| Sl. No. | Division
Working Divisions
|
Bill Number | Bill Date
Date of Issuance of the Work Order as per PHED-MIS
|
Vendor Name
Vendor Appointed Against this Work Order as per PHED-MIS
|
System Order Number
System generated Order No. for the Work Order as per PHED-MIS
|
Memo Number
Memo no. for Work Order Provided by the Divisions as per PHED-MIS
|
Order Date
Date of Issuance of the Work Order as per PHED-MIS
|
work_name
Name of the Work as per the Issued Work Order
|
Bill Gross Amount | Voucher Number | Voucher Date | System Voucher Number |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 0 | 576.39 | |||||||||||
| 1 | Nadia Arsenic Division I | BILL/00132/2025-2026 | 24/06/2025 | SATYABRATA CHAKRABORTY | ORD/000230/2023-2024 | 2299/NAD-I | 29/09/2023 | Renovation of I E P (225m3/hr.) at Duttaphulia Zone II W/S Scheme under Nadia Arsenic Division - I , PHE Dte. | 17.38 | 06178/JJM2 | 10/10/2026 | VCH/000365/2026-2027 |
| 2 | Nadia Arsenic Division I | BILL/00099/2025-2026 | 02/06/2025 | M/S DIPAK ENTERPRISE | ORD/000139/2024-2025 | 2005/NAD-I | 29/11/2024 | "Augmentation of pipeline damaged due to construction of drain including new pipeline and FHTC connection at Sundalpur Char, Paschim Noapara, Sahebdanga, Paschim Noapara villages under Paschim Noapara PWSS and Gosaichar village under Gosaichar Water Suppl | 24.57 | 01000304101 | 09/10/2026 | VCH/000386/2026-2027 |
| 3 | Nadia Arsenic Division I | BILL/00085/2025-2026 | 26/05/2025 | GHOSH ENTERPRISE | ORD/000014/2025-2026 | 130/NAD-I | 22/04/2025 | Repair of different types road under Majhergram, Kamalpur GP Duttaphulia GP, Nokari GP Jugolkisore GP, Arranaghata GP Bahirgachi GP under Raynagar W/S under Nadia Arsenic Division-I, PHE Dte. (Sl. No. 04) | 29.49 | 01000304263 | 09/10/2026 | VCH/000382/2026-2027 |
| 4 | Nadia Arsenic Division I | BILL/00032/2025-2026 | 28/04/2025 | M/S DIPAK ENTERPRISE | ORD/000135/2024-2025 | 1966/NAD-I | 28/11/2024 | Dedicated pipeline towards Durgapur Mouza and adjacent areas including allied works for Birnagar PWSS at Ranaghat-I Block of Ground Water Based PWSS for Birnagar W/S Scheme under Nadia Arsenic Division-I, P.H.E. Dte. (Sl.No. 01) | 82.96 | 01000304213/B | 09/10/2026 | VCH/000381/2026-2027 |
| 5 | Nadia Arsenic Division I | BILL/00409/2024-2025 | 18/12/2024 | EXECUTIVE ENGINEER, NADIA HIGHWAY DIVISION NO.-II, PW (ROADS) DIRECTORATE. | null | 536/R-186 | 05/08/2024 | Duttaphulia-Aranghata Road from CH. 40.00 Km. to CH. 44.766 Km. Restoration estimate due to the cause of excavations for underground Water Supply pipeline layout Proposal of PHE along the R/S of Quality Control sub-Division-I, under Nadia Highway Division | 88.20 | 01000300944 | 09/10/2026 | VCH/000379/2026-2027 |
| 6 | Nadia Arsenic Division I | BILL/00022/2025-2026 | 03/04/2025 | TAPU SAHA | ORD/000209/2023-2024 | 2292/NAD-I | 27/09/2023 | "Providing Laying of Rising Main ,Laying distribution system and FHTC Soil investigation for the work of construction of 200 cum OHR staging heigjt 20 mtr , Construction of 200 cum capacity 20 mtr . staging hieght RCC Over Head Reservoir (including pil | 140.74 | 01000303390 | 09/10/2026 | VCH/000384/2026-2027 |
| 7 | Nadia Arsenic Division I | BILL/00001/2025-2026 | 03/04/2025 | M/S MALLICK ENTERPRISE | ORD/000093/2023-2024 | 1741/NAD-I | 19/07/2023 | Providing FHTC including supplying, laying, fitting, fixing of 15mm NB PVC (schedule 80)20mm OD HDPE (PE100, PN16) pipe with all necessary specials, 10mm gun metal ferrule, saddle piece etc. all complete with Rising Main System including specials & Valves | 78.31 | 01000304213/A | 09/10/2026 | VCH/000380/2026-2027 |
| 8 | Nadia Arsenic Division I | BILL/00314/2025-2026 | 11/09/2025 | S B CONSTRUCTION | ORD/000008/2025-2026 | 75/NAD-I | 16/04/2025 | Work for revamping / upgradation of the hydraulic parameters of distribution network in reference to Raynagar and Joypur W/S Scheme under Nadia Arsenic Division-I,P.H.E. Dte as a part of Jal Jeevan Mission. (Sl. No. 01) | 41.31 | 01000304260 | 09/10/2026 | VCH/000383/2026-2027 |
| 9 | Nadia Arsenic Division I | BILL/00020/2025-2026 | 03/04/2025 | SANJOY BAKSHI | ORD/000217/2023-2024 | 2370/NAD-I | 06/10/2023 | Providing, Laying of Rising Main, Laying distribution system and FHTC (Functional Household Tap Connection) under Jal Jivam Mission, Soil investigation for the work of construction of 100 cum OHR staging height 20 mtr, Construction of 100 cum capacity 20 | 73.43 | 01000304262 | 09/10/2026 | VCH/000385/2026-2027 |
| Total | 576.39 | |||||||||||