| Sl. No. | Division
Working Divisions
|
Bill Number | Bill Date
Date of Issuance of the Work Order as per PHED-MIS
|
Vendor Name
Vendor Appointed Against this Work Order as per PHED-MIS
|
System Order Number
System generated Order No. for the Work Order as per PHED-MIS
|
Memo Number
Memo no. for Work Order Provided by the Divisions as per PHED-MIS
|
Order Date
Date of Issuance of the Work Order as per PHED-MIS
|
work_name
Name of the Work as per the Issued Work Order
|
Bill Gross Amount | Voucher Number | Voucher Date | System Voucher Number |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 0 | 766.28 | |||||||||||
| 1 | Howrah Division | BILL/00148/2025-2026 | 19/05/2025 | SAMIRON GHOSH | ORD/000030/2024-2025 | 2835/HD | 20/06/2024 | Additional Laying Distribution Pipeline & approach road with land development at OHR site & allied works of Panchla PWSS at Panchla Block of Howrah District under Howrah Sadar Sub-Division of Howrah Division, P.H.E. Dte. | 34.32 | 1000300258 | 12/10/2026 | VCH/000264/2026-2027 |
| 2 | Howrah Division | BILL/00765/2025-2026 | 12/09/2025 | REALIENCE CONSTRUCTION | ORD/000015/2023-2024 | 1595/HD | 12/04/2023 | Work Order for Construction of 2 (Two) Nos.Pump House (5.40m x 3.60m),Construction of Boundary Wall at Head work Site, Others site Boundary Wall, Construction of 200 cum Capacity, 20mtr. Staging Height RCC Elevated Reservoir As Per Departmental Type Desig | 34.94 | 1000300248 | 12/10/2026 | VCH/000277/2026-2027 |
| 3 | Howrah Division | BILL/00288/2025-2026 | 20/06/2025 | M/S AHAMED CONSTRUCTION | ORD/000007/2023-2024 | 1534/HD | 04/04/2023 | Work Order for Sinking of 1 (One) No. Tubewell (150mmx100mm), Construction of Switch Room (3750mmx3750mm) & Laying Distribution System for providing Functional House hold Tap Connection (FHTC) at Ghutegari Mini PWSS under Amta-I Block under Uluberia Sub- | 23.67 | 1000300250 | 12/10/2026 | VCH/000275/2026-2027 |
| 4 | Howrah Division | BILL/00865/2024-2025 | 10/12/2024 | JOY CHANDI CONSTRUCTION | ORD/000204/2024-2025 | 4514/HD | 04/10/2024 | Additional laying distribution pipeline with FHTC at Bagur & Paschim Bainan Mouza part of Paschim Bainan PWSS adjoining to Hizlak PWSS of Bagnan-I Block in Uluberia Sub-Division under Howrah Division, PHE Dte. | 48.54 | 1000300254 | 12/10/2026 | VCH/000273/2026-2027 |
| 5 | Howrah Division | BILL/00027/2025-2026 | 09/04/2025 | DULAL MAJUMDER | ORD/000365/2022-2023 | 460/AE/USD | 15/09/2022 | Preparation of DPR for Patinan PWSS, Bagnan-I Block under Uluberia Sub-division of Howrah Division P.H.E Dte. | 2.98 | 1000300247 | 12/10/2026 | VCH/000269/2026-2027 |
| 6 | Howrah Division | BILL/01238/2024-2025 | 26/03/2025 | PRADIP KUMAR JATI | ORD/000026/2023-2024 | 1691/HD | 20/04/2023 | Work Order for Laying Distribution System(HDPE & DI) & providing Functional Household Tap Connection (FHTC) & Construction of 300 cu.m. capacity 20 mtr staging height RCC Over Head Reservoir (Drawing No- PC I/O.H.R/7/2012)with necessary soil investigatio | 87.35 | 1000300251 | 12/10/2026 | VCH/000265/2026-2027 |
| 7 | Howrah Division | BILL/00355/2025-2026 | 17/07/2025 | SADHURHAT CO OPERATIVE LABOUR CONTRACT & CONSTRUCTION SOCIETY LTD. | ORD/000008/2023-2024 | 1553/HD | 05/04/2023 | Work Order for Laying Distribution System(HDPE & DI) & providing Functional Household Tap Connection (FHTC) & Interconnection between tube wells (Part-A) & Construction of Swtich Room with Sanitary and water Supply arrangement at Head Work Site and Const | 45.54 | 1000300252 | 12/10/2026 | VCH/000274/2026-2027 |
| 8 | Howrah Division | BILL/00053/2025-2026 | 23/04/2025 | MITHU BUILDERS | ORD/000130/2023-2024 | 2646/HD | 18/07/2023 | Sinking of 2 nos Tube Well, Laying Distribution System & Construction of 100 cum RCC OHR & Interconnection between Tubewells & OHR for SHIBGACHHIA PWSS OF AMTA-II BLOCK UNDER THE ULUBERIA SUB-DIVISION UNDER HOWRAH DIVISION, P.H.E. DTE | 83.97 | 1000300260 | 12/10/2026 | VCH/000268/2026-2027 |
| 9 | Howrah Division | BILL/00029/2025-2026 | 09/04/2025 | DULAL MAJUMDER | ORD/000366/2022-2023 | 461/AE/USD | 15/09/2022 | Preparation of DPR for Hijlok PWSS, Bagnan-I Block under Uluberia Sub-division of Howrah Division P.H.E Dte. | 2.97 | 1000300246 | 12/10/2026 | VCH/000266/2026-2027 |
| 10 | Howrah Division | BILL/00611/2025-2026 | 27/08/2025 | SUNANDA ENVIROMENTAL INTERNATIONAL PVT. LTD. | ORD/000546/2023-2024 | 799/HD | 20/02/2024 | Conceptualization, design, implementation of community sensitization / mobilization activities using various mediums on JJM, provision on legal provision damage or illegal connection of PWSS; safe handling & storage of safe water quality issues, water co | 30.51 | 100315961 | 13/10/2026 | VCH/000263/2026-2027 |
| 11 | Howrah Division | BILL/00764/2025-2026 | 12/09/2025 | REALIENCE CONSTRUCTION | ORD/000593/2023-2024 | 999/HD | 01/03/2024 | Additional Laying Distribution Pipe line for providing (FHTC), Land development and allied works of Shankhali PWSS at Panchla Block of Howrah Sadar Sub-Division under Howrah Division, P. H. E. Dte. | 6.10 | 1000300249 | 12/10/2026 | VCH/000270/2026-2027 |
| 12 | Howrah Division | BILL/01130/2024-2025 | 12/03/2025 | REALIENCE CONSTRUCTION | ORD/000015/2023-2024 | 1595/HD | 12/04/2023 | Work Order for Construction of 2 (Two) Nos.Pump House (5.40m x 3.60m),Construction of Boundary Wall at Head work Site, Others site Boundary Wall, Construction of 200 cum Capacity, 20mtr. Staging Height RCC Elevated Reservoir As Per Departmental Type Desig | 27.24 | 1000300255 | 12/10/2026 | VCH/000276/2026-2027 |
| 13 | Howrah Division | BILL/00890/2025-2026 | 09/10/2025 | MITHU BUILDERS | ORD/000130/2023-2024 | 2646/HD | 18/07/2023 | Sinking of 2 nos Tube Well, Laying Distribution System & Construction of 100 cum RCC OHR & Interconnection between Tubewells & OHR for SHIBGACHHIA PWSS OF AMTA-II BLOCK UNDER THE ULUBERIA SUB-DIVISION UNDER HOWRAH DIVISION, P.H.E. DTE | 14.56 | 1000300259 | 12/10/2026 | VCH/000272/2026-2027 |
| 14 | Howrah Division | BILL/01000/2024-2025 | 11/02/2025 | AQUATECH ENGINEER | ORD/000133/2024-2025 | 4034/HD | 17/09/2024 | Sinking of 2 (Two) Nos. 250 X 150 mm Dia and 230 m deep tubewell Drilling by Direct Rotary method with UPVC Pipes all complete at Hizlok Head Work Site and 2nd TW Site at Hizlok PWSS of Bagnan-I Block of Howrah District under Howrah Division, P.H.E. Dte. | 14.51 | 1000300253 | 12/10/2026 | VCH/000267/2026-2027 |
| 15 | Howrah Division | BILL/00261/2025-2026 | 13/06/2025 | SAMIRON GHOSH | ORD/000148/2023-2024 | 2866/HD | 08/08/2023 | Different Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, and Construction of different capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gate | 198.94 | 1000300257 | 12/10/2026 | VCH/000278/2026-2027 |
| 16 | Howrah Division | BILL/00958/2024-2025 | 21/01/2025 | SAMIRON GHOSH | ORD/000148/2023-2024 | 2866/HD | 08/08/2023 | Different Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, and Construction of different capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gate | 110.14 | 1000300256 | 12/10/2026 | VCH/000271/2026-2027 |
| Total | 766.28 | |||||||||||