1 |
Purulia Division |
BILL/01003/2024-2025 |
21/11/2024 |
RAKSHIT ENTERPRISE |
ORD/000010/2023-2024 |
538/PD |
12/04/2023 |
Laying of Loop Pipe Line for distribution System under command area Zone-I at different habitation For Providing Functional Household Tap Connection (FHTC) in connection under Jal Jeevan Mission (JJM and JAL SAPNA) of Manbazar II Block (part) Wat |
8.46 |
BP-2024-25-647 |
28/03/2025 |
VCH/001207/2024-2025 |
2 |
Purulia Division |
BILL/01103/2024-2025 |
26/12/2024 |
MAHARSHI BANERJEE |
ORD/000492/2024-2025 |
1707/PD |
05/09/2024 |
Laying of Distribution line and Road Crossing and Construction of Sluice valve Chamber and other allied works for Kashipur under Kalyathol & Palaskhola W/S Scheme in connection with FHTC connection under Jal Jeevan Mission (JJM) Programme of Raghunathpur |
5.16 |
BP-2024-25-637 |
28/03/2025 |
VCH/001217/2024-2025 |
3 |
Purulia Division |
BILL/01106/2024-2025 |
26/12/2024 |
ROY CONSTRUCTION |
ORD/000127/2024-2025 |
895/PD |
07/05/2024 |
Laying of DI rising main including bypass arrangement & other allied works & construction of boundary wall at Baghmundi WTP Site in Purulia Water Supply Scheme (Northern Sector) under Purulia Division, PHE Dte. |
5.79 |
BP-2024-25-648 |
28/03/2025 |
VCH/001206/2024-2025 |
4 |
Purulia Division |
BILL/01029/2024-2025 |
29/11/2024 |
TAPAN CHANDRA |
ORD/000461/2024-2025 |
1520/PD |
27/08/2024 |
Bypass arrangement of Old rising main pipe line (Old OHR site ) to new rising main pipe line and new rising main pipe line to new OHR Inlet and distribution pipe line connection with all allied works of Para Piped Water Supply Scheme of Raghunathpur Su |
6.59 |
BP-2024-25-638 |
28/03/2025 |
VCH/001216/2024-2025 |
5 |
Purulia Division |
BILL/01037/2024-2025 |
04/12/2024 |
SHAMBHU SEKHAR MAJHI |
ORD/004003/2023-2024 |
90/A/PR |
01/03/2024 |
Water sample collection charges by engagement of agency at Arsha block of Purulia District under Purulia Division P. H.E. Dte. ( For 3 months, April to June) |
0.23 |
BP-2024-25-624 |
28/03/2025 |
VCH/001225/2024-2025 |
6 |
Purulia Division |
BILL/01049/2024-2025 |
04/12/2024 |
SADHAN GORAIN |
ORD/000013/2023-2024 |
541/PD |
12/04/2023 |
Construction of meter room, panel room, undercut pump house & surface drain with other allied works at Balarampur_Zone-II (Berma) OHR site for Augmentation of Balarampur W/S Scheme under Purulia Sadar Sub-Division, under Purulia Division, PHE Dte. |
3.77 |
BP-2024-25-580 |
21/03/2025 |
VCH/001160/2024-2025 |
7 |
Purulia Division |
BILL/01002/2024-2025 |
21/11/2024 |
ASHOK KUMAR CHATTERJEE |
ORD/000015/2023-2024 |
544/PD |
12/04/2023 |
Construction of Boundary wall, RCC Pillar, gate, Barbed wire at Dubra Mouza, JL No.-79, Plot No.499 at OHR site under Dubra W/S Scheme of Raghunathpur Sub-Division under Purulia Division, P.H.E. Dte. |
6.40 |
BP-2024-25-669 |
28/03/2025 |
VCH/001234/2024-2025 |
8 |
Purulia Division |
BILL/01033/2024-2025 |
04/12/2024 |
NISHAN KUMAR DAS |
ORD/004015/2023-2024 |
101/A/PR |
01/03/2024 |
Water sample collection charges by engagement of agency at Raghunathpur-I block of Purulia District under Purulia Division P. H.E. Dte. ( For 3 months, April to June ) |
0.28 |
BP-2024-25-623 |
28/03/2025 |
VCH/001224/2024-2025 |
9 |
Purulia Division |
BILL/01034/2024-2025 |
04/12/2024 |
CHANDAN MONDAL |
ORD/004001/2023-2024 |
87/A/PR |
01/03/2024 |
Water sample collection charges by engagement of agency at Santuri block of Purulia District under Purulia Division P. H.E. Dte. ( For 3 months, April to June) |
0.14 |
BP-2024-25-621 |
28/03/2025 |
VCH/001222/2024-2025 |
10 |
Purulia Division |
BILL/01040/2024-2025 |
04/12/2024 |
TAPAN MAHATO |
ORD/004010/2023-2024 |
98/A/PR |
01/03/2024 |
Water sample collection charges by engagement of agency at Barabazar block of Purulia District under Purulia Division P. H.E. Dte. ( For 3 months, April to June) |
0.17 |
BP-2024-25-628 |
28/03/2025 |
VCH/001271/2024-2025 |
11 |
Purulia Division |
BILL/01042/2024-2025 |
04/12/2024 |
MILAN MAHATO |
ORD/004019/2023-2024 |
106/A/PR |
01/03/2024 |
Water sample collection charges by engagement of agency at Hura block of Purulia District under Purulia Division P. H.E. Dte. ( For 3 months, April to June) |
0.44 |
BP-2024-25-627 |
28/03/2025 |
VCH/001270/2024-2025 |
12 |
Purulia Division |
BILL/01047/2024-2025 |
04/12/2024 |
JOY GURU ENTERPRISE |
ORD/004766/2023-2024 |
174/RNP |
27/03/2024 |
Construction of 4 Nos. Sluice Valve Chamber at Setpalash & Cheliyama Bagdipara under Raghunathpur W/S Scheme (German Assisted) Zone-VIII of Raghunathpur Sub-Division under Purulia Division, PHE Dte. |
0.84 |
BP-2024-25-692 |
29/03/2025 |
VCH/001264/2024-2025 |
13 |
Purulia Division |
BILL/01056/2024-2025 |
06/12/2024 |
RABIN CHANDRA CHAIL |
ORD/000649/2024-2025 |
468/RNP |
26/09/2024 |
Bypass arrangement with allied works in between of over flow line to distribution main Kolaboni Zone-I OHR site under Kolaboni W/S Scheme of Raghunathpur Sub-Division under Purulia Division, PHE Dte. |
0.95 |
BP-2024-25-680 |
29/03/2025 |
VCH/001251/2024-2025 |
14 |
Purulia Division |
BILL/01094/2024-2025 |
19/12/2024 |
SHYAMAL KUMAR DEY |
ORD/000054/2023-2024 |
661/PD |
17/05/2023 |
Repairing and Renovation of R.C.C. Elevated Reservoir of capacity 180 Cum (Intze Type) including bypass arrangement & other allied works in connection with Jal Jeevan Mission (JJM) for Augmentation of Zone-I of Balarampur W/S Scheme of Purulia Sadar Sub_D |
6.81 |
BP-2024-25-676 |
29/03/2025 |
VCH/001247/2024-2025 |
15 |
Purulia Division |
BILL/01196/2024-2025 |
21/01/2025 |
M/S CHAKRABORTY CONSTRUCTION |
ORD/001075/2024-2025 |
2170/PD |
13/12/2024 |
Withdrawing and relaying of collecting line from river bed tubewel and inter connection between existing collecting line under Lagda W/S Scheme under Purulia Division, PHE Dte. |
2.87 |
BP-2024-25-629 |
27/03/2025 |
VCH/001272/2024-2025 |
16 |
Purulia Division |
BILL/00987/2024-2025 |
19/11/2024 |
CHOUDHURY STONE CRUSHING |
ORD/003531/2023-2024 |
356/PD |
04/03/2024 |
Construction of Boundary wall & Sinking of T/well at Purulia-II ,Zone-I under Purulia W/S Scheme under Purulia Sadar Sub Division under Purulia Division, PHE Dte. |
6.46 |
BP-2024-25-667 |
28/03/2025 |
VCH/001232/2024-2025 |
17 |
Purulia Division |
BILL/01041/2024-2025 |
04/12/2024 |
BABLU MAHATO |
ORD/004011/2023-2024 |
99/A/PR |
01/03/2024 |
Water sample collection charges by engagement of agency at Balarampur block of Purulia District under Purulia Division P. H.E. Dte. ( For 3 months, April to June) |
0.32 |
BP-2024-25-625 |
28/03/2025 |
VCH/001268/2024-2025 |
18 |
Purulia Division |
BILL/01072/2024-2025 |
13/12/2024 |
MANIK MAHATO |
ORD/001359/2023-2024 |
1728/PD |
04/12/2023 |
Construction of Switch Room Cum Chlorin Room at Zone-V-B (Nanduka) OHR Site of Raghunathpur W/S Scheme (German Project) within Raghunathpur Sub-Division under Purulia Division, PHE Dte. |
4.76 |
BP-2024-25-683 |
29/03/2025 |
VCH/001254/2024-2025 |
19 |
Purulia Division |
BILL/01207/2024-2025 |
21/01/2025 |
SANDIP KUMAR DUBEY |
ORD/000131/2024-2025 |
897/PD |
07/05/2024 |
Repairing of DI Rising Main, construction of RCC Clear water reservoir (CWR) of capacity 150 Cum, New Boundary wall (Lenth=62 mtr) and 01 No. Sinking of RBT Tubewell (200X165 mm dia) and other allied works at Zone-VIII OHR campus of Raghunathpur W/S Schem |
6.39 |
BP-2024-25-662 |
28/03/2025 |
VCH/001228/2024-2025 |
20 |
Purulia Division |
BILL/01236/2024-2025 |
11/02/2025 |
MITRA CONSTRUCTION |
ORD/000500/2023-2024 |
1332/PD |
08/09/2023 |
Repairing and Renovation of Boundary wall including other allied works at Kanchanpur boosting site in connection with Jal Jeevan Mission (JJM) at Kudagara under Purulia W/S Scheme (Northern Sector) of Purulia Sadar Sub_Division under Purulia Division PHE |
2.56 |
BP-2024-25-693 |
29/03/2025 |
VCH/001267/2024-2025 |
21 |
Purulia Division |
BILL/00981/2024-2025 |
19/11/2024 |
THE BUSINESS ENGINEERS INDIA |
ORD/000890/2022-2023 |
1872/PD |
13/12/2022 |
Water supply Tap Connection Arrangement for 12 nos AWC within SANTURI Block (Part-C) from newly sinked tubewell by mechanical division of Purulia District under Purulia Division, PHE Dte. |
5.07 |
BP-2024-25-666 |
28/03/2025 |
VCH/001231/2024-2025 |
22 |
Purulia Division |
BILL/01269/2024-2025 |
28/02/2025 |
ANUDIP SAHA |
ORD/000296/2023-2024 |
379/B/PR |
27/07/2023 |
Supply delivery fitting & fixing of sign board (ACP Sheet) at different solar tubewell site within Purulia District under RWS Purulia Sub-Division,Under Purulia Division PHE Dte. (Block:-Manbazar-I,Balarampur & Puncha) |
0.18 |
BP-2024-25-684 |
29/03/2025 |
VCH/001255/2024-2025 |
23 |
Purulia Division |
BILL/01035/2024-2025 |
04/12/2024 |
SANGRAM MUKHERJEE |
ORD/004017/2023-2024 |
104/A/PR |
01/03/2024 |
Water sample collection charges by engagement of agency at Raghunathpur-II block of Purulia District under Purulia Division P. H.E. Dte. ( For 3 months, April to June) |
0.15 |
BP-2024-25-632 |
28/03/2025 |
VCH/001275/2024-2025 |
24 |
Purulia Division |
BILL/01052/2024-2025 |
04/12/2024 |
AMIT CHOURASIA |
ORD/001373/2023-2024 |
1733/PD |
04/12/2023 |
Repairing of Boundary walls, Supplying and fitting of Mark -II Hand Pump along with concrete platform at the low yield Big Dia DTH Tubewell or Construction of concrete cover at the dry big dia DTH Tubewells sinked at various Schools & AWCs of . Jhalda |
2.79 |
BP-2024-25-670 |
28/03/2025 |
VCH/001235/2024-2025 |
25 |
Purulia Division |
BILL/01067/2024-2025 |
10/12/2024 |
HUSSAIN CONSTRUCTION |
ORD/000287/2023-2024 |
1146/PD |
17/08/2023 |
Construction of boundary wall at Zone VI H/W (OHR) site of Santuri block and sinking of 1 (one) no. Tubewell under surface Based Piped W/S Scheme Purulia Piped W/S Scheme (Northern Sector) under Raghunathpur Sub Division under Purulia Division PHE Dte.
|
11.11 |
BP-2024-25-671 |
28/03/2025 |
VCH/001281/2024-2025 |
26 |
Purulia Division |
BILL/01075/2024-2025 |
13/12/2024 |
UMWELT ENGINEER PRIVATE LIMITED |
ORD/000259/2021-2022 |
1541/PD |
15/12/2021 |
Installation of Stand-Alone Community Purification Plant (CPP) with provision of Tube Well, Solar Power Operated Pumping Machinery and Treatment Unit for removal of Fluoride in the left out Fluoride affected habitations as per IMIS Report (F-18 & C17C) 4 |
7.23 |
BP-2024-25-548 |
20/03/2025 |
VCH/001133/2024-2025 |
27 |
Purulia Division |
BILL/00949/2024-2025 |
06/11/2024 |
BISWAJIT MAJI |
ORD/003965/2023-2024 |
508/PD |
16/03/2024 |
Repairing and renovation of Boundary Wall with other allied work at Lakhanpur WTP under Raghunathpur Area (EAP) W/S Scheme of Raghunathpur Sub-Division under Purulia Division, PHE Dte. |
4.20 |
BP-2024-25-675 |
29/03/2025 |
VCH/001246/2024-2025 |
28 |
Purulia Division |
BILL/01005/2024-2025 |
21/11/2024 |
MS MITRA SENGUPTA ENTERPRISES |
ORD/000099/2022-2023 |
634/PD |
22/04/2022 |
Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM) and JAL SAPNA at different habitation and extention of distribution pipe line of Panradda (Zone-IV) W/S Scheme of Purulia Sadar Sub_Division under Purulia Di |
3.17 |
BP-2024-25-681 |
29/03/2025 |
VCH/001252/2024-2025 |
29 |
Purulia Division |
BILL/01143/2024-2025 |
13/01/2025 |
M/S CHAKRABORTY CONSTRUCTION |
ORD/001062/2024-2025 |
2123/PD |
05/12/2024 |
Interconnection of new & old DI rising main with new pump house & other allied works for direct supply & pathway of Lagda Water Supply Scheme under Purulia Division, PHE Dte. |
9.18 |
BP-2024-25-644 |
28/03/2025 |
VCH/001210/2024-2025 |
30 |
Purulia Division |
BILL/01028/2024-2025 |
29/11/2024 |
SABYASACHI MISHRA |
ORD/001089/2022-2023 |
369/PD |
14/03/2023 |
Construction of Chlorine cum Switch Room & Guard Room with sanitary and plumbing arrangment with approach road, plinth protection, surface drain etc. complete at Kotshila OHR Site for Augmentation of Kotshila W/S Scheme under Purulia Sadar Sub-Division, |
3.87 |
BP-2024-25-668 |
28/03/2025 |
VCH/001233/2024-2025 |
31 |
Purulia Division |
BILL/01039/2024-2025 |
04/12/2024 |
UMESH KUMAR MAHATO |
ORD/004022/2023-2024 |
89/A/PR |
01/03/2024 |
Water sample collection charges by engagement of agency at Jhalda-I block of Purulia District under Purulia Division P. H.E. Dte. ( For 3 months, April to June) |
0.15 |
BP-2024-25-619 |
27/03/2025 |
VCH/001220/2024-2025 |
32 |
Purulia Division |
BILL/01044/2024-2025 |
04/12/2024 |
UMWELT ENGINEER PRIVATE LIMITED |
ORD/000260/2021-2022 |
1542/PD |
15/12/2021 |
Installation of Stand-Alone Community Purification Plant (CPP) with provision of Tube Well, Solar Power Operated Pumping Machinery and Treatment Unit for removal of Fluoride in the left out Fluoride affected habitations as per IMIS Report (F-18 & C17C) 4 |
7.23 |
BP-2024-25-546 |
20/03/2025 |
VCH/001131/2024-2025 |
33 |
Purulia Division |
BILL/01048/2024-2025 |
04/12/2024 |
M/S SAWDESH ENTERPRISE |
ORD/001060/2022-2023 |
292/PD |
27/02/2023 |
Laying of Parallel Distribution Pipeline at Banahatu Mouza of Kotshila Water Supply Scheme under Purulia Division, PHE Dte |
5.96 |
BP-2024-25-642 |
28/03/2025 |
VCH/001212/2024-2025 |
34 |
Purulia Division |
BILL/01063/2024-2025 |
10/12/2024 |
SUBHAS CHANDRA MAHATO |
ORD/003510/2023-2024 |
347/PD |
04/03/2024 |
Construction of Meter Room at Pump House Site (Kaduri) of Rangamati W/S Scheme within Raghunathpur Sub-Division under Purulia Division, PHE Dte. (Under Kashipur Water Supply Scheme) |
1.91 |
BP-2024-25-633 |
28/03/2025 |
VCH/001276/2024-2025 |
35 |
Purulia Division |
BILL/01077/2024-2025 |
13/12/2024 |
KM ENTERPRISES |
ORD/000899/2023-2024 |
1567/PD |
26/10/2023 |
Construction and Commissioning of RCC Over Head Reservoir (Torch type with solid raft) of capacity 150 CUM and staging height 20 mtr as per approved drawing (No: PC-I/OHR/3/2012) including Laying Distribution Pipe Lines and providing FHTCs including other |
6.07 |
BP-2024-25-586 |
22/03/2025 |
VCH/001162/2024-2025 |
36 |
Purulia Division |
BILL/01204/2024-2025 |
21/01/2025 |
SUNANDA ENVIROMENTAL INTERNATIONAL PVT. LTD. |
ORD/000290/2024-2025 |
1215A/PD |
28/06/2024 |
Operation charges water testing 6nos. laboratoris at Balarampur,Bundwan, WTP Sub-District water testing Laboratory &Hura, Jhalda-I, Kashipur, Baghmundi Sub District Water testing laboratory under RWS purulia Sub-Division PHE Dte.(w.e.f.01.07.2024 to 30.06 |
10.46 |
BP-2024-25-696 |
29/03/2025 |
VCH/001259/2024-2025 |
37 |
Purulia Division |
BILL/00983/2024-2025 |
19/11/2024 |
MAHARSHI BANERJEE |
ORD/000478/2024-2025 |
1499/PD |
27/08/2024 |
Construction of shed and other works at Manbhum Paridarshan Abas Campus under Marble Lake W/S Scheme Purulia Division, PHE Dte. |
5.41 |
BP-2024-25-677 |
29/03/2025 |
VCH/001248/2024-2025 |
38 |
Purulia Division |
BILL/00999/2024-2025 |
21/11/2024 |
ASHOKE ADHIKARY |
ORD/000255/2023-2024 |
1070/PD |
08/08/2023 |
Laying Distribution Pipe line and providing Functional Household Tap Connection (FHTC), including other allied work for Zone - VII of Santuri Block under Purulia Pipe Water Supply Scheme (Northern Sector) Under Purulia Division ,PHE Dte. [Part -D, Mouza - |
3.95 |
BP-2024-25-634 |
27/03/2025 |
VCH/001277/2024-2025 |
39 |
Purulia Division |
BILL/01097/2024-2025 |
23/12/2024 |
MOHOR CONSTRUCTION |
ORD/003452/2023-2024 |
328/PD |
02/03/2024 |
Construction of Guard Room with sanitary and plumbing arrangment with approach road, plinth protection, surface drain etc. complete at Balarampur Zone-II OHR Site for Augmentation of Balarampur W/S Scheme under Purulia Sadar Sub-Division, under Purulia |
5.21 |
BP-2024-25-663 |
28/03/2025 |
VCH/001229/2024-2025 |
40 |
Purulia Division |
BILL/01107/2024-2025 |
26/12/2024 |
M/S KALYANI ENTERPRISE |
ORD/001828/2023-2024 |
66/PD |
10/01/2024 |
Construction of Boundary wall, RCC Pillar, gate, Barbed wire & Sinking of 2(Two) nos tubewellat OHR Sites of Zone- XI & XII of Hura Block under Surface Water Based Piped Water Supply Scheme for Purulia District (Northern Sector) of Raghunathpur Sub-Divisi |
7.67 |
BP-2024-25-556 |
20/03/2025 |
VCH/001140/2024-2025 |
41 |
Purulia Division |
BILL/01121/2024-2025 |
06/01/2025 |
ASHOKE ADHIKARY |
ORD/004345/2023-2024 |
662_PD |
17/05/2023 |
Construction of meter room, panel room, undercut pump house & surface drain with other allied works at Puncha OHR Site (Bahadurpur) for Augmentation of Lagda W/S Scheme under Purulia Sadar Sub-Division, under Purulia Division, PHE Dte. |
5.07 |
BP-2024-25-664 |
28/03/2025 |
VCH/001230/2024-2025 |
42 |
Purulia Division |
BILL/01267/2024-2025 |
28/02/2025 |
ESSAR CONSTRUCTION |
ORD/001383/2023-2024 |
1738/PD |
04/12/2023 |
Repairing of Boundary walls, Supplying and fitting of Mark -II Hand Pump along with concrete platform at the low yield Big Dia DTH Tubewell or Construction of concrete cover at the dry big dia DTH Tubewellssinked at various Schools & AWCs of . Puncha& |
6.00 |
BP-2024-25-672 |
28/03/2025 |
VCH/001237/2024-2025 |
43 |
Purulia Division |
BILL/01036/2024-2025 |
04/12/2024 |
ROHIT BANERJEE |
ORD/004016/2023-2024 |
103/A/PR |
01/03/2024 |
Water sample collection charges by engagement of agency at Para block of Purulia District under Purulia Division P. H.E. Dte. ( For 3 months, April to June) |
0.12 |
BP-2024-25-620 |
27/03/2025 |
VCH/001221/2024-2025 |
44 |
Purulia Division |
BILL/01206/2024-2025 |
21/01/2025 |
ASHOK KUMAR CHATTERJEE |
ORD/000015/2023-2024 |
544/PD |
12/04/2023 |
Construction of Boundary wall, RCC Pillar, gate, Barbed wire at Dubra Mouza, JL No.-79, Plot No.499 at OHR site under Dubra W/S Scheme of Raghunathpur Sub-Division under Purulia Division, P.H.E. Dte. |
4.98 |
BP-2024-25-631 |
27/03/2025 |
VCH/001273/2024-2025 |
45 |
Purulia Division |
BILL/00955/2024-2025 |
06/11/2024 |
PREMNATH MITRA |
ORD/000216/2021-2022 |
1422/PD |
25/11/2021 |
Installation of Stand-Alone Community Purification Plant (CPP) with provision of Tube Well, Solar Power Operated Pumping Machinery and Treatment Unit for removal of Fluoride in the left out Fluoride affected habitations as per IMIS Report (F-18 & C17C) 3 |
10.15 |
BP-2024-25-640 |
28/03/2025 |
VCH/001214/2024-2025 |
46 |
Purulia Division |
BILL/00986/2024-2025 |
19/11/2024 |
RAHIBUDDIN MONDAL |
ORD/004026/2023-2024 |
490/PD |
16/03/2024 |
Laying Distribution Pipe line and providing FHTC including other allied works for Purulia Piped Water Supply Scheme (Northern Sector )at Purulia-I Block(Zone-II) For Bhalumara Mouza under Purulia Division. PHE Dte. |
6.14 |
BP-2024-25-661 |
28/03/2025 |
VCH/001227/2024-2025 |
47 |
Purulia Division |
BILL/01105/2024-2025 |
26/12/2024 |
MOONLIGHT HOUSE |
ORD/000219/2024-2025 |
1093/PD |
07/06/2024 |
Providing Left Out & Parallal distribution pipe line including Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SAPNA) at different habitation of Mouza-Chitahi (JL-105) & Mouza- Ghaghri (JL-106) under command |
3.68 |
BP-2024-25-646 |
28/03/2025 |
VCH/001208/2024-2025 |
48 |
Purulia Division |
BILL/01065/2024-2025 |
10/12/2024 |
BHAGABAN DAS KUMAR |
ORD/000445/2024-2025 |
1507/PD |
27/08/2024 |
Left out laying of Distribution Pipe Line for distribution System at Chatambari Mouza under command area of Jhalda Rural W/S Scheme Under Purulia W/S Scheme (Southern Sector) of Purulia Sadar Sub-Division under Purulia Division, PHE Dte. |
2.73 |
BP-2024-25-636 |
28/03/2025 |
VCH/001218/2024-2025 |
49 |
Purulia Division |
BILL/01197/2024-2025 |
21/01/2025 |
SOMNATH SINGH |
ORD/000405/2024-2025 |
180/RNP |
04/04/2024 |
Laying of GI pipe line from Raghunathpur office campus CWR to SD Hospital CWR and other allied works under Raghunathpur W/S Scheme (Zone-IV) (German Assisted) of Raghunathpur Sub-Division under Purulia Division, PHE Dte. |
0.94 |
BP-2024-25-691 |
29/03/2025 |
VCH/001263/2024-2025 |
50 |
Purulia Division |
BILL/00950/2024-2025 |
06/11/2024 |
JAYANTA KUMAR MONDAL |
ORD/000212/2024-2025 |
1080/PD |
07/06/2024 |
Crossing of PWD Road and laying of additional HDPE pipe line(75mm & 63mm) with allied work (Zone-I) under Sarbari W/S Scheme within Raghunathpur Sub-Division under Purulia Division,PHEDte. |
18.76 |
BP-2024-25-575 |
21/03/2025 |
VCH/001156/2024-2025 |
51 |
Purulia Division |
BILL/00990/2024-2025 |
21/11/2024 |
DEBASISH CHAKRABORTY |
ORD/000103/2022-2023 |
638/PD |
22/04/2022 |
Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM) and JAL SAPNA at different habitation and extention of distribution pipe line of Panradda (Zone-VI) W/S Scheme of Purulia Sadar Sub_Division under Purulia Di |
8.02 |
BP-2024-25-635 |
28/03/2025 |
VCH/001278/2024-2025 |
52 |
Purulia Division |
BILL/01117/2024-2025 |
06/01/2025 |
VIVEKANANDA CONSTRUCTION |
ORD/003465/2023-2024 |
334/PD |
01/03/2024 |
Construction of Boundary wall & Sinking of T/well at Jhalda-II,Zone-VII under Purulia W/S Scheme under Purulia Sadar Sub Division under Purulia Division, PHE Dte. |
5.08 |
BP-2024-25-658 |
28/03/2025 |
VCH/001279/2024-2025 |
53 |
Purulia Division |
BILL/01306/2024-2025 |
10/03/2025 |
PRAKASH DESHMUKH |
ORD/001380/2023-2024 |
1736/PD |
04/12/2023 |
Repairing of Boundary walls, Supplying and fitting of Mark -II Hand Pump along with concrete platform at the low yield Big Dia DTH Tubewell or Construction of concrete cover at the dry big dia DTH Tubewells sinked at various Schools & AWCs of . Bundwan |
4.66 |
BP-2024-25-685 |
29/03/2025 |
VCH/001256/2024-2025 |
54 |
Purulia Division |
BILL/01032/2024-2025 |
04/12/2024 |
PRADIP MAHATO |
ORD/004002/2023-2024 |
88/A/PR |
01/03/2024 |
Water sample collection charges by engagement of agency at Jhalda-II block of Purulia District under Purulia Division P. H.E. Dte. ( For 3 months, April to june) |
0.15 |
BP-2024-25-622 |
28/03/2025 |
VCH/001223/2024-2025 |
55 |
Purulia Division |
BILL/01038/2024-2025 |
04/12/2024 |
DIPAK MANDAL |
ORD/004000/2023-2024 |
86/A/PR |
01/03/2024 |
Water sample collection charges by engagement of agency at Neturia block of Purulia District under Purulia Division P. H.E. Dte. ( For 3 months April to June) |
0.15 |
BP-2024-25-618 |
27/03/2025 |
VCH/001219/2024-2025 |
56 |
Purulia Division |
BILL/01043/2024-2025 |
04/12/2024 |
BIJAY GORAIN |
ORD/004020/2023-2024 |
107/A/PR |
01/03/2024 |
Water sample collection charges by engagement of agency at Joypur block of Purulia District under Purulia Division P. H.E. Dte. ( For 3 months, April to June) |
0.36 |
BP-2024-25-626 |
28/03/2025 |
VCH/001269/2024-2025 |
57 |
Purulia Division |
BILL/01045/2024-2025 |
04/12/2024 |
SUBHAS CHANDRA MAHATO |
ORD/001825/2023-2024 |
63/PD |
10/01/2024 |
Construction of Boundary wall, RCC Pillar, gate, Barbed wire & Sinking of 2(Two) nos tubewellat OHR Sites of Zone - V & VI of Hura Block under Surface Water Based Piped Water Supply Scheme for Purulia District (Northern Sector) of Raghunathpur Sub-Divisi |
11.12 |
BP-2024-25-643 |
28/03/2025 |
VCH/001211/2024-2025 |
58 |
Purulia Division |
BILL/01064/2024-2025 |
10/12/2024 |
PRADIPTA CHOUDHURY |
ORD/000027/2023-2024 |
568/PD |
18/04/2023 |
Laying of parallel distribution pipeline (additional length) for providing Functional Household Tap Connection (FHTC) in connection with jal jeevan Mission (JJM) at Burudih Village under command area of panradda (Zone-IV) W/S Scheme of Balarampur Block un |
2.42 |
BP-2024-25-641 |
28/03/2025 |
VCH/001213/2024-2025 |
59 |
Purulia Division |
BILL/01074/2024-2025 |
13/12/2024 |
UTTAM KUMAR MAHATO |
ORD/004008/2023-2024 |
96/A/PR |
01/03/2024 |
Water sample collection charges by engagement of agency at Manbazar-I block of Purulia District under Purulia Division P. H.E. Dte. ( For 3 months, April to June) |
0.39 |
BP-2024-25-688 |
29/03/2025 |
VCH/001260/2024-2025 |
60 |
Purulia Division |
BILL/01209/2024-2025 |
22/01/2025 |
GAJA ENGINEERING PRIVATE LIMITED |
ORD/000897/2023-2024 |
1563/PD |
26/10/2023 |
Design, Surveying, Engineering, Supplying, Construction, Erection, Installation, Testing And Commissioning Of Fixed Type Intake Jetty With Pump House, Construction Of Subs Stations; Raw Water Rising Main, Bank Protection, 158 MLD (Minimum) Capacity Water |
678.62 |
BP-2024-25-583 |
21/03/2025 |
VCH/001176/2024-2025 |
61 |
Purulia Division |
BILL/01238/2024-2025 |
11/02/2025 |
CONCORD ENGINEERING |
ORD/000192/2021-2022 |
1181/PD |
22/09/2021 |
Installation of Stand-Alone Community Purification Plant (CPP) with provision of Tube Well, Solar Power Operated Pumping Machinery and Treatment Unit for removal of Fluoride in the left out Fluoride affected habitations as per IMIS Report (F-18 & C17C) 4 |
10.78 |
BP-2024-25-630 |
27/03/2025 |
VCH/001274/2024-2025 |