Sl. No. Division
Working Divisions
Bill Number Bill Date
Date of Issuance of the Work Order as per PHED-MIS
Vendor Name
Vendor Appointed Against this Work Order as per PHED-MIS
System Order Number
System generated Order No. for the Work Order as per PHED-MIS
Memo Number
Memo no. for Work Order Provided by the Divisions as per PHED-MIS
Order Date
Date of Issuance of the Work Order as per PHED-MIS
work_name
Name of the Work as per the Issued Work Order
Bill Gross Amount Voucher Number Voucher Date System Voucher Number
0 158.93  
1 Hooghly Division BILL/01048/2024-2025 29/11/2024 AMBIAN INFRASTRUCTURE ORD/000292/2024-2025 928/Chan 05/11/2024 Making of 2 nos 1.8m x 1.45m x 2.1m KIOSK at Khordaapurbapur 1st T/W site & Kamarkundu (Zone-1) 1st T/W site under Chandannagar Sub-Division PHE Dte. 0.93 01000214408 22/06/2026 VCH/002703/2024-2025
2 Hooghly Division BILL/01360/2024-2025 25/02/2025 BIMAL KUMAR HALDER ORD/000152/2023-2024 1566/HUG 29/05/2023 SINHAL Piped Water Supply Scheme with Sinking of tube-well, LDS, Rising Main, FHTC & construction of switch-room & boundary wall at Proposed TW site, under Chandannagar Sub-Division of Hooghly Division P.H.E Dte. Block Singur, District:- Hooghly [NEW SCHE 62.90 01000214384 22/06/2026 VCH/002705/2024-2025
3 Hooghly Division BILL/00359/2025-2026 25/06/2025 AYUSH ENTERPRISE ORD/000553/2023-2024 3182/HUG 30/10/2023 GOPALDAHA Piped Water Supply Scheme with Sinking of tube-well, LDS, Rising Main, FHTC & construction of switch-room & boundary wall at Proposed TW site under Arambagh Sub-Division of Hooghly Division P.H.E Dte. Block Arambagh, District:- Hooghly [NEW SCHE 47.24 01000214320 22/06/2026 VCH/003192/2025-2026
4 Hooghly Division BILL/01015/2024-2025 21/11/2024 KALPATARU ENTERPRISE ORD/000065/2024-2025 2506/HUG 03/07/2024 Sinking of Additional tubewell with Construction of switch-room & boundary wall, Laying Rising Main at Proposed TW site at kharda-apurbapur Water Supply Scheme under Chandannagar Sub-Division of Hooghly Division P.H.E Dte.Block Singur, District:- Hooghl 14.00 01000214392 22/06/2026 VCH/002704/2024-2025
5 Hooghly Division BILL/00132/2025-2026 08/05/2025 UNIQUE AGENCY ORD/000447/2024-2025 4084/HUG 19/12/2024 Repair and Renovation Works of R.C.C. Elevated Reservoir, Boundary Wall, Switch Room of GOURHATI PWSS under Arambagh Sub-Division of Hooghly Division, P.H.E. Dte. 11.23 01000239436 27/07/2026 VCH/003194/2025-2026
6 Hooghly Division BILL/00415/2025-2026 15/07/2025 TAPAS ADHYA ORD/000748/2023-2024 381/HUG 08/02/2024 Sinking of tube-well, Rising Main, construction of switch-room & boundary wall at Rajhat Uttar Proposed TW site, under Chinsurah Sub-Division of Hooghly Division P.H.E Dte. Block Polba-Dadpur, District:- Hooghly 11.20 01000236973 24/07/2026 VCH/003193/2025-2026
7 Hooghly Division BILL/00754/2026-2027 03/08/2026 SATYA NARAYAN BISWAS ORD/000180/2023-2024 1686/HUG 08/06/2023 KHORDAAPURBAPUR Piped Water Supply Scheme with Sinking of tube-well, LDS, Rising Main, FHTC & construction of switch-room & boundary wall at Proposed TW site, under Chandannagar Sub-Division of Hooghly Division P.H.E Dte. Block Singur, District:- Hooghly 11.43 01000258294 10/08/2026 VCH/000894/2026-2027
Total 158.93