under Birbhum Division, PHE Dte." | 2.94 | BP-2024-25-97 | 14/06/2024 | VCH/000170/2024-2025 |
148 | Birbhum Division | BILL/00281/2024-2025 | 13/06/2024 | APEX ENGINEERING | ORD/001144/2021-2022 | 112/BSD | 25/03/2022 | Continuation work order for "Preparation & Submission of Detail Project Report (DPR) for KURUMBA Piped Water Supply Scheme under Labpur Development Block within Bolpur Sub-Division under Birbhum Division, PHE Dte." | 3.40 | BP-2024-25-97 | 14/06/2024 | VCH/000172/2024-2025 |
149 | Birbhum Division | BILL/00345/2024-2025 | 28/06/2024 | NAUTANDAS AND CO | ORD/000047/2023-2024 | 1258/BHM | 17/04/2023 | Different works related to water supply scheme at BHALIAN, BANGJITA & BIRSINGHA and its adjoining mouzas water supply scheme within SAINTHIA Block including supply of all labour & materials under Birbhum Division, PHE Dte. | 83.96 | BP-2024-25-117 | 08/07/2024 | VCH/000232/2024-2025 |
150 | Birbhum Division | BILL/00362/2024-2025 | 08/07/2024 | BRAHMA CONSTRUCTION COMPANY | ORD/000067/2023-2024 | 1340/BHM | 20/04/2023 | Different works related to water supply scheme at MELANPUR & its adjoining mouzas water supply scheme within SAINTHIA Block including supply of all labour & materials under BIRBHUM Division, PHE Dte. | 76.00 | BP-2024-25-127 | 10/07/2024 | VCH/000242/2024-2025 |
151 | Birbhum Division | BILL/00419/2024-2025 | 25/07/2024 | BIRBHUM INFRAPARK PRIVATE LIMITED | ORD/000333/2022-2023 | 2624/BHM | 28/11/2022 | Implementation of MINI PIPED WATER SUPPLY SCHEME through Waterjet & DTH Boring in 334 (Three Hundred and Thirty Four) no. villages under different blocks having less than 100 households under Birbhum Division PHE Dte. | 0.07 | BP-2024-25-158 | 29/07/2024 | VCH/000279/2024-2025 |
152 | Birbhum Division | BILL/00484/2024-2025 | 06/08/2024 | SK ABDUL HALIM | ORD/000045/2023-2024 | 1173/BHM | 12/04/2023 | Different works related to water supply scheme at MADHURA & PAIKPARA PWSS its adjoining mouzas water supply scheme within Nalhati I Block including supply of all labour & materials under BIRBHUM Division, PHE Dte | 185.59 | BP-2024-25-172 | 08/08/2024 | VCH/000347/2024-2025 |
153 | Birbhum Division | BILL/00493/2024-2025 | 06/08/2024 | MS S CHOUDHURY | ORD/000205/2023-2024 | 3236/BHM | 25/07/2023 | Different works works related to water supply scheme at Atkulia, Shitalgram & its adjoining mouzas water supply scheme within NALHATI-II Block including supply of all labour & materials under BIRBHUM Division, PHE Dte | 156.15 | BP-2024-25-176 | 08/08/2024 | VCH/000351/2024-2025 |
154 | Birbhum Division | BILL/00499/2024-2025 | 09/08/2024 | WEIR AND DECK CONSTRUCTION ENGINEERS CO OP SOCIETY LTD | ORD/000153/2022-2023 | 1849/BHM | 30/08/2022 | Community based Water Supply arrangement for Fluoride Affected Habitations with SOLAR Power Connection at Village BILASPUR (01 No. Tubewell) under Mayurewar-I Block within Birbhum Divn. P.H.E. Dte. (upto 2.0 ppm) (Population upto 250)¿ (Sl. No.2) | 4.54 | BP-2024-25-181 | 13/08/2024 | VCH/000356/2024-2025 |
155 | Birbhum Division | BILL/00508/2024-2025 | 13/08/2024 | PREMANANDA ROY BISWAS | ORD/000473/2023-2024 | 523/BHM | 05/02/2024 | Different works related to water supply scheme at MASTALI Piped Water Supply Scheme (TSM/017207) within Labpur Block including supply of all labour & materials under Bolpur Sub-Division within Birbhum Division, PHE Dte. (3rd Call) | 37.42 | BP-2024-25-190 | 20/08/2024 | VCH/000378/2024-2025 |
156 | Birbhum Division | BILL/00551/2024-2025 | 30/08/2024 | M/S PROCHESTA ENTERPRISE | ORD/000101/2023-2024 | 1722/BHM | 12/05/2023 | Allied for balance work of distribution pipeline for Dhitora (Part) village including FHTC under Augmentation of Murarai W/S Scheme under Nalhati Sub-division within Birbhum Division P.H.E. Dte. | 13.10 | BP-2024-25-208 | 02/09/2024 | VCH/000493/2024-2025 |
157 | Birbhum Division | BILL/00556/2024-2025 | 30/08/2024 | BENGAL ENGINEERING | ORD/000288/2023-2024 | 3647/BHM | 25/08/2023 | Different works related to water supply scheme at KASHIMNAGAR, KAMARKHUL & GAGANPUR and its adjoining mouzas water supply scheme within MURARAI-II Block including supply of all labour & materials under BIRBHUM Division, PHE Dte. | 96.00 | BP-2024-25-203 | 02/09/2024 | VCH/000488/2024-2025 |
158 | Birbhum Division | BILL/00557/2024-2025 | 30/08/2024 | M/S GOUTAM DAS | ORD/000272/2022-2023 | 2246/BHM | 17/10/2022 | Laying distribution system including FHTC for proposed augmentation scheme for Mollarpur Zone-I Piped Water Supply Scheme, Mayureswar-I Block, under Birbhum Division, PHE Dte. (2nd Call)¿ (SL.No.1) | 49.76 | BP-2024-25-214 | 06/09/2024 | VCH/000499/2024-2025 |
159 | Birbhum Division | BILL/00558/2024-2025 | 30/08/2024 | NAUTANDAS AND CO | ORD/000398/2023-2024 | 4137/BHM | 18/10/2023 | Different works related to water supply scheme at MONOHARPUR, MOSTALA, RUPPUR & SALAN Piped Water Supply Scheme within BOLPUR-SRINIKETAN Block including supply of all labour & materials under BIRBHUM Division, PHE Dte. | 121.73 | BP-2024-25-204 | 02/09/2024 | VCH/000489/2024-2025 |
160 | Birbhum Division | BILL/00365/2024-2025 | 08/07/2024 | NABIN DEBNATH | ORD/000267/2023-2024 | 3521/BHM | 11/08/2023 | Construction of 400 cum capacity 20mtr. Staging height RCC Over Head Reservoir over RCC Raft foundation including pipe connection & allied works for augmentation of Bara Zone II W/S Scheme under Nalhati Sub Division with Birbhum Division, PHE Dte.(As p | 40.00 | BP-2024-25-126 | 10/07/2024 | VCH/000241/2024-2025 |
161 | Birbhum Division | BILL/00370/2024-2025 | 10/07/2024 | AVIJIT CHANDA | ORD/000473/2022-2023 | 223/BHM | 20/01/2023 | Providing necessary water supply arrangement at 17 (Seventeen) Nos Primary School having Electric Power Connection within the command area of Labpur Development Block under Birbhum Division P.H.E.Dte.(Sl. No.5) | 4.89 | BP-2024-25-133 | 15/07/2024 | VCH/000248/2024-2025 |
162 | Birbhum Division | BILL/00371/2024-2025 | 10/07/2024 | A.R. TRADERS | ORD/000519/2023-2024 | 669/BHM | 20/02/2024 | Sinking replacement of 200mm dia. Tube Well of UPVC pipe 90m deep with fibre glass strainer including connecting main for Raghunathpur PWSS under Nalhati Sub-Division within Birbhum Division, PHED. | 14.32 | BP-2024-25-136 | 15/07/2024 | VCH/000250/2024-2025 |
163 | Birbhum Division | BILL/00374/2024-2025 | 15/07/2024 | SOUMITA PAL | ORD/000228/2023-2024 | 199/RSD | 28/07/2023 | Hiring of Ambassador Car (Diesel) registered Luxury Taxi for the office of the Assistant Engineer, Rampurhat Sub-Division P.H.E. Dte. for 24 hours service including Driver and also including the cost of fuel & lubricants as per terms & condition with effe | 0.38 | BP-2024-25-137 | 22/07/2024 | VCH/000257/2024-2025 |
164 | Birbhum Division | BILL/00396/2024-2025 | 16/07/2024 | AADIL CONSTRUCTION | ORD/000616/2023-2024 | 481/RWS | 28/12/2023 | Supply of one no. diesel driven car(Diesel) on hire basis office uses for the officials of the Assistant Engineer, RWS, Birbhum Sub-Division, PHE Dte. (Period from 01.01.2024 to 27.06.2024) | 0.39 | BP-2024-25-147 | 22/07/2024 | VCH/000252/2024-2025 |
165 | Birbhum Division | BILL/00397/2024-2025 | 16/07/2024 | SK AKRAM HOSSAIN | ORD/000704/2023-2024 | 269/BSD | 15/03/2024 | Hiring of 01 (One) no. vehicle for the Office of the Assistant Engineer, Bolpur Sub-Division, P.H.E Dte. under Birbhum Division, P.H.E Dte. For the period of 01.04.2024 to 30.09.2024. | 0.40 | BP-2024-25-142 | 22/07/2024 | VCH/000266/2024-2025 |
166 | Birbhum Division | BILL/00446/2024-2025 | 01/08/2024 | SHIB GANGA CONSTRUCTION | ORD/000382/2023-2024 | 228/NSD | 05/06/2023 | Sinking of 200 mm dia. & 87 mtr. deep Tube well fitted with PVC pipe and fibre glass Strainer at 2nd Tube well site of Dantura Water Supply Scheme under Nalhati Sub-Division within Birbhum Division, PHE Dte. | 4.27 | BP-2024-25-165 | 08/08/2024 | VCH/000339/2024-2025 |
167 | Birbhum Division | BILL/00449/2024-2025 | 01/08/2024 | WEIR AND DECK CONSTRUCTION ENGINEERS CO OP SOCIETY LTD | ORD/000093/2023-2024 | 1643/BHM | 02/05/2023 | Different works related to water supply scheme at NOHANA & its adjoining mouzas water supply scheme within SAINTHIA Block including supply of all labour & materials under BIRBHUM Division, PHE Dte. | 96.25 | BP-2024-25-174 | 08/08/2024 | VCH/000349/2024-2025 |
168 | Birbhum Division | BILL/00519/2024-2025 | 21/08/2024 | RUBAL CONSTRACTION | ORD/001169/2021-2022 | 2013(1)/BHM | 08/12/2021 | Construction of CWR of Capacity 200 cum. including all allied Works as per departmental drawing under Panchara W/S Scheme within Suri Sadar Sub-Division under Birbhum Division, PHE Dte. | 27.08 | BP-2024-25-193 | 22/08/2024 | VCH/000369/2024-2025 |
169 | Birbhum Division | BILL/00189/2024-2025 | 28/05/2024 | ENVIROTECH SOLUTIONS | ORD/000804/2022-2023 | 291/RSD | 02/09/2022 | Continuation Work Order for Preparation & Submission of DPR for (DAKSHIN GRAM) Water Supply Scheme (Part-A) under Mayureswar-I Development Block. | 2.61 | BP-2024-25-84 | 04/06/2024 | VCH/000146/2024-2025 |
170 | Birbhum Division | BILL/00203/2024-2025 | 28/05/2024 | ENVIROTECH SOLUTIONS | ORD/000834/2022-2023 | 287/RSD | 31/08/2022 | Continuation Work Order for Preparation & Submission of DPR for (CHHAMNA) Water Supply Scheme (Part-A) under Mayureswar-II Development Block. | 2.70 | BP-2024-25-84 | 04/06/2024 | VCH/000152/2024-2025 |
171 | Birbhum Division | BILL/00126/2024-2025 | 16/05/2024 | TEKNO ENTERPRISE | ORD/000241/2022-2023 | 2769/BHM | 14/12/2022 | Construction of 750cum capacity 20mtr. Staging height RCC Over Head Reservoir over RCC pile foundation including pipe connection & allied works for augmentation of Kirnahar Zone-I W/S Scheme under Birbhum Division, PHE Dte.(As per Departmental Drawing)¿ | 45.54 | BP-2024-25-78 | 03/06/2024 | VCH/000122/2024-2025 |
172 | Birbhum Division | BILL/00245/2024-2025 | 07/06/2024 | QUALITY COUNCIL OF INDIA | null | AC/5105/23-24 | 26/10/2023 | Surveillance conducted on 9 Sep'23 to 10 Sep'23 honorarium of Rajni kant sharma DR Papia Das | 0.39 | BP-2024-25-112 | 28/06/2024 | VCH/000224/2024-2025 |
173 | Birbhum Division | BILL/00248/2024-2025 | 10/06/2024 | KHAYRASOLE PALLY MANGAL SAMITY | ORD/000691/2023-2024 | 138/BSSD | 28/03/2024 | Extension/Continuation work order for Engagement of Lab Personnel for the period from 01.04.2024 to 30.09.2024. | 0.43 | BP-2024-25-92 | 11/06/2024 | VCH/000161/2024-2025 |
174 | Birbhum Division | BILL/00266/2024-2025 | 13/06/2024 | APEX ENGINEERING | ORD/000662/2022-2023 | 214/BSD | 31/05/2022 | Continuation work Order for "Preparation & Submission of Detail Project Report (DPR) for GOPINATHPUR Piped Water Supply Scheme under Labpur Development Block within Bolpur Sub-Division under Birbhum Division, PHE Dte." | 3.70 | BP-2024-25-97 | 14/06/2024 | VCH/000175/2024-2025 |
175 | Birbhum Division | BILL/00347/2024-2025 | 28/06/2024 | M/S PROCHESTA ENTERPRISE | ORD/000036/2023-2024 | 1108/BHM | 10/04/2023 | Different works related to water supply scheme at DHITORA & its adjoining mouzas water supply scheme within MURARAI-I Block including supply of all labour & materials under BIRBHUM Division, PHE Dte. | 28.80 | BP-2024-25-120 | 08/07/2024 | VCH/000235/2024-2025 |
176 | Birbhum Division | BILL/00404/2024-2025 | 19/07/2024 | RICK CONSTRUCTION | ORD/000514/2023-2024 | 662/BHM | 20/02/2024 | Allied work for Construction of Boundary wall near Mama Bhagne Pahar & Shifting of Rising main pipe line near Sal River Bridge due to pipe line beneath the NH Road under the Augmentation of Dubrajpur Rural Piped Water Supply Scheme under Birbhum Sadar Sub | 3.90 | BP-2024-25-162 | 01/08/2024 | VCH/000337/2024-2025 |
177 | Birbhum Division | BILL/00405/2024-2025 | 19/07/2024 | RICK CONSTRUCTION | ORD/000369/2023-2024 | 3750/BHM | 05/09/2023 | Allied work for Providing Functional Household Tap Connection (FHTC) from exixting distribution system within the command area of Rasa W/S Scheme in Suri Sadar Sub-Division under Birbhum Division, PHE Dte. | 9.87 | BP-2024-25-163 | 05/08/2024 | VCH/000354/2024-2025 |
178 | Birbhum Division | BILL/00407/2024-2025 | 19/07/2024 | MUKHERJEE CONSTRUCTION | ORD/000083/2023-2024 | 1440/BHM | 25/04/2023 | Different works for SIUR & its adjoining mouzas water supply scheme within SURI-I Block including supply of all labour & materials under BIRBHUM Division, PHE Dte. | 145.68 | BP-2024-25-152 | 26/07/2024 | VCH/000275/2024-2025 |
179 | Birbhum Division | BILL/00420/2024-2025 | 29/07/2024 | MANAS KUMAR MONDAL | ORD/000277/2022-2023 | 2245/BHM | 17/10/2022 | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Tilutia Zone-I under Tilutia Zone-I Water Supply Scheme within Birbhum Division, PHE Dte. | 14.15 | BP-2024-25-161 | 30/07/2024 | VCH/000281/2024-2025 |
180 | Birbhum Division | BILL/00422/2024-2025 | 29/07/2024 | RICK CONSTRUCTION | ORD/000095/2023-2024 | 1647/BHM | 02/05/2023 | Providing FHTC including laying of distribution system within the command area of villages Rajganja, Hajrapur, Chinpai & Balijuri , G.P - Parulia, Chinpai & Balijuri, Block - Dubrajpur for ensuing draught like situation within Birbhum Division, PHE Dte. | 7.87 | BP-2024-25-164 | 05/08/2024 | VCH/000355/2024-2025 |
181 | Birbhum Division | BILL/00506/2024-2025 | 13/08/2024 | MOYTEC | ORD/000974/2022-2023 | 259/BSD | 07/07/2022 | Soil Investigation for determination the safe bearing capacity and other relevant parameters of Soil at Muluk Adarshapally Adibasi para for Augmentation of Bolpur Water Supply, Sanitation & Health Education Project (Indo-German), Zone - XIII under Bolpur | 1.57 | BP-2024-25-184 | 22/08/2024 | VCH/000372/2024-2025 |
182 | Birbhum Division | BILL/00545/2024-2025 | 28/08/2024 | M/S UNIT CONSTRUCTION | ORD/000349/2023-2024 | 3950/BHM | 03/10/2023 | Additional dismantling of Concrete Works at diff mouzas for LDS line under BORO-AKALPUR Piped Water Supply Scheme under Rampurhat sub -Division, under Birbhum Division, PHE Dte. | 2.70 | BP-2024-25-201 | 29/08/2024 | VCH/000414/2024-2025 |
183 | Birbhum Division | BILL/00547/2024-2025 | 29/08/2024 | RAMPURHAT PARIBESH PARISEVA | ORD/000760/2023-2024 | 198/RSD | 28/03/2024 | Engagement of Lab Personals for the Rampurhat Paribesh Pariseva (period from 01.04.2024 to 30.09.2024). | 0.90 | BP-2024-25-212 | 02/09/2024 | VCH/000497/2024-2025 |
Total | 8,121.77 |