| Sl. No. | Division
Working Divisions
|
Bill Number | Bill Date
Date of Issuance of the Work Order as per PHED-MIS
|
Vendor Name
Vendor Appointed Against this Work Order as per PHED-MIS
|
System Order Number
System generated Order No. for the Work Order as per PHED-MIS
|
Memo Number
Memo no. for Work Order Provided by the Divisions as per PHED-MIS
|
Order Date
Date of Issuance of the Work Order as per PHED-MIS
|
work_name
Name of the Work as per the Issued Work Order
|
Bill Gross Amount | Voucher Number | Voucher Date | System Voucher Number |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 0 | 1,305.49 | |||||||||||
| 1 | Durgapur W/S Division | BILL/00267/2024-2025 | 08/01/2025 | SAIKAT RAY | ORD/000141/2024-2025 | 1291/DWSD | 06/09/2024 | Formal Work Order for Additional work for laying 200 mm dia HDPE pipe line and other necessary allied works Amarpur & Bhedia Piped W/S Scheme, Block- Aushgram-2, Dist- Purba Bardhaman under Durgapur W/S Division, PHE Dte. | 149.53 | BP-2026-27-15 | 09/10/2026 | VCH/000114/2026-2027 |
| 2 | Durgapur W/S Division | BILL/00214/2024-2025 | 28/11/2024 | SAIKAT RAY | ORD/000099/2024-2025 | 1012/DWSD | 16/07/2024 | Acceptance cum Formal Work Order for Balance works of 160 mm dia HDPE rising main at JOYRAMPUR area and etc. allied works at SUATA of Ausgram -II Block of SUATA W/S Scheme (JJM) under Durgapur Water Supply Division, PHE Dte. | 67.74 | BP-2026-27-21 | 10/10/2026 | VCH/000120/2026-2027 |
| 3 | Durgapur W/S Division | BILL/00253/2024-2025 | 24/12/2024 | SAIKAT RAY | ORD/000144/2024-2025 | 1348/DWSD | 20/09/2024 | Continution Work Order for Repairing and Renovation of Existing Room for prepair of Laboratory Room and Store Room , Boundary Wall with Gate, side drain with necessary allied works at Galsi-II Head Works site under Jadabganj Pipe Water Supply Scheme (JJM) | 17.50 | BP-2026-27-18 | 10/10/2026 | VCH/000117/2026-2027 |
| 4 | Durgapur W/S Division | BILL/00300/2024-2025 | 06/02/2025 | MANASH GHOSH | ORD/000179/2024-2025 | 1573/DWSD | 21/11/2024 | Formal Work Order for Balance works related sinking of tubewells at GANGARAMPUR village, LDS with Jack Pushing, Rising Main Construction Switchroom and FHTC of DIGHA PWSS of Ausgram-I Block, under Durgapur W/S Division, PHE Dte. | 166.73 | BP-2026-27-14 | 09/10/2026 | VCH/000113/2026-2027 |
| 5 | Durgapur W/S Division | BILL/00242/2024-2025 | 19/12/2024 | M/S PIONEER CONSTRUCTION | ORD/000484/2023-2024 | 3504/BWD | 10/08/2023 | BAKSIBAD POGRAM Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 600 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gat | 209.77 | BP-2026-27-26 | 10/10/2026 | VCH/000125/2026-2027 |
| 6 | Durgapur W/S Division | BILL/00337/2024-2025 | 11/03/2025 | SAIKAT RAY | ORD/000222/2024-2025 | 1658/DWSD | 29/11/2024 | Continution Work Order for Demarcation of new land of PHE site under various places (Jadabganj PWSS) under Durgapur W/S Division, PHE Dte. | 28.34 | BP-2026-27-20 | 10/10/2026 | VCH/000119/2026-2027 |
| 7 | Durgapur W/S Division | BILL/00169/2025-2026 | 23/06/2025 | SAIKAT RAY | ORD/000125/2024-2025 | 1113/DWSD | 02/08/2024 | Acceptance cum Formal Work Order for Repairing and Renovation of Existing Room for prepair of Laboratory Room and Store Room , Boundary Wall with Gate, side drain with necessary allied works at Galsi-II Head Works site under Jadabganj Pipe Water Supply Sc | 25.53 | BP-2026-27-25 | 10/10/2026 | VCH/000124/2026-2027 |
| 8 | Durgapur W/S Division | BILL/00170/2026-2027 | 30/09/2026 | MD.HASIN | ORD/000220/2024-2025 | 41/DWSD | 08/01/2025 | FORMAL WORK ORDER FOR MOHANPUR Piped Water Supply Scheme with Inter-connection, LDS, FHTC ,Road restoration & construction of switch rooms & boundary walls with gates, land development with road at TW site under Galsi-II Block, Dis | 21.00 | BP-2026-27-33 | 10/10/2026 | VCH/000132/2026-2027 |
| 9 | Durgapur W/S Division | BILL/00535/2025-2026 | 18/02/2026 | SAIKAT RAY | ORD/000044/2025-2026 | 855/DWSD | 29/05/2025 | Continution Work Order for Demarcation of new land of PHE site under various places (Jadabganj PWSS) under Durgapur W/S Division, PHE Dte. | 28.57 | BP-2026-27-19 | 10/10/2026 | VCH/000118/2026-2027 |
| 10 | Durgapur W/S Division | BILL/00382/2024-2025 | 21/03/2025 | MANASH GHOSH | ORD/000163/2024-2025 | 1521/DWSD | 11/11/2024 | Formal Work Order for Additional work of Soil investigation & construction of CWR/Pump House etc, Land development of H/W Site,drain & internal Path Way, Concrete Road Restoration,FHTC with Platform with necessary allied Works of Sub Surface Based PURANGA | 382.19 | BP-2026-27-30 | 10/10/2026 | VCH/000129/2026-2027 |
| 11 | Durgapur W/S Division | BILL/00403/2024-2025 | 25/03/2025 | THREE MAA ENTERPRISE | ORD/000188/2023-2024 | 2677/BWD | 08/06/2023 | BARADOBA Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under AUSHGRAM-II Block, District:- Purba- | 5.62 | 01000237004 | 11/08/2026 | VCH/000095/2026-2027 |
| 12 | Durgapur W/S Division | BILL/00129/2026-2027 | 18/08/2026 | ONKAR ENTERPRISE | ORD/000392/2023-2024 | 3218/BWD | 25/07/2023 | Sinking of Tube-wells, LDS, Rising Main, FHTC, Construction of 200 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation, construction of switch rooms, boundary walls with gates, land development, internal drains and inter | 68.43 | 01000269266 | 24/08/2026 | VCH/000097/2026-2027 |
| 13 | Durgapur W/S Division | BILL/00201/2024-2025 | 22/11/2024 | SAIKAT RAY | ORD/000143/2024-2025 | 1312/DWSD | 12/09/2024 | Continution Work Order for Demarcation of new land of PHE site under various places (Jadabganj PWSS) under Durgapur W/S Division, PHE Dte. | 28.57 | BP-2026-27-17 | 10/10/2026 | VCH/000116/2026-2027 |
| 14 | Durgapur W/S Division | BILL/00217/2024-2025 | 29/11/2024 | SAIKAT RAY | ORD/000001/2024-2025 | 768/DWSD | 06/06/2024 | Acceptance cum Formal Work Order for the work of " Balance work for sinking of 250 x 150mm dia T/W, P/H, Boundary wall, DI RM and LLDS for proposed 3rd T/W and other allied works under Sauta PWSS, Block- Aushgram-II, Dist-Purba Bardhaman under Durgapur W/ | 38.49 | BP-2026-27-24 | 10/10/2026 | VCH/000123/2026-2027 |
| 15 | Durgapur W/S Division | BILL/00318/2024-2025 | 27/02/2025 | SAIKAT RAY | ORD/000181/2024-2025 | 1618/DWSD | 26/11/2024 | Acceptance cum Formal Work Order for Balance Work for Suata PWSS with LDS,FHTC Under Ausgram- II Block, Diastrict- Purba Bardhaman under Durgapur W/S Division, PHE Dte. | 27.99 | BP-2026-27-22 | 10/10/2026 | VCH/000121/2026-2027 |
| 16 | Durgapur W/S Division | BILL/00133/2025-2026 | 23/05/2025 | A K SIKDAR | ORD/000183/2024-2025 | 1620/DWSD | 26/11/2024 | Acceptance cum Formal Work Order for SATINANDI Piped Water Supply Scheme with INSTALLATION OF BARBED WIRE, FHTC ,Road restoration ,DEMOLITION WORK & land development with road at TW site under Galsi-II Block, District:- Purba-Bardhaman under | 7.24 | BP-2026-27-2 | 09/10/2026 | VCH/000101/2026-2027 |
| 17 | Durgapur W/S Division | BILL/00163/2025-2026 | 23/06/2025 | GHOSH & ROY ENTERPRISE | ORD/000172/2024-2025 | 1614/DWSD | 26/11/2024 | Acceptance cum Formal Work Order for Sinking of 300 X 200mm dia Tube Well,Pump House , Boundary Wall , Concrete Road & Bituminous Road Restoration,Jack Pushing with Laying of M.S Pipe, FHTC , Land development of H/W Site,drain & internal Path | 12.04 | BP-2026-27-10 | 09/10/2026 | VCH/000109/2026-2027 |
| 18 | Durgapur W/S Division | BILL/00538/2025-2026 | 19/02/2026 | SAIKAT RAY | ORD/000144/2024-2025 | 1348/DWSD | 20/09/2024 | Continution Work Order for Repairing and Renovation of Existing Room for prepair of Laboratory Room and Store Room , Boundary Wall with Gate, side drain with necessary allied works at Galsi-II Head Works site under Jadabganj Pipe Water Supply Scheme (JJM) | 6.04 | BP-2026-27-23 | 10/10/2026 | VCH/000122/2026-2027 |
| 19 | Durgapur W/S Division | BILL/00105/2026-2027 | 04/08/2026 | SAIKAT RAY | ORD/000173/2024-2025 | 1619/DWSD | 26/11/2024 | Acceptance cum Formal Work Order for BARADOBA Piped Water Supply Scheme with FHTC ,Road restoration under AUSGRAM-II Block, District:- Purba-Bardhaman under Durgapur W/S Division, PHE Dte | 14.15 | 01000259165 | 21/08/2026 | VCH/000096/2026-2027 |
| Total | 1,305.49 | |||||||||||