Sl. No. | Division
Working Divisions
|
Bill Number | Bill Date
Date of Issuance of the Work Order as per PHED-MIS
|
Vendor Name
Vendor Appointed Against this Work Order as per PHED-MIS
|
System Order Number
System generated Order No. for the Work Order as per PHED-MIS
|
Memo Number
Memo no. for Work Order Provided by the Divisions as per PHED-MIS
|
Order Date
Date of Issuance of the Work Order as per PHED-MIS
|
work_name
Name of the Work as per the Issued Work Order
|
Bill Gross Amount | Voucher Number | Voucher Date | System Voucher Number |
---|---|---|---|---|---|---|---|---|---|---|---|---|
0 | 21,271.87 | |||||||||||
1 | Midnapore Division | BILL/00119/2024-2025 | 15/05/2024 | NABA KUMAR BHUNIA | ORD/000126/2023-2024 | 2524/MD | 18/07/2023 | Construction of Different Capacity R.C.C Over Head Reservoir Over Pile / Raft Foundation including Sub-soil investigation works for Construction of Over Head Reservoir with laying distribution system, Sinking of Tube Well, Pump House, Boundary Wall & Pro | 259.73 | BP-2024-25-92 | 17/05/2024 | VCH/000087/2024-2025 |
2 | Midnapore Division | BILL/00120/2024-2025 | 15/05/2024 | M/S. D.K.H.CONSTRUCTION | ORD/000035/2023-2024 | 1337/MD | 28/04/2023 | Sinking of Tube Well, Laying distribution pipe line, Pump House, Boundary Wall, Soil investigation, 300 cum OHR (Intze type with pile foundation) & Accommodate FHTC (2,225 nos.) under JJM with allied work for Dwandbipur PWSS in Ghatal Block including sup | 30.90 | BP-2024-25-75 | 17/05/2024 | VCH/000074/2024-2025 |
3 | Midnapore Division | BILL/00138/2024-2025 | 21/05/2024 | GOBINDA MAITY | ORD/000250/2023-2024 | 3145/MD | 29/08/2023 | Sinking of Tube Well, Laying distribution pipe line, Pump House, Boundary Wall, Soil investigation, 350 cum OHR (Intze type with pile foundation) & Accommodate FHTC (5,245 Nos.) under JJM with allied work for Augmentation of Daspur (Zone-I & Zone-II | 75.79 | BP-2024-25-99 | 28/05/2024 | VCH/000043/2024-2025 |
4 | Midnapore Division | BILL/00214/2024-2025 | 07/06/2024 | ENGINEERING PROJECTS (INDIA) LIMITED | ORD/000277/2023-2024 | 5056/MD | 26/10/2023 | Construction of Different Capacity R.C.C. Over Head Reservoir Over Pile / Raft Foundation including Sub-Soil investigation works for Construction of Over Head Reservoir with Laying distribution system, Sinking of Tube Well, Pump House, Boundary Wall & Pro | 263.07 | BP-2024-25-141 | 11/06/2024 | VCH/000136/2024-2025 |
5 | Midnapore Division | BILL/00222/2024-2025 | 11/06/2024 | SWACH ENVIRONMENT PRIVATE LIMITED | ORD/000039/2023-2024 | 1355/MD | 02/05/2023 | Construction of Different Capacity R.C.C Over Head Reservoir Over Pile / Raft Foundation including sub soil investigation works for Construction of Over Head Reservoir with laying distribution system, Sinking of Tube Well, Pump House & laying of rising m | 254.98 | BP-2024-25-143 | 11/06/2024 | VCH/000116/2024-2025 |
6 | Midnapore Division | BILL/00296/2024-2025 | 28/06/2024 | GOBINDA MAITY | ORD/000229/2023-2024 | 2953/MD | 17/08/2023 | Sinking of Tube Well, Laying distribution pipe line, Pump House, Boundary Wall, Soil investigation, Construction of 500 & 600 cum OHR (Intze type with pile foundation) & Accommodate FHTC (5,406 nos.) under JJM with allied work for Gopalnagar & Kalara | 213.56 | BP-2024-25-204 | 15/07/2024 | VCH/000170/2024-2025 |
7 | Midnapore Division | BILL/00354/2024-2025 | 23/07/2024 | M/S. D.K.H.CONSTRUCTION | ORD/000245/2023-2024 | 3100/MD | 25/08/2023 | Sinking of Tube well, Laying distribution pipe line, Rising Main, Pump House, Boundary wall, & Accommodate FHTC (659 Nos.) including 2 years O&M under JJM with allied work for Pachra & adjoining Mouza W/S Scheme in Midnapore Sadar Block including supply | 77.60 | BP-2024-25-223 | 26/07/2024 | VCH/000191/2024-2025 |
8 | Midnapore Division | BILL/00374/2024-2025 | 26/07/2024 | ABASH SARADAMOY UNNAYN PARISHAD | null | 808/RWS/MID | 15/07/2024 | Remuneration bill of NGO Managed Laboratory for the month of April 2024 to June 2024. | 1.35 | BP-2024-25-249 | 05/08/2024 | VCH/000233/2024-2025 |
9 | Midnapore Division | BILL/00425/2024-2025 | 12/08/2024 | SWACH ENVIRONMENT PRIVATE LIMITED | ORD/000397/2023-2024 | 5090/MD | 30/10/2023 | Sinking of Tube Well, Laying distribution pipe line, Pump House, Boundary Wall, Soil investigation, 450 cum OHR (Intze type with pile foundation) & Accommodate FHTC (2,335 nos.) under JJM with allied work for Makarampur PWSS in Daspur- I Block includi | 100.25 | BP-2024-25-277 | 20/08/2024 | VCH/000256/2024-2025 |
10 | Midnapore Division | BILL/00501/2024-2025 | 21/08/2024 | ENGINEERING PROJECTS (INDIA) LIMITED | ORD/000277/2023-2024 | 5056/MD | 26/10/2023 | Construction of Different Capacity R.C.C. Over Head Reservoir Over Pile / Raft Foundation including Sub-Soil investigation works for Construction of Over Head Reservoir with Laying distribution system, Sinking of Tube Well, Pump House, Boundary Wall & Pro | 121.90 | BP-2024-25-289 | 22/08/2024 | VCH/000266/2024-2025 |
11 | Midnapore Division | BILL/00516/2024-2025 | 22/08/2024 | CREATION CONSTRUCTION | ORD/000459/2023-2024 | 5283/MD | 23/11/2023 | Sinking of Tube Well, Laying distribution pipe line, Pump House, Boundary Wall, Soil investigation, 300 Cum OHR (Intze type with pile foundation) & Accommodate FHTC (2,184 nos.) under JJM with allied work including 02 (Two) Years Operation & Maintenanc | 123.28 | BP-2024-25-297 | 27/08/2024 | VCH/000288/2024-2025 |
12 | Midnapore Division | BILL/00525/2024-2025 | 27/08/2024 | DIAMOND ENGINEERS CO-OPERATIVE SOCIETY LTD. | ORD/000247/2023-2024 | 3054/MD | 23/08/2023 | Sinking of Tube Well, Laying of Rising Main, Laying distribution pipe line, Pump House, 300 cum OHR (Intze type with solid raft) & Accommodate FHTC (1,763 Nos.) including 2 years operation & maintenance under JJM with allied work for Malighati & its adjo | 35.62 | BP-2024-25-305 | 28/08/2024 | VCH/000295/2024-2025 |
13 | Midnapore Division | BILL/01884/2023-2024 | 26/03/2024 | UTSAV AGENCY | ORD/000686/2023-2024 | 5429/MD | 07/12/2023 | Survey & Collection of Data through Mobile App regarding availability of drinking water, sanitation facility & other parameters in Primary, Upper Primary Schools, Anganwadi Centers under Midnapore Division, PHE Dte. | 0.62 | BP-2024-25-64 | 01/05/2024 | VCH/001750/2023-2024 |
14 | Midnapore Division | BILL/00152/2024-2025 | 27/05/2024 | SUNIL DULE | ORD/000226/2022-2023 | 1733/MD | 23/08/2022 | Rejuvenation of Ground Water Based Piped Water Supply Scheme for Kapasda (Part) to Accommodate FHTC under JJM at Sabang Block in Paschim Medinipur District under Midnapore Division, PHE Dte. | 34.73 | BP-2024-25-108 | 30/05/2024 | VCH/000089/2024-2025 |
15 | Midnapore Division | BILL/00167/2024-2025 | 31/05/2024 | M/S. A.R. ENTERPRISE. | ORD/000225/2023-2024 | 2925/MD | 16/08/2023 | Sinking of Tube Well, Laying distribution pipe line, Pump House, Boundary Wall, Soil investigation, 300 cum OHR (Intze type with pile foundation) & Accommodate FHTC (1,741 nos.) under JJM with allied work for Chaksadi PWSS in Ghatal Block including sup | 13.30 | BP-2024-25-115 | 03/06/2024 | VCH/000095/2024-2025 |
16 | Midnapore Division | BILL/00234/2024-2025 | 14/06/2024 | GOBINDA MAITY | ORD/000248/2023-2024 | 3101/MD | 25/08/2023 | Sinking of Tube wells, Construction of 400 CuM Capacity R.C.C Over Head Reservoirs (Over Raft / Pile Foundation) including Sub-Soil investigation works with Laying distribution system, Pump Houses, Boundary walls & Providing Functional Household Tap Con | 165.76 | 2215181 | 21/06/2024 | VCH/000180/2024-2025 |
17 | Midnapore Division | BILL/00241/2024-2025 | 14/06/2024 | KHAN ENTERPRISE | ORD/000678/2022-2023 | 816/MD | 21/03/2023 | Sinking of Tube Well, Laying distribution pipe line, Pump House, Boundary wall, Soil investigation, 350 cum OHR (Intze type with pile foundation) & Accommodate FHTC (1764 Nos.) under JJM with allied work for Hrisingpur PWSS in Chandrakona-II Block incl | 114.12 | BP-2024-25-158 | 18/06/2024 | VCH/000121/2024-2025 |
18 | Midnapore Division | BILL/00302/2024-2025 | 03/07/2024 | UNIQUE AGENCY | ORD/000264/2023-2024 | 3238/MD | 11/09/2023 | Sinking of Tube Well, Laying distribution pipe line, Pump House, Boundary Wall, Soil investigation, 400 cum OHR (Intze type with pile foundation) & Accommodate FHTC (2,522 Nos.) under JJM including Two years O&M with allied work for Lakshipur PWSS i | 82.10 | BP-2024-25-190 | 08/07/2024 | VCH/000162/2024-2025 |
19 | Midnapore Division | BILL/00305/2024-2025 | 04/07/2024 | ZENITH CONSTRUCTION | ORD/000206/2023-2024 | 2822/MD | 07/08/2023 | Sinking of Tube Well ,Laying Rising Main,Laying distribution pipe line, Pump House , Boundary Wall soil investigation , 100 cum OHR (Intze type foundation) & Accommodate FHTC (490nos) Including 2 years of Operation & Maintenance under JJM with allied w | 30.20 | BP-2024-25-189 | 08/07/2024 | VCH/000161/2024-2025 |
20 | Midnapore Division | BILL/00316/2024-2025 | 08/07/2024 | M/S R.N. ENTERPRISE | ORD/000255/2023-2024 | 3150/MD | 29/08/2023 | Sinking of Tube Well, Laying distribution pipe line, Pump House, Balance FHTC (211 Nos.) & Repair of Boundary Wall, Pump House & 250 cum OHR for Augmentation of Ragpur PWSS in Pingla Block including supply of all labour & materials within Kharagpur Sub-D | 31.97 | BP-2024-25-198 | 09/07/2024 | VCH/000171/2024-2025 |
21 | Midnapore Division | BILL/00319/2024-2025 | 10/07/2024 | GOBINDA MAITY | ORD/000205/2023-2024 | 2821/MD | 07/08/2023 | Construction of Different Capacity R.C.C Over Head Reservoir Over Pile / Raft Foundation works for Construction of Over Head Reservoir with Laying distribution system, Sinking of Tube Well, Pump House, Boundary wall & Providing Functional Household Tap C | 588.90 | 2215162 | 15/07/2024 | VCH/000279/2024-2025 |
22 | Midnapore Division | BILL/00109/2024-2025 | 13/05/2024 | SWACH ENVIRONMENT PRIVATE LIMITED | ORD/000290/2023-2024 | 5049/MD | 25/10/2023 | Sinking of Tube Well, Construction of Different Capacity R.C.C Over Head Reservoir Over Pile / Raft Foundation including sub soil investigation works for Construction of Over Head Reservoir with laying distribution system, Pump House, Boundary Wall & Pro | 400.44 | BP-2024-25-94 | 17/05/2024 | VCH/000023/2024-2025 |
23 | Midnapore Division | BILL/00399/2024-2025 | 07/08/2024 | MASUM ALI KHAN | ORD/000506/2023-2024 | 5514/MD | 15/12/2023 | Sinking of Tube Well, Laying distribution pipe line, Pump House, Boundary Wall, Soil investigation, 500 cum OHR (Intze type with pile foundation) & Accommodate FHTC (2,144 nos.) under JJM with allied work for Suratpur PWSS in Daspur- I Block including sup | 170.44 | BP-2024-25-265 | 09/08/2024 | VCH/000247/2024-2025 |
24 | Midnapore Division | BILL/00495/2024-2025 | 20/08/2024 | MIDNAPUR PIPE CONCERN | ORD/000218/2023-2024 | 2871/MD | 10/08/2023 | Sinking of Tube well, Laying distribution pipe line, Rising Main, Pump House, Boundary wall & Accommodate FHTC (576 Nos.) including 2 years O&M under JJM with allied work for Mahadevchak & adjoining Mouza W/S Scheme in Midnapore Sadar Block including | 28.56 | BP-2024-25-299 | 27/08/2024 | VCH/000267/2024-2025 |
25 | Midnapore Division | BILL/00497/2024-2025 | 20/08/2024 | M/S. D.K.H.CONSTRUCTION | ORD/000232/2023-2024 | 2956/MD | 17/08/2023 | Sinking of Tube Well, Laying distribution pipe line, Rising Main, Pump House, Boundary Wall, Soil investigation, Construction of 250 Cum OHR (Intze type with Pile Foundation) & Accommodate FHTC (1,871 Nos.) including Two years O&M under JJM with allied | 306.85 | BP-2024-25-286 | 21/08/2024 | VCH/000262/2024-2025 |
26 | Midnapore Division | BILL/00410/2024-2025 | 09/08/2024 | DIPAK KUMAR BAKLY | ORD/000393/2023-2024 | 5067/MD | 26/10/2023 | Sinking of Tube Well, Laying distribution pipe line, Rising Main, Pump House, Boundary Wall, Soil investigation, Construction of 400 (Intze type with Pile) & Accommodate FHTC (2,381 Nos.) including Two years O&M under JJM with allied work for Jankapur | 79.83 | BP-2024-25-268 | 13/08/2024 | VCH/000248/2024-2025 |
27 | Midnapore Division | BILL/00061/2024-2025 | 16/04/2024 | KRISHNENDU SEKHAR DAS | ORD/000956/2022-2023 | 761/C/AE/KSD | 22/11/2022 | Training Programme in connection with skilling of Man power to Generate Employment Oppurtunities and to support implimentation of Jal Jeevan Mission Programme at different Places within Midnapore Division P.H.E Dte. (Part-A) ( DANTAN-II Block) | 0.70 | BP-2024-25-65 | 01/05/2024 | VCH/000139/2024-2025 |
28 | Midnapore Division | BILL/00110/2024-2025 | 13/05/2024 | MIDNAPUR PIPE CONCERN | ORD/000268/2023-2024 | 3242/MD | 11/09/2023 | Construction Pump House, Boundary wall & Accommodate FHTC (350 Nos.) under JJM with allied work for Karnagar PWSS in Salboni block including supply of all labour & materials within Midnapore Sadar Sub-Division under Midnapore Division, PHE Dte. [PART-E] | 14.63 | BP-2024-25-98 | 21/05/2024 | VCH/000015/2024-2025 |
29 | Midnapore Division | BILL/00112/2024-2025 | 14/05/2024 | CREATION CONSTRUCTION | ORD/000589/2022-2023 | 340/MD | 31/01/2023 | Laying distribution pipe line, Pump House, Boundary wall, OHR (100 CUM) allied work for Garberia & its adjoining mouzas W/S Scheme in GARBETA-III Block including supply of all labour & materials within Midnapore Sadar Sub-Division under Midnapore Division | 38.70 | BP-2024-25-82 | 17/05/2024 | VCH/000010/2024-2025 |
30 | Midnapore Division | BILL/00146/2024-2025 | 27/05/2024 | A-PLUS | ORD/000462/2023-2024 | 5328/MD | 28/11/2023 | Sinking of Tube well, Laying distribution pipe line, Pump House for Mouza Sakmandal within Kharagpur-II Block including supply of all labour & materials within Kharagpur Sub-Division under Midnapore Division, PHE Dte. | 15.08 | BP-2024-25-110 | 30/05/2024 | VCH/000091/2024-2025 |
31 | Midnapore Division | BILL/00209/2024-2025 | 06/06/2024 | BANERJEE CONSTRUCTION | ORD/000237/2023-2024 | 3040/MD | 22/08/2023 | Sinking of Tube Well, Laying distribution pipe line, Pump House, Boundary Wall, Soil investigation, Construction of 400 cum OHR (Intze type with pile foundation) & Accommodate FHTC (2,760 nos.) under JJM with allied work for Dharmmapur PWSS in Keshp | 119.42 | BP-2024-25-139 | 11/06/2024 | VCH/000108/2024-2025 |
32 | Midnapore Division | BILL/00210/2024-2025 | 06/06/2024 | MIDNAPUR PIPE CONCERN | ORD/000179/2023-2024 | 2719/MD | 31/07/2023 | Sinking of Tube well, Laying distribution pipe line, Pump House, Boundary wall & Balance FHTC (317) for Augmentation of Anandapur Sundarpur PWSS in Ghatal block including supply of all labour & materials within Ghatal Sub-Division under Midnapore Division | 27.75 | BP-2024-25-147 | 11/06/2024 | VCH/000112/2024-2025 |
33 | Midnapore Division | BILL/00215/2024-2025 | 07/06/2024 | GOBINDA MAITY | ORD/000229/2023-2024 | 2953/MD | 17/08/2023 | Sinking of Tube Well, Laying distribution pipe line, Pump House, Boundary Wall, Soil investigation, Construction of 500 & 600 cum OHR (Intze type with pile foundation) & Accommodate FHTC (5,406 nos.) under JJM with allied work for Gopalnagar & Kalara | 16.55 | BP-2024-25-146 | 11/06/2024 | VCH/000045/2024-2025 |
34 | Midnapore Division | BILL/00290/2024-2025 | 28/06/2024 | MAHARAJA CONSTRUCTION CO. | ORD/000521/2023-2024 | 5500/MD | 14/12/2023 | Laying distribution pipe line & Accommodate FHTC (200 Nos.) under JJM with allied work for Pathri PWSS in Salboni block including supply of all labour & materials within Midnapore Sadar Sub-Division under Midnapore Division, PHE Dte. [PART-D] | 14.96 | BP-2024-25-196 | 09/07/2024 | VCH/000166/2024-2025 |
35 | Midnapore Division | BILL/00291/2024-2025 | 28/06/2024 | KISHORE GHOSH | ORD/000198/2023-2024 | 2812/MD | 07/08/2023 | Sinking of Tube well, Laying distribution pipe line, Pump House, Boundary wall & Balance FHTC (325) for Augmentation of Ranapur PWSS in Daspur-I block including supply of all labour & materials within Ghatal Sub-Division under Midnapore Division, PHE Dte. | 19.55 | BP-2024-25-185 | 08/07/2024 | VCH/000159/2024-2025 |
36 | Midnapore Division | BILL/00367/2024-2025 | 26/07/2024 | PULLOCK KUMAR GHOSH | ORD/000222/2022-2023 | 1729/MD | 23/08/2022 | Construction & Commissioning including FHTC (Civil Part) with 3 (three) months trial run for proposed Mini Pipe W/S Scheme for Mouza - Bhagirathpur (Zone-I), Block: - Ghatal, District: - Paschim Midnapore under Midnapore Division, PHE Dte. | 1.60 | BP-2024-25-238 | 30/07/2024 | VCH/000205/2024-2025 |
37 | Midnapore Division | BILL/00370/2024-2025 | 26/07/2024 | KANGSABATI GUCHHA SAMITY | null | 808/RWS/MID | 15/07/2024 | Remuneration bill of NGO Managed Laboratory for the month of April 2024 to June 2024. | 1.35 | BP-2024-25-245 | 05/08/2024 | VCH/000229/2024-2025 |
38 | Midnapore Division | BILL/00372/2024-2025 | 26/07/2024 | BELDA SAURYA PRABHA GUCHHA SAMITI | null | 804/RWS/MID | 15/07/2024 | Remuneration bill of NGO Managed Laboratory for the month of April 2024 to June 2024. | 1.35 | BP-2024-25-247 | 05/08/2024 | VCH/000231/2024-2025 |
39 | Midnapore Division | BILL/00377/2024-2025 | 26/07/2024 | HIRAK KUMAR GHOSH | ORD/000599/2022-2023 | 854/AE/MSSD | 03/02/2023 | Laying Rising main from 2nd T.W to 1st Tube Well site for Malara & its adjoining Mouzas W/S scheme within Garhbeta-I Block under Midnapur Division P.H.E. Dte. (SL No-02) | 2.43 | BP-2024-25-234 | 30/07/2024 | VCH/000201/2024-2025 |
40 | Midnapore Division | BILL/00378/2024-2025 | 26/07/2024 | M/S. EL-CON | ORD/000063/2023-2024 | 2144/MD | 08/06/2023 | Sinking of Tube Well, Laying distribution pipe line, Pump House, Boundary Wall, soil investigation, 300 Cum OHR (Intze type with Pile foundation) & Accommodate FHTC (2432 nos.) under JJM with allied work including 02 (Two) Years Operation & Maintenance | 130.34 | BP-2024-25-231 | 29/07/2024 | VCH/000199/2024-2025 |
41 | Midnapore Division | BILL/00440/2024-2025 | 13/08/2024 | MR GOUTAM GHOSH, | ORD/001032/2022-2023 | 983/AE/MSSD | 17/03/2023 | Repair and Renovation of Switch Room cum Chlorine Room No. 2 of Amlagora Water Supply Scheme within Midnapore Sadar Sub Division under Midnapore Division, PHE Dte. (SL No-02) | 0.92 | BP-2024-25-296 | 27/08/2024 | VCH/000287/2024-2025 |
42 | Midnapore Division | BILL/00502/2024-2025 | 21/08/2024 | BENGAL TRADERS | ORD/000025/2023-2024 | 965/MD | 06/04/2023 | Construction & Commissioning including FHTC with 3 (three) months trial run for proposed Mini Pipe W/S Scheme within Block Chandrakona-II at Mouza-Karasia, JL-77 in Paschim Medinipur District under Midnapore Division, PHE Dte. | 0.19 | BP-2024-25-300 | 27/08/2024 | VCH/000290/2024-2025 |
43 | Midnapore Division | BILL/00522/2024-2025 | 27/08/2024 | MIDNAPUR PIPE CONCERN | ORD/000517/2022-2023 | 2535/MD | 12/12/2022 | Continuation Work Order for the work of Retrofitting to accommodate additional FHTC under JJM in Mugbasan PWSS, Block: - Keshpur in the District of Paschim Medinipur. | 7.44 | BP-2024-25-313 | 29/08/2024 | VCH/000301/2024-2025 |
44 | Midnapore Division | BILL/00166/2024-2025 | 31/05/2024 | BANERJEE CONSTRUCTION | ORD/000253/2023-2024 | 3148/MD | 29/08/2023 | Sinking of Tube Well, Laying distribution pipe line, Pump House, Boundary Wall, Soil investigation, Construction of 350 cum OHR (Intze type with pile foundation) & Accommodate FHTC (1,958 nos.) under JJM with allied work for Khirishmul PWSS in Keshpur | 62.20 | BP-2024-25-117 | 03/06/2024 | VCH/000096/2024-2025 |
45 | Midnapore Division | BILL/00169/2024-2025 | 31/05/2024 | UTSAV AGENCY | ORD/000760/2023-2024 | 240/MD | 01/02/2024 | Engagement of Laboratory Personnel (One Chemist, One Bacteriologist, One Laboratory Assistant & One Sampling Assistant) for regular analysis, testing and monitoring of water samples and others allied minor mtc. works of 10 Nos. Water Testing Laboratory un | 13.65 | BP-2024-25-118 | 05/06/2024 | VCH/000132/2024-2025 |
46 | Midnapore Division | BILL/00238/2024-2025 | 14/06/2024 | BANERJEE CONSTRUCTION | ORD/000471/2022-2023 | 2189/MD | 01/11/2022 | Sinking of Tube Well, Laying distribution pipe line, Pump House, Boundary Wall, Soil investigation, 300 cum OHR (Intze type with pile foundation) & Accommodate FHTC under JJM with allied work for Gopinathpur W/S Scheme in Pingla Block including supp | 5.67 | BP-2024-25-156 | 18/06/2024 | VCH/000039/2024-2025 |
47 | Midnapore Division | BILL/00258/2024-2025 | 24/06/2024 | UTSAV AGENCY | ORD/000920/2023-2024 | 808/MD | 15/03/2024 | Procurement of Chemicals, Glassware, PT samples & external calibration of all instruments etc. required for NABL recognition of 6 (Six) NGO managed laboratories under Midnapore Division, PHE Dte. | 3.05 | BP-2024-25-180 | 02/07/2024 | VCH/000154/2024-2025 |
48 | Midnapore Division | BILL/00262/2024-2025 | 25/06/2024 | MIDNAPUR PIPE CONCERN | ORD/000216/2023-2024 | 2869/MD | 10/08/2023 | Laying distribution pipe line, Rising Main, Pump House, Boundary wall including 2 years O&M under JJM with allied work for Barua & adjoining Mouza W/S Scheme in Midnapore Sadar Block including supply of all labour & materials within Midnapore Sadar Sub-Di | 37.77 | BP-2024-25-175 | 02/07/2024 | VCH/000106/2024-2025 |
49 | Midnapore Division | BILL/00304/2024-2025 | 04/07/2024 | MANNA COMPUTER | ORD/000758/2023-2024 | 162/MD | 19/01/2024 | Collection of drinking water samples through facilitator & uploading charges of field data related to Water Quality Monitoring & Surveillance within Ghatal Sub-Division under Jal Jeevan Mission. [For the period of 12 (Twelve) months] | 2.77 | 2215162 | 12/07/2024 | VCH/000181/2024-2025 |
50 | Midnapore Division | BILL/00307/2024-2025 | 04/07/2024 | ASHIM KUMAR DEY | ORD/000783/2023-2024 | 1176/AE/MSSD | 29/02/2024 | Hiring of 1 ( one) no Motor Cab ( standard ) Commercial with Catalytic Converter attachment with Bharat stage as per prevalent applicable standard compliant new / not old than 30 ( Thirty ) months from the date of 1st. registration on daily hire rate basi | 0.40 | BP-2024-25-197 | 09/07/2024 | VCH/000150/2024-2025 |
51 | Midnapore Division | BILL/00318/2024-2025 | 09/07/2024 | M/S. A.R. ENTERPRISE. | ORD/000229/2022-2023 | 1722/MD | 22/08/2022 | Laying distribution pipe line, Soil test & Construction of R.C.C. Over Head Reservoir of capacity 550 Cum and staging height 20.00 mtr. with allied work for Augmentation of Keshpur and its adjoining mouzas W/S Scheme in Keshpur Block including supply of a | 60.00 | BP-2024-25-214 | 22/07/2024 | VCH/000184/2024-2025 |
52 | Midnapore Division | BILL/00331/2024-2025 | 11/07/2024 | M/S. S.S. ENTERPRISE | ORD/000183/2023-2024 | 2735/MD | 01/08/2023 | Construction of Different Capacity R.C.C. Over Head Reservoir Over Pile / Raft Foundation including Sub-Soil investigation works for Construction of Over Head Reservoir with Laying distribution system, Sinking of Tube Well, Pump House, Boundary Wall & Pr | 326.77 | BP-2024-25-206 | 15/07/2024 | VCH/000173/2024-2025 |
53 | Midnapore Division | BILL/00106/2024-2025 | 13/05/2024 | SK. MAIDUL ISLAM | ORD/000351/2023-2024 | 4002/MD | 06/10/2023 | Laying distribution pipeline & Accommodate FHTC (400 Nos.) under JJM with allied works for Bag Basa & its adjoining mouzas W/S Scheme in Salbani block including supply of all labour & materials within Midnapore Sadar Sub-Division under Midnapore Division, | 25.33 | BP-2024-25-91 | 17/05/2024 | VCH/000086/2024-2025 |
54 | Midnapore Division | BILL/00387/2024-2025 | 01/08/2024 | PULLOCK KUMAR GHOSH | ORD/000759/2023-2024 | 163/MD | 19/01/2024 | Collection of drinking water samples through facilitator & uploading charges of field data related to Water Quality Monitoring & Surveillance within Midnapore Sadar Sub-Division under Jal Jeevan Mission. [For the period of 12 (Twelve) months] | 3.76 | BP-2024-25-253 | 06/08/2024 | VCH/000273/2024-2025 |
55 | Midnapore Division | BILL/00395/2024-2025 | 06/08/2024 | GARHBETA-1 UNEMPLOYED YOUTH ENGINEERS CO-OPERATIVE SOCIETY LTD. | ORD/000122/2023-2024 | 2493/MD | 17/07/2023 | Sinking of Tube well, Laying distribution pipe line, Rising main, Pump House, Operation & maintenance of 2 years under JJM with allied work for Shrirampur PWSS in Ghatal Block including supply of all labour & materials within Ghatal Sub-Division under Mid | 20.04 | BP-2024-25-259 | 08/08/2024 | VCH/000243/2024-2025 |
56 | Midnapore Division | BILL/00396/2024-2025 | 06/08/2024 | J.K. BUILDERS | ORD/000018/2023-2024 | 937/MD | 04/04/2023 | Laying distribution pipe line & Accommodate FHTC (470 nos.) under JJM with allied work for Piasala & its adjoining mouzas PWSS in Garbeta-II block including supply of all labour & materials within Midnapore Sadar Sub-Division under Midnapore Division, PH | 27.68 | BP-2024-25-262 | 09/08/2024 | VCH/000235/2024-2025 |
57 | Midnapore Division | BILL/00538/2024-2025 | 30/08/2024 | SUJOY KUMAR MANDAL | ORD/000512/2023-2024 | 5480/MD | 13/12/2023 | Sinking of Tube Wells, Laying distribution pipe line, Rising Main, Pump House, Boundary Wall, Soil investigation, Construction of Two nos. 150 cum & 450 cum OHRs & Accommodate FHTC (3,044 Nos.) including Two years O&M under JJM with allied work for Go | 193.54 | BP-2024-25-317 | 02/09/2024 | VCH/000308/2024-2025 |
58 | Midnapore Division | BILL/00456/2024-2025 | 13/08/2024 | GOBINDA MAITY | ORD/000947/2022-2023 | 728/AE/KSD | 10/11/2022 | Training Programme in connection with skilling of Man power to Generate Employment Oppurtunities and to support implimentation of Jal Jeevan Mission Programme at different Places within Midnapore Division P.H.E Dte. (Part-A) ( PINGLA- Block) | 0.70 | BP-2024-25-284 | 21/08/2024 | VCH/000260/2024-2025 |
59 | Midnapore Division | BILL/00338/2024-2025 | 16/07/2024 | SWACH ENVIRONMENT PRIVATE LIMITED | ORD/000039/2023-2024 | 1355/MD | 02/05/2023 | Construction of Different Capacity R.C.C Over Head Reservoir Over Pile / Raft Foundation including sub soil investigation works for Construction of Over Head Reservoir with laying distribution system, Sinking of Tube Well, Pump House & laying of rising m | 159.77 | BP-2024-25-215 | 22/07/2024 | VCH/000185/2024-2025 |
60 | Midnapore Division | BILL/00341/2024-2025 | 18/07/2024 | HYDRO TECH ASSOCIATES | ORD/000146/2023-2024 | 2638/MD | 24/07/2023 | Construction of Switch Room (3750 X 2550) along with PVC water storage OHR having capacity 20 Cum & St. Ht. 8.50 Mtr. erected over roof of Switch Room by M.S. fabricated structure, FHTC (100 Nos.) under JJM with allied work for Hariatara PWSS (Zone-III) | 3.27 | BP-2024-25-211 | 22/07/2024 | VCH/000175/2024-2025 |
61 | Midnapore Division | BILL/00344/2024-2025 | 19/07/2024 | KRISHNENDU SEKHAR DAS | ORD/000558/2023-2024 | 5512/MD | 15/12/2023 | Sinking of Tube Well, Laying distribution pipe line, Pump House, Boundary Wall for Augmentation of Barisha (Zone-I) PWSS in Pingla Block including supply of all labour & materials within Kharagpur Sub-Division under Midnapore Division, PHE Dte. | 125.65 | BP-2024-25-222 | 26/07/2024 | VCH/000190/2024-2025 |
62 | Midnapore Division | BILL/00062/2024-2025 | 16/04/2024 | KRISHNENDU SEKHAR DAS | ORD/000957/2022-2023 | 761/D/AE/KSD | 22/11/2022 | Training Programme in connection with skilling of Man power to Generate Employment Oppurtunities and to support implimentation of Jal Jeevan Mission Programme at different Places within Midnapore Division P.H.E Dte.(Part-B) ( DANTAN-II Block) | 0.51 | BP-2024-25-66 | 01/05/2024 | VCH/000140/2024-2025 |
63 | Midnapore Division | BILL/00125/2024-2025 | 15/05/2024 | M/S. D.K.H.CONSTRUCTION | ORD/000231/2023-2024 | 2955/MD | 17/08/2023 | Sinking of Tube Well, Laying distribution pipe line, Rising Main, Pump House, Boundary Wall, Soil investigation, Construction of 400 Cum OHR (Intze type with Pile Foundation) & Accommodate FHTC (2,882 Nos.) including Two years O&M under JJM with allied | 81.31 | BP-2024-25-74 | 17/05/2024 | VCH/000026/2024-2025 |
64 | Midnapore Division | BILL/00130/2024-2025 | 16/05/2024 | NATIONAL PROJECTS CONSTRUCTION CORPORATION LIMITED | ORD/000263/2023-2024 | 3237/MD | 11/09/2023 | Sinking of Tube Well, Laying distribution pipe line, Rising Main, Pump House, Boundary Wall, Soil investigation, Construction of 450 (Intze type with Pile Foundation) & Accommodate FHTC (2,554 Nos.) including Two years O&M under JJM with allied work fo | 167.46 | BP-2024-25-90 | 17/05/2024 | VCH/000085/2024-2025 |
65 | Midnapore Division | BILL/00131/2024-2025 | 17/05/2024 | PROVAT KUMAR DE | ORD/000375/2022-2023 | 1958/MD | 20/09/2022 | Laying distribution pipe line, Soil test & Construction of R.C.C. Over Head Reservoir of capacity 100 Cum and staging height 20.00 mtr. with allied work including Sinking of 250mm x 150mm x 190m deep tube well for Augmentation of Sarta-Sijua W/S Scheme | 56.54 | BP-2024-25-96 | 21/05/2024 | VCH/000088/2024-2025 |
66 | Midnapore Division | BILL/00192/2024-2025 | 04/06/2024 | M/S PRADIP KUMAR PAL | ORD/000347/2023-2024 | 3999/MD | 06/10/2023 | Sinking of Tube Well, Laying distribution pipe line, Pump House, Boundary Wall, Soil investigation, 350 cum OHR (Intze type with pile foundation) & Accommodate FHTC (2,711 nos.) under JJM with allied work for Radhanagar PWSS in Ghatal Block including su | 69.31 | BP-2024-25-124 | 05/06/2024 | VCH/000101/2024-2025 |
67 | Midnapore Division | BILL/00206/2024-2025 | 06/06/2024 | DIAMOND ENGINEERS CO-OPERATIVE SOCIETY LTD. | ORD/000246/2023-2024 | 3053/MD | 23/08/2023 | Sinking of Tube Well, Laying of Rising Main, Laying distribution pipe line, Pump House, 250 cum OHR (Intze type with solid raft) & Accommodate FHTC (1,745 Nos.) including 2 years operation & maintenance under JJM with allied work for Baguyan & its adjoini | 60.59 | BP-2024-25-148 | 11/06/2024 | VCH/000113/2024-2025 |
68 | Midnapore Division | BILL/00213/2024-2025 | 07/06/2024 | HYDRO TECH ASSOCIATES | ORD/000147/2023-2024 | 2637/MD | 24/07/2023 | Laying distribution pipe line under JJM with allied work for Shrirampur PWSS in Ghatal Block including supply of all labour & materials within Ghatal Sub-Division under Midnapore Division, PHE Dte. [PART-D] | 8.34 | BP-2024-25-140 | 11/06/2024 | VCH/000109/2024-2025 |
69 | Midnapore Division | BILL/00216/2024-2025 | 07/06/2024 | MASUM ALI KHAN | ORD/000506/2023-2024 | 5514/MD | 15/12/2023 | Sinking of Tube Well, Laying distribution pipe line, Pump House, Boundary Wall, Soil investigation, 500 cum OHR (Intze type with pile foundation) & Accommodate FHTC (2,144 nos.) under JJM with allied work for Suratpur PWSS in Daspur- I Block including sup | 14.92 | BP-2024-25-144 | 11/06/2024 | VCH/000042/2024-2025 |
70 | Midnapore Division | BILL/00223/2024-2025 | 11/06/2024 | GOBINDA MAITY | ORD/000227/2023-2024 | 2951/MD | 17/08/2023 | Sinking of Tube Well, Laying distribution pipe line, Pump House, Boundary wall, Soil investigation, 550 cum OHR (Intze type with pile foundation) & Accommodate FHTC (4,219 Nos.) under JJM with allied work for Jadabpur PWSS in Chandrakona-I Block inclu | 143.34 | BP-2024-25-145 | 11/06/2024 | VCH/000111/2024-2025 |
71 | Midnapore Division | BILL/00289/2024-2025 | 27/06/2024 | A R ENTERPRISE | ORD/000103/2023-2024 | 2485/MD | 17/07/2023 | Laying distribution pipe line under JJM with allied work for Pathri PWSS in Salboni block including supply of all labour & materials within Midnapore Sadar Sub-Division under Midnapore Division, PHE Dte. [PART-E] | 17.66 | BP-2024-25-181 | 02/07/2024 | VCH/000155/2024-2025 |
72 | Midnapore Division | BILL/00295/2024-2025 | 28/06/2024 | GOBINDA MAITY | ORD/000250/2023-2024 | 3145/MD | 29/08/2023 | Sinking of Tube Well, Laying distribution pipe line, Pump House, Boundary Wall, Soil investigation, 350 cum OHR (Intze type with pile foundation) & Accommodate FHTC (5,245 Nos.) under JJM with allied work for Augmentation of Daspur (Zone-I & Zone-II | 32.43 | BP-2024-25-183 | 08/07/2024 | VCH/000157/2024-2025 |
73 | Midnapore Division | BILL/00299/2024-2025 | 02/07/2024 | GOBINDA MAITY | ORD/000204/2023-2024 | 2820/MD | 07/08/2023 | Construction of Different Capacity R.C.C Over Head Reservoir Over Pile / Raft Foundation works with laying rising main, distribution system , Sinking of Tube Well , Pump House , Boundary Wall, & Providing Functional Household Tap Connection (1430 Nos) in | 23.72 | BP-2024-25-193 | 08/07/2024 | VCH/000164/2024-2025 |
74 | Midnapore Division | BILL/00358/2024-2025 | 23/07/2024 | NIRMAL UDYOG | ORD/000559/2023-2024 | 5513/MD | 15/12/2023 | Sinking of Tube Well, Construction of 250 Cum OHR including Soil Investigation, Laying distribution pipe line, Pump House, Boundary wall for Augmentation of Barisha (Zone-II) PWSS in Pingla Block including supply of all labour & materials within Kharagp | 50.59 | BP-2024-25-219 | 26/07/2024 | VCH/000187/2024-2025 |
75 | Midnapore Division | BILL/00368/2024-2025 | 26/07/2024 | PULLOCK KUMAR GHOSH | ORD/000715/2021-2022 | 319/MD | 17/02/2022 | Construction & Commissioning including FHTC (Civil Part) with 3 (three) months trial run for proposed Mini Pipe W/S Scheme under SAGY for Mouza- Masharpur (Zone-I), Block - Ghatal, District - Paschim Medinipur under Midnapore Division, PHE Dte. | 0.70 | BP-2024-25-235 | 30/07/2024 | VCH/000202/2024-2025 |
76 | Midnapore Division | BILL/00371/2024-2025 | 26/07/2024 | KESHPUR SHAHID KSHUDIRAM SEVA SAMITY | null | 804/RWS/MID | 15/07/2024 | Remuneration bill of NGO Managed Laboratory for the month of April 2024 to June 2024. | 1.35 | BP-2024-25-246 | 05/08/2024 | VCH/000230/2024-2025 |
77 | Midnapore Division | BILL/00428/2024-2025 | 12/08/2024 | M/S. CARE | ORD/000265/2023-2024 | 3239/MD | 11/09/2023 | Sinking of Tube Well, Laying distribution pipe line, Rising Main, Pump House, Boundary Wall, Construction of 300 Cum OHR (Intze type Raft Foundation) & Accommodate FHTC (2,400 Nos.) including Two years O&M under JJM with allied work for Pathra & adjo | 50.61 | BP-2024-25-275 | 16/08/2024 | VCH/000214/2024-2025 |
78 | Midnapore Division | BILL/00507/2024-2025 | 21/08/2024 | S & P ENTERPRISE | ORD/000210/2023-2024 | 2827/MD | 07/08/2023 | Construction of Different Capacity R.C.C Over Head Reservoir Over Pile / Raft Foundation including sub soil investigation works for Construction of Over Head Reservoir with laying distribution system, Sinking of Tube Well, Pump House, Boundary Wall & Pro | 201.22 | BP-2024-25-292 | 22/08/2024 | VCH/000264/2024-2025 |
79 | Midnapore Division | BILL/00517/2024-2025 | 22/08/2024 | PULLOCK KUMAR GHOSH | ORD/000460/2023-2024 | 5326/MD | 28/11/2023 | Sinking of Tube well, Construction of Pump House & Accommodate FHTC (910 Nos.) under JJM with allied work for Kuapur PWSS in Chandrakona-II block including supply of all labour & materials within Ghatal Sub-Division under Midnapore Division, PHE Dte. [PAR | 16.14 | BP-2024-25-298 | 27/08/2024 | VCH/000289/2024-2025 |
80 | Midnapore Division | BILL/00527/2024-2025 | 27/08/2024 | EVEREST CONSULTANT SERVICES | ORD/000173/2023-2024 | 2675/MD | 26/07/2023 | Laying distribution pipe line & Accommodate FHTC (400 Nos.) under JJM with allied work for Amlasuli & its adjoining mouzas W/S Scheme in Garbeta-II block including supply of all labour & materials within Midnapore Sadar Sub-Division under Midnapore Divisi | 24.31 | BP-2024-25-310 | 29/08/2024 | VCH/000300/2024-2025 |
81 | Midnapore Division | BILL/00528/2024-2025 | 28/08/2024 | M/S. S.S. ENTERPRISE | ORD/000183/2023-2024 | 2735/MD | 01/08/2023 | Construction of Different Capacity R.C.C. Over Head Reservoir Over Pile / Raft Foundation including Sub-Soil investigation works for Construction of Over Head Reservoir with Laying distribution system, Sinking of Tube Well, Pump House, Boundary Wall & Pr | 389.98 | BP-2024-25-312 | 29/08/2024 | VCH/000302/2024-2025 |
82 | Midnapore Division | BILL/00529/2024-2025 | 29/08/2024 | SUJATA CONSTRUCTION | ORD/000034/2023-2024 | 1142/MD | 25/04/2023 | Laying distribution pipe line, Pump House, Boundary wall, Soil investigation, 350 cum OHR (Intze type with pile foundation) & Accommodate FHTC under JJM with allied work for Dhanyagachhi PWSS in Chandrakona-II block including supply of all labour & materi | 28.42 | BP-2024-25-314 | 02/09/2024 | VCH/000305/2024-2025 |
83 | Midnapore Division | BILL/00530/2024-2025 | 29/08/2024 | M/S. D.K.H.CONSTRUCTION | ORD/000273/2023-2024 | 3260/MD | 12/09/2023 | Sinking of Tube Well, Laying distribution pipe line, Pump House, Boundary Wall, Soil investigation, 450 cum OHR (Intze type with pile foundation) & Accommodate FHTC (3,044 Nos.) under JJM including Two years O&M with allied work for Basanchhara PWSS i | 121.73 | BP-2024-25-316 | 02/09/2024 | VCH/000307/2024-2025 |
84 | Midnapore Division | BILL/00154/2024-2025 | 27/05/2024 | FIROJ KHAN | ORD/000111/2023-2024 | 2512/MD | 18/07/2023 | Sinking of Two nos. 250 X 150 mm dia. X 160 mtr. depth deep tube well by direct rotary method under JJM with allied work for Karnagar PWSS in Salboni block including supply of all labour & materials within Midnapore Sadar Sub-Division under Midnapore Divi | 7.97 | BP-2024-25-386 | 05/06/2024 | VCH/000098/2024-2025 |
85 | Midnapore Division | BILL/00168/2024-2025 | 31/05/2024 | DIPAK KUMAR DOLAI | ORD/000170/2023-2024 | 2672/MD | 26/07/2023 | Sinking of Tube well, Laying distribution pipe line, Pump House, Boundary wall & Balance FHTC (502) for Augmentation of Pratappur PWSS in Ghatal block including supply of all labour & materials within Ghatal Sub-Division under Midnapore Division, PHE Dte. | 8.75 | BP-2024-25-116 | 03/06/2024 | VCH/000137/2024-2025 |
86 | Midnapore Division | BILL/00235/2024-2025 | 14/06/2024 | S & P ENTERPRISE | ORD/000212/2023-2024 | 2823/MD | 07/08/2023 | Construction of Different Capacity R.C.C. Over Head Reservoir Over Pile / Raft Foundation including sub soil investigation works for Construction of Over Head Reservoir with laying distribution system, Sinking of Tube Well, Pump House, Boundary Wall & P | 230.42 | 2215216 | 01/07/2024 | VCH/000216/2024-2025 |
87 | Midnapore Division | BILL/00242/2024-2025 | 18/06/2024 | A.J. ENTERPRISE | ORD/000228/2023-2024 | 2952/MD | 17/08/2023 | Sinking of Tube Well, Laying distribution pipe line, Pump House, Boundary Wall, Soil investigation, 350 Cum OHR (Intze type with Pile foundation) & Accommodate FHTC (2,648 nos.) under JJM with allied work including 02 (Two ) Years Operation & Mainten | 101.24 | BP-2024-25-162 | 19/06/2024 | VCH/000123/2024-2025 |
88 | Midnapore Division | BILL/00263/2024-2025 | 25/06/2024 | MAHAPRABHU ENTERPRISE | ORD/000098/2023-2024 | 2473/MD | 14/07/2023 | Construction & Commissioning including FHTC with 3 (three) months trial run for proposed Mini Pipe W/S Scheme within Block Daspur-II at Mouza-Jagannathpur, JL-85 in Paschim Medinipur District under Midnapore Division, PHE Dte. | 9.32 | BP-2024-25-176 | 02/07/2024 | VCH/000153/2024-2025 |
89 | Midnapore Division | BILL/00306/2024-2025 | 04/07/2024 | ASHIM KUMAR DEY | ORD/000783/2023-2024 | 1176/AE/MSSD | 29/02/2024 | Hiring of 1 ( one) no Motor Cab ( standard ) Commercial with Catalytic Converter attachment with Bharat stage as per prevalent applicable standard compliant new / not old than 30 ( Thirty ) months from the date of 1st. registration on daily hire rate basi | 0.40 | BP-2024-25-197 | 09/07/2024 | VCH/000151/2024-2025 |
90 | Midnapore Division | BILL/00330/2024-2025 | 11/07/2024 | R. CONSTRUCTION | ORD/000043/2023-2024 | 1408/MD | 04/05/2023 | Construction of Pump House, Laying Rising main, Boundary wall, Laying distribution system pipe line, Accommodate FHTC (252 Nos.) including 2 yrs. O&M under JJM with allied work for Hariatara PWSS (Zone-II) in Kharagpur-I block including supply of all labo | 12.42 | BP-2024-25-207 | 15/07/2024 | VCH/000149/2024-2025 |
91 | Midnapore Division | BILL/00388/2024-2025 | 02/08/2024 | WBSEDCL | null | 2004825735/QUOT/03 | 23/07/2024 | QUOTATION MONEY FOR KHEMASOLI WATER SUPPLY SCHEME, ZONE-I, T W NO I, [ KEMASOLI], JJM WORKS, SCHEME CODE SM/15590, APPLICATION NO 2004825735, REFERENCE ID 204360220, NIMPURA CCC, WBSEDCL | 3.10 | BP-2024-25-294 | 27/08/2024 | VCH/000283/2024-2025 |
92 | Midnapore Division | BILL/00394/2024-2025 | 16/05/2024 | SUJOY RANJAN BHOWMICK | ORD/001720/2022-2023 | 618/W/MMD | 20/03/2023 | Providing and Installation of Submersible pumping machineries and other electromechanical equipments for CHAKMAOA AND ITS ADJOINING MOUZAS PWSS under JJM Program under MMD PHE Dte. | 12.51 | BP-2024-25-272 | 13/08/2024 | VCH/000252/2024-2025 |
93 | Midnapore Division | BILL/00464/2024-2025 | 13/08/2024 | ARNAB PATRA | ORD/000053/2024-2025 | 2448/MD | 08/08/2024 | Laying of Rising main & interconnection pipeline for Augmentation of Goaltore & its adjoining mouzas PWSS, Block - Garhbeta-II, District - Paschim Medinipur under Midnapore Division, PHE Dte. (Length - 950.00 Mtr.) | 4.85 | BP-2024-25-279 | 20/08/2024 | VCH/000258/2024-2025 |
94 | Midnapore Division | BILL/00342/2024-2025 | 18/07/2024 | PULLOCK KUMAR GHOSH | ORD/000002/2023-2024 | 971/MD | 10/04/2023 | Laying distribution pipe line, Construction of Pump house & Boundary wall in 2nd tube well site for Dhanyagachhi PWSS in Chandrakona-II block including supply of all labour & materials within Ghatal Sub-Division under Midnapore Division, PHE. Dte. [PART-B | 14.60 | BP-2024-25-213 | 22/07/2024 | VCH/000183/2024-2025 |
95 | Midnapore Division | BILL/00403/2024-2025 | 08/08/2024 | A K SIKDAR | ORD/000002/2024-2025 | 1797/MD | 07/06/2024 | Sinking of Tube well, Laying distribution pipe line with Rising main, Switch Room (3750 X 2550) along with PVC water storage OHR having capacity 20.00 Cum & St. Ht. 8.50 Mtr. erected over roof of Switch Room by M.S. fabricated structure, FHTC (281 Nos.) & | 18.95 | BP-2024-25-273 | 14/08/2024 | VCH/000220/2024-2025 |
96 | Midnapore Division | BILL/00407/2024-2025 | 08/08/2024 | GOUTAM RAY | ORD/000148/2023-2024 | 2639/MD | 24/07/2023 | Laying distribution pipe line, Rising main & Accommodate FHTC (400 Nos.) including 2 yrs. O & M under JJM with allied work for Pathri PWSS in Salboni block including supply of all labour & materials within Midnapore Sadar Sub-Division under Midnapore Divi | 43.05 | BP-2024-25-269 | 13/08/2024 | VCH/000249/2024-2025 |
97 | Midnapore Division | BILL/00055/2024-2025 | 16/04/2024 | SAI TUBE CO. | ORD/000614/2022-2023 | 440/MD | 10/02/2023 | Rejuvenation of Ground Water Based Piped Water Supply Scheme for Adasimla (Part) to Accommodate FHTC under JJM at Sabang Block in Paschim Medinipur District under Midnapore Division, PHE Dte. | 1.16 | BP-2024-25-70 | 07/05/2024 | VCH/000016/2024-2025 |
98 | Midnapore Division | BILL/00097/2024-2025 | 06/05/2024 | PULLOCK KUMAR GHOSH | ORD/000223/2022-2023 | 1730/MD | 23/08/2022 | Construction & Commissioning including FHTC (Civil Part) with 3 (three) months trial run for proposed Mini Pipe W/S Scheme for Mouza - Bhagirathpur (Zone-II), Block: - Ghatal, District: - Paschim Midnapore under Midnapore Division, PHE Dte. | 6.58 | BP-2024-25-72 | 13/05/2024 | VCH/000073/2024-2025 |
99 | Midnapore Division | BILL/00111/2024-2025 | 13/05/2024 | M/S. D.K.H.CONSTRUCTION | ORD/000273/2023-2024 | 3260/MD | 12/09/2023 | Sinking of Tube Well, Laying distribution pipe line, Pump House, Boundary Wall, Soil investigation, 450 cum OHR (Intze type with pile foundation) & Accommodate FHTC (3,044 Nos.) under JJM including Two years O&M with allied work for Basanchhara PWSS i | 85.38 | BP-2024-25-97 | 21/05/2024 | VCH/000138/2024-2025 |
100 | Midnapore Division | BILL/00113/2024-2025 | 14/05/2024 | DIPAK KUMAR DOLAI | ORD/000182/2023-2024 | 2722/MD | 31/07/2023 | Sinking of Tube well, Laying distribution pipe line, Pump House, Boundary wall & Balance FHTC (522 Nos.) under JJM with allied work for Augmentation of Mansuka Pipe W/S Scheme in Ghatal Block including supply of all labour & materials within Ghatal Sub-D | 9.43 | BP-2024-25-81 | 17/05/2024 | VCH/000078/2024-2025 |
101 | Midnapore Division | BILL/00116/2024-2025 | 09/05/2024 | SWACH ENVIRONMENT PRIVATE LIMITED | ORD/000039/2023-2024 | 1355/MD | 02/05/2023 | Construction of Different Capacity R.C.C Over Head Reservoir Over Pile / Raft Foundation including sub soil investigation works for Construction of Over Head Reservoir with laying distribution system, Sinking of Tube Well, Pump House & laying of rising m | 287.40 | BP-2024-25-93 | 17/05/2024 | VCH/000019/2024-2025 |
102 | Midnapore Division | BILL/00117/2024-2025 | 15/05/2024 | M/S. D.K.H.CONSTRUCTION | ORD/000036/2023-2024 | 1338/MD | 28/04/2023 | Sinking of Tube Well, Laying distribution pipe line, Pump House, Boundary Wall, Soil investigation, 250 cum OHR (Intze type with pile foundation) & Accommodate FHTC (1,647 nos.) under JJM with allied work for Kushman PWSS in Ghatal Block including suppl | 13.27 | BP-2024-25-76 | 17/05/2024 | VCH/000075/2024-2025 |
103 | Midnapore Division | BILL/00118/2024-2025 | 15/05/2024 | M/S. D.K.H.CONSTRUCTION | ORD/000180/2023-2024 | 2720/MD | 31/07/2023 | Sinking of Tube well, Laying distribution pipe line, Pump House, Boundary wall & Balance FHTC (998) for Augmentation of Supapursuri PWSS in Daspur-I block including supply of all labour & materials within Ghatal Sub-Division under Midnapore Division, PHE | 39.80 | BP-2024-25-77 | 17/05/2024 | VCH/000076/2024-2025 |
104 | Midnapore Division | BILL/00357/2024-2025 | 23/07/2024 | SWACH ENVIRONMENT PRIVATE LIMITED | ORD/000290/2023-2024 | 5049/MD | 25/10/2023 | Sinking of Tube Well, Construction of Different Capacity R.C.C Over Head Reservoir Over Pile / Raft Foundation including sub soil investigation works for Construction of Over Head Reservoir with laying distribution system, Pump House, Boundary Wall & Pro | 248.70 | BP-2024-25-225 | 26/07/2024 | VCH/000193/2024-2025 |
105 | Midnapore Division | BILL/00363/2024-2025 | 24/07/2024 | NATIONAL PROJECTS CONSTRUCTION CORPORATION LIMITED | ORD/000238/2023-2024 | 3047/MD | 23/08/2023 | Sinking of Tube Well, Construction of Different Capacity R.C.C Over Head Reservoir Over Pile / Raft Foundation including Sub-Soil investigation works for Construction of Over Head Reservoir with laying distribution system, Pump House, Boundary Wall & Pro | 310.18 | BP-2024-25-224 | 26/07/2024 | VCH/000192/2024-2025 |
106 | Midnapore Division | BILL/00369/2024-2025 | 26/07/2024 | PULLOCK KUMAR GHOSH | ORD/001077/2022-2023 | 433/MD | 10/02/2023 | Continuation Work Order for Construction & Commissioning including FHTC (Civil Part) with 3 (three) months trial run for proposed Mini Pipe W/S Scheme under SAGY for Mouza- Masharpur (Zone-I), Block ¿ Ghatal, District ¿ Paschim Medinipur under Midnapore D | 0.84 | BP-2024-25-236 | 30/07/2024 | VCH/000203/2024-2025 |
107 | Midnapore Division | BILL/00373/2024-2025 | 26/07/2024 | PALLIMANGAL GUCHHA SAMITY | null | 808/RWS/MID | 15/07/2024 | Remuneration bill of NGO Managed Laboratory for the month of April 2024 to June 2024. | 1.35 | BP-2024-25-248 | 05/08/2024 | VCH/000232/2024-2025 |
108 | Midnapore Division | BILL/00385/2024-2025 | 01/08/2024 | GOUTAM PARIA | ORD/000024/2023-2024 | 946/MD | 05/04/2023 | Sinking of Tube well, Laying distribution pipe line with Rising main, Switch Room (3750 X 2550) along with PVC water storage OHR having capacity 20.00 Cum & St. Ht. 8.50 Mtr. erected over roof of Switch Room by M.S. fabricated structure, FHTC (261 Nos.) & | 19.62 | BP-2024-25-252 | 06/08/2024 | VCH/000218/2024-2025 |
109 | Midnapore Division | BILL/00424/2024-2025 | 12/08/2024 | MANAS KUMAR RAKSHIT | ORD/000123/2020-2021 | 1030/AE/GSD | 15/10/2020 | Day to day operation & maintenance of distribution system & Rising main (CI/DI/HDPE/UPVC) with all related structure i.e. OHR etc. of Bachhra KunduW/S Scheme under Midnapore Division P.H.E. Dte. (Period from 01/11/2020 to 31/12/2020) | 0.83 | BP-2024-25-276 | 20/08/2024 | VCH/000254/2024-2025 |
110 | Midnapore Division | BILL/00439/2024-2025 | 13/08/2024 | MR GOUTAM GHOSH, | ORD/001030/2022-2023 | 982/AE/MSSD | 17/03/2023 | Repair and Renovation of Switch Room cum Chlorine Room No. 1 of Amlagora Water Supply Scheme within Midnapore Sadar Sub Division under Midnapore Division, PHE Dte. | 0.92 | BP-2024-25-295 | 27/08/2024 | VCH/000286/2024-2025 |
111 | Midnapore Division | BILL/00449/2024-2025 | 13/08/2024 | WBSEDCL | null | 2004852930/Quot/03 | 08/08/2024 | ELECTRIC QUOTATION BILL FOR TW NO-II OF JAHALDA PWSS. REF CONSUMER ID-204373747, APPLICATION NO-2004852930, APPLICATION TYPE-NEW CONNECTION, NAME OF CCC-KHAKURDA CCC, NAME OF BLOCK-DANTAN-II | 9.12 | BP-2024-25-294 | 27/08/2024 | VCH/000285/2024-2025 |
112 | Midnapore Division | BILL/00181/2024-2025 | 03/06/2024 | DULAL CHANDRA DAS | ORD/000665/2022-2023 | 584/MD | 23/02/2023 | Sinking of Tube Well, Laying distribution pipe line, Pump House for Sansahara & Manikarah villages within Barsahara PWSS in Sabang Block including supply of all labour & materials within Kharagpur Sub-Division under Midnapore Division, PHE Dte. | 13.28 | 24-25-128,135 | 06/06/2024 | VCH/000103/2024-2025 |
113 | Midnapore Division | BILL/00228/2024-2025 | 13/06/2024 | MIDNAPUR PIPE CONCERN | ORD/000117/2023-2024 | 2492/MD | 17/07/2023 | Sinking of Tube well, Laying of Rising Main, Laying distribution pipe line, Pump House & Accommodate FHTC (437 Nos.) including 2 years operation & maintenance under JJM with allied work for Godapiyasol & its adjoining mouzas W/S Scheme in Salbani block | 17.50 | BP-2024-25-153 | 18/06/2024 | VCH/000119/2024-2025 |
114 | Midnapore Division | BILL/00229/2024-2025 | 13/06/2024 | BANERJEE CONSTRUCTION | ORD/000536/2021-2022 | 33/MD | 07/01/2022 | Laying distribution pipe line, Soil test and Construction of R.C.C. Elevated Reservoir of capacity 400 Cum and staging height 20.00 mtr. with allied works (Pile Foundation) including Providing FHTC of TANUYA & its adjoining mouzas Water Supply Scheme wit | 56.41 | BP-2024-25-152 | 18/06/2024 | VCH/000118/2024-2025 |
115 | Midnapore Division | BILL/00251/2024-2025 | 21/06/2024 | BANERJEE CONSTRUCTION | ORD/000254/2023-2024 | 3149/MD | 29/08/2023 | Sinking of Tube Well, Laying distribution pipe line, Pump House, Boundary Wall, Soil investigation, 400 cum OHR (Intze type with pile foundation) & Accommodate FHTC (2,702 nos.) under JJM with allied work for Torai PWSS in Keshpur Block including sup | 83.35 | BP-2024-25-167 | 24/06/2024 | VCH/000126/2024-2025 |
116 | Midnapore Division | BILL/00252/2024-2025 | 21/06/2024 | S.N ENTERPRISE | ORD/000123/2023-2024 | 2522/MD | 18/07/2023 | Laying distribution of Pipe line and Accommodate FHTC (440 Nos.) work for Proposed Sasha Bedia & its adjoining mouzas PWSS, Block-Garhbeta-II, Dist:- Paschim Medinipore under Midnapur Division, PHE Dte. [PART-IV] | 35.62 | BP-2024-25-169 | 24/06/2024 | VCH/000128/2024-2025 |
117 | Midnapore Division | BILL/00255/2024-2025 | 21/06/2024 | S.T. ENTERPRISE | ORD/000008/2023-2024 | 977/MD | 10/04/2023 | Laying distribution of Pipe line and accommodate FHTC work (320 Nos.) for Proposed Chhoto Nakdana & its adjoining mouzas PWSS, Block-Garhbeta-II Dist:- Paschim Medinipore under Midnapore Division PHE Dte. [PART-V] | 68.45 | BP-2024-25-171 | 24/06/2024 | VCH/000130/2024-2025 |
118 | Midnapore Division | BILL/00261/2024-2025 | 25/06/2024 | MIDNAPUR PIPE CONCERN | ORD/000636/2023-2024 | 140/MD | 18/01/2024 | Sinking of Tube well, Laying distribution pipeline, Rising main, Pump House, Boundary Wall & Accommodate FHTC (546 Nos.) including 2 yrs. O & M under JJM with allied work for Shiromani & adjoining Mouza W/S Scheme in Midnapore Sadar Block including supply | 28.07 | BP-2024-25-178 | 02/07/2024 | VCH/000105/2024-2025 |
119 | Midnapore Division | BILL/00265/2024-2025 | 27/06/2024 | RITESH AGARWALL | ORD/000727/2022-2023 | 867/MD | 28/03/2023 | Construction & Commissioning including FHTC with 3 (three) months trial run for proposed Mini Pipe W/S Scheme within Block Kharagpur-I at Mouza-Banpatna, JL-340 in Paschim Medinipur District under Midnapore Division, PHE Dte. | 0.19 | BP-2024-25-182 | 02/07/2024 | VCH/000156/2024-2025 |
120 | Midnapore Division | BILL/00300/2024-2025 | 02/07/2024 | WATER LINK | ORD/000092/2023-2024 | 2468/MD | 14/07/2023 | Laying distribution system pipe line & Accommodate FHTC (252 Nos.) under JJM with allied work for Hariatara PWSS (Zone-I) in Kharagpur-I block including supply of all labour & materials within Kharagpur Sub-Division under Midnapore Division, PHE Dte. [PAR | 39.47 | BP-2024-25-187 | 08/07/2024 | VCH/000148/2024-2025 |
121 | Midnapore Division | BILL/00390/2024-2025 | 02/08/2024 | GOBINDA MAITY | ORD/000209/2023-2024 | 2825/MD | 07/08/2023 | Sinking of Tube wells, Construction of 450 CuM Capacity R.C.C Over Head Reservoirs (Over Pile Foundation) including Sub-Soil investigation works with Laying distribution system, Pump Houses, Boundary walls & Providing Functional Household Tap Connection | 68.23 | BP-2024-25-254 | 06/08/2024 | VCH/000240/2024-2025 |
122 | Midnapore Division | BILL/00397/2024-2025 | 06/08/2024 | GOBINDA MAITY | ORD/000227/2023-2024 | 2951/MD | 17/08/2023 | Sinking of Tube Well, Laying distribution pipe line, Pump House, Boundary wall, Soil investigation, 550 cum OHR (Intze type with pile foundation) & Accommodate FHTC (4,219 Nos.) under JJM with allied work for Jadabpur PWSS in Chandrakona-I Block inclu | 39.30 | BP-2024-25-261 | 08/08/2024 | VCH/000244/2024-2025 |
123 | Midnapore Division | BILL/00537/2024-2025 | 30/08/2024 | NIMAI LAL GURIA | ORD/000843/2023-2024 | 745/MD | 13/03/2024 | Laying Distribution Pipeline & Accommodate FHTC (200 Nos.) under JJM with allied work for Rupnarayanpur & its adjoining mouzas W/S Scheme (Zone-I) in Kharagpur-I block including supply of all labour & materials within Kharagpur Sub-Division under Midnapor | 20.76 | BP-2024-25-318 | 02/09/2024 | VCH/000309/2024-2025 |
124 | Midnapore Division | BILL/00143/2024-2025 | 27/05/2024 | GOBINDA MAITY | ORD/000040/2020-2021 | 978/MD | 08/09/2020 | Laying Distribution System of HDPE (PE-100, PN-6) & D.I. (K-7) pipeline for Bhabaninagar W/S Scheme within Midnapore Sadar Block under Midnapore Sadar Sub-Division of Midnapore Division, PHE Dte. | 2.68 | BP-2024-25-136 | 06/06/2024 | VCH/000104/2024-2025 |
125 | Midnapore Division | BILL/00144/2024-2025 | 27/05/2024 | DULAL CHANDRA DAS | ORD/000207/2022-2023 | 1672/MD | 12/08/2022 | Rejuvenation of Ground Water Based Piped Water Supply Scheme for Chandkuri (Zone-II) (Part) to Accommodate FHTC under JJM at Sabang Block in Paschim Medinipur District under Midnapore Division, PHE Dte. | 49.14 | BP-2024-25-120 | 05/06/2024 | VCH/000097/2024-2025 |
126 | Midnapore Division | BILL/00356/2024-2025 | 23/07/2024 | DIPAK KUMAR BAKLY | ORD/000504/2022-2023 | 2517/MD | 09/12/2022 | Sinking of Tube Well, Laying distribution pipe line, Pump House, Boundary wall with allied work for Augmentation of Gobardhanpur & its adjoining mouzas W/S Scheme in Pingla Block including supply of all labour & materials within Kharagpur Sub-Division | 34.33 | BP-2024-25-221 | 26/07/2024 | VCH/000189/2024-2025 |
127 | Midnapore Division | BILL/00359/2024-2025 | 24/07/2024 | PULLOCK KUMAR GHOSH | ORD/001075/2022-2023 | 107/AE.GSD | 13/02/2023 | Retrofitting to accommodate FHTC under JJM at different places for Srinagar PWSS & its adjoining mouzas ( Phase -III) Under ChandraKona - I & II Block within Midnapore Division, PHE Dte. ( Kochgeria) | 0.85 | BP-2024-25-227 | 29/07/2024 | VCH/000195/2024-2025 |
128 | Midnapore Division | BILL/00362/2024-2025 | 24/07/2024 | ASIS KUMAR SARANGI | ORD/000279/2023-2024 | 3822/MD | 20/09/2023 | Sinking of Tube Well, Laying of Rising Main, Laying distribution pipe line, Pump House, Boundary Wall, 300 cum OHR (Intze type with solid raft) & Accommodate FHTC (1,832 Nos.) including 2 years operation & maintenance under JJM with allied work for Ramch | 203.05 | BP-2024-25-226 | 26/07/2024 | VCH/000194/2024-2025 |
129 | Midnapore Division | BILL/00380/2024-2025 | 29/07/2024 | GOUTAM RAY | ORD/000936/2023-2024 | 096/RWS/MID | 27/02/2024 | Veatical Electrical Resistivity Survey at proposed tube well site for Gurguripal water Supply scheme within Midnapore Sadar Blick under Midnapore Division PHE.Dte. | 0.79 | BP-2024-25-240 | 05/08/2024 | VCH/000237/2024-2025 |
130 | Midnapore Division | BILL/00384/2024-2025 | 31/07/2024 | GOBINDA MAITY | ORD/000466/2023-2024 | 5360/MD | 30/11/2023 | Sinking of Tube Well, Laying distribution pipe line, Rising Main, Pump House, Boundary Wall, Soil investigation, Construction of 200 Cum & 300 Cum OHR (Intze type with Solid raft/ Pile Foundation) & Accommodate FHTC (6,605 Nos.) including Two years O&M | 352.81 | BP-2024-25-243 | 05/08/2024 | VCH/000272/2024-2025 |
131 | Midnapore Division | BILL/00437/2024-2025 | 13/08/2024 | A-PLUS | ORD/000199/2023-2024 | 2813/MD | 07/08/2023 | Sinking of Tube well, Laying distribution pipe line & Pump House for Nona Madhabchak PWSS for the Mouza Makramichak and Jagannathchak (Situated opposite side of Keleghai River bank) under Midnapore Division, PHE Dte. | 8.87 | BP-2024-25-282 | 21/08/2024 | VCH/000259/2024-2025 |
132 | Midnapore Division | BILL/00498/2024-2025 | 20/08/2024 | SAJAL JANA | ORD/000027/2023-2024 | 964/MD | 06/04/2023 | Construction & Commissioning including FHTC with 3 (three) months trial run for proposed Mini Pipe W/S Scheme within Block Daspur-II at Mouza-Nischintapur, JL-230 in Paschim Medinipur District under Midnapore Division, PHE Dte. | 0.19 | BP-2024-25-301 | 27/08/2024 | VCH/000291/2024-2025 |
133 | Midnapore Division | BILL/00503/2024-2025 | 21/08/2024 | UTSAV AGENCY | ORD/000760/2023-2024 | 240/MD | 01/02/2024 | Engagement of Laboratory Personnel (One Chemist, One Bacteriologist, One Laboratory Assistant & One Sampling Assistant) for regular analysis, testing and monitoring of water samples and others allied minor mtc. works of 10 Nos. Water Testing Laboratory un | 13.65 | BP-2024-25-303 | 27/08/2024 | VCH/000293/2024-2025 |
134 | Midnapore Division | BILL/00506/2024-2025 | 21/08/2024 | S & P ENTERPRISE | ORD/000212/2023-2024 | 2823/MD | 07/08/2023 | Construction of Different Capacity R.C.C. Over Head Reservoir Over Pile / Raft Foundation including sub soil investigation works for Construction of Over Head Reservoir with laying distribution system, Sinking of Tube Well, Pump House, Boundary Wall & P | 44.33 | BP-2024-25-290 | 22/08/2024 | VCH/000265/2024-2025 |
135 | Midnapore Division | BILL/00519/2024-2025 | 23/08/2024 | M/S. D.K.H.CONSTRUCTION | ORD/000052/2023-2024 | 1435/MD | 04/05/2023 | Laying distribution pipe line, Pump House, Boundary wall & Accommodate FHTC (450 nos.) under JJM with allied work for Piasala & its adjoining mouzas PWSS in Garbeta-II block including supply of all labour & materials within Midnapore Sadar Sub-Division | 30.50 | BP-2024-25-302 | 27/08/2024 | VCH/000292/2024-2025 |
136 | Midnapore Division | BILL/00526/2024-2025 | 27/08/2024 | SUJATA CONSTRUCTION | ORD/000037/2023-2024 | 1340/MD | 28/04/2023 | Construction of different capacity R.C.C. Over Head Reservoir Pile / Raft Foundation works with Laying rising main, Distribution system, Sinking of Tube well, Pump House, Boundary Wall & Providing Functional Household Tap Connection (1,137 Nos.) includin | 77.52 | BP-2024-25-307 | 28/08/2024 | VCH/000297/2024-2025 |
137 | Midnapore Division | BILL/00531/2024-2025 | 29/08/2024 | SUJATA CONSTRUCTION | ORD/000640/2022-2023 | 577/MD | 23/02/2023 | Sinking of Tube Well, Laying distribution pipe line, Pump House, Boundary Wall, Soil investigation, 200 cum OHR (Intze type with pile foundation) & Accommodate FHTC (1396 Nos.) under JJM with allied work for Kuran PWSS in Ghatal Block including supp | 16.75 | BP-2024-25-315 | 02/09/2024 | VCH/000306/2024-2025 |
138 | Midnapore Division | BILL/00184/2024-2025 | 03/06/2024 | SK REAJUL HOSSAIN | ORD/000465/2023-2024 | 5359/MD | 30/11/2023 | Laying pipe line to provide balance FHTC under JJM in DHARMA PWSS under Ghatal Sub-Division in the District of Paschim Medinipur | 6.49 | BP-2024-25-137 | 07/06/2024 | VCH/000107/2024-2025 |
139 | Midnapore Division | BILL/00231/2024-2025 | 13/06/2024 | GOBINDA MAITY | ORD/000205/2023-2024 | 2821/MD | 07/08/2023 | Construction of Different Capacity R.C.C Over Head Reservoir Over Pile / Raft Foundation works for Construction of Over Head Reservoir with Laying distribution system, Sinking of Tube Well, Pump House, Boundary wall & Providing Functional Household Tap C | 328.01 | 2215162 | 21/06/2024 | VCH/000280/2024-2025 |
140 | Midnapore Division | BILL/00240/2024-2025 | 14/06/2024 | S.N ENTERPRISE | ORD/000466/2022-2023 | 2186/MD | 01/11/2022 | Sinking of 200 mm x 100 mm dia. X 156 Mtr. Depth Rig bored Tube wells at 2nd Tube well site with Laying of uPVC (Class-III) & DI pipeline with FHTC works, Construction of 3.60 Mtr. X 3.00 Mtr. Switch Room & Boundary wall, Laying of Rising main at 2nd T/W | 18.23 | BP-2024-25-161 | 19/06/2024 | VCH/000122/2024-2025 |
141 | Midnapore Division | BILL/00253/2024-2025 | 21/06/2024 | SUJATA CONSTRUCTION | ORD/000640/2022-2023 | 577/MD | 23/02/2023 | Sinking of Tube Well, Laying distribution pipe line, Pump House, Boundary Wall, Soil investigation, 200 cum OHR (Intze type with pile foundation) & Accommodate FHTC (1396 Nos.) under JJM with allied work for Kuran PWSS in Ghatal Block including supp | 23.34 | BP-2024-25-170 | 24/06/2024 | VCH/000129/2024-2025 |
142 | Midnapore Division | BILL/00257/2024-2025 | 24/06/2024 | UTSAV AGENCY | ORD/000458/2023-2024 | 5400/MD | 05/12/2023 | Collection of drinking water samples through facilitator & uploading charges of field data related to Water Quality Monitoring & Surveillance within Kharagpur Sub-Division under Jal Jeevan Mission. [For the period of 12 (Twelve) months] | 5.49 | BP-2024-25-179 | 02/07/2024 | VCH/000268/2024-2025 |
143 | Midnapore Division | BILL/00328/2024-2025 | 10/07/2024 | SANKAR PRASAD MAITY | ORD/000786/2023-2024 | 508/MD | 27/02/2024 | Retrofitting to accommodate balance FHTC including supplying, laying, fitting, fixing pipe with all necessary specials, saddle piece etc. all complete for Bural (Zone-I) W/S Scheme (Village - Bural, Sitalda) under JJM within Sabang Dev. Block under Kharag | 11.25 | BP-2024-25-199 | 15/07/2024 | VCH/000167/2024-2025 |
144 | Midnapore Division | BILL/00329/2024-2025 | 10/07/2024 | MADE AND TRADE CO. | ORD/000208/2023-2024 | 2824/MD | 07/08/2023 | Construction of 150 Cum, 200 Cum & 250 Cum Capacity R.C.C Over Head Reservoir Over (Intze type with solid raft) works with Laying of Rising Main, Distribution system, Sinking of Tube Well, Pump House & Providing Functional Household Tap Connection (5061 N | 165.15 | BP-2024-25-205 | 15/07/2024 | VCH/000172/2024-2025 |
145 | Midnapore Division | BILL/00107/2024-2025 | 13/05/2024 | TAPAS SANTRA | ORD/000274/2023-2024 | 3275/MD | 13/09/2023 | Sinking of Tube Well, Laying distribution pipe line, Pump House, Boundary Wall, Soil investigation, 500 Cum OHR (Intze type with Pile foundation) & Accommodate FHTC (3,567 nos.) under JJM with allied work including 02 (Tow) Years Operation & Maintenance | 546.58 | BP-2024-25-80 | 17/05/2024 | VCH/000077/2024-2025 |
146 | Midnapore Division | BILL/00391/2024-2025 | 05/08/2024 | MIDNAPUR PIPE CONCERN | ORD/000389/2023-2024 | 5063/MD | 26/10/2023 | Sinking of Tube Well ,Laying distribution pipe line, Pump House , Boundary Wall, soil investigation , 300 Cum OHR (Intze type with Pile foundation) & Accommodate FHTC (1946 nos.) under JJM with allied work including 02(Two )Years Operation & Mainten | 97.25 | BP-2024-25-258 | 08/08/2024 | VCH/000242/2024-2025 |
147 | Midnapore Division | BILL/00462/2024-2025 | 13/08/2024 | BADAL CHANDRA MAIKAP | ORD/000041/2022-2023 | 211/AE/KSD | 29/04/2022 | Distribution Pipeline at Murarichak, Markanda Chak, Chakmadhab, Kalidahachara within Nonamadhabchak & its adjoining mouzas water supply Scheme at Sabang Block under Kharagpur Sub Division within Midnapore Division, P.H.E.Dte. | 4.71 | BP-2024-25-280 | 20/08/2024 | VCH/000215/2024-2025 |
148 | Midnapore Division | BILL/00402/2024-2025 | 07/08/2024 | KISHORE GHOSH | ORD/000291/2023-2024 | 3908/MD | 27/09/2023 | Sinking of Tube Well, Laying distribution pipe line, Pump House, Boundary Wall, Soil investigation, 300 cum OHR (Intze type with pile foundation) & Accommodate FHTC (2,175 nos.) under JJM with allied work for Ranjapur PWSS in Ghatal Block including su | 14.33 | BP-2024-25-264 | 09/08/2024 | VCH/000246/2024-2025 |
149 | Midnapore Division | BILL/00408/2024-2025 | 08/08/2024 | SAI TUBE CO. | ORD/000062/2023-2024 | 2416/MD | 13/07/2023 | Sinking of Tube Well ,Laying distribution pipe line, Pump House , Boundary Wall soil investigation , 150 cum OHR (Intze type with pile foundation) & Accommodate FHTC (803 nos) under JJM with allied work for Ramchandrapur PWSS in Daspur- I Block inclu | 38.15 | BP-2024-25-270 | 13/08/2024 | VCH/000250/2024-2025 |
150 | Midnapore Division | BILL/00095/2024-2025 | 06/05/2024 | ASHIM KUMAR DEY | ORD/000211/2020-2021 | 1431/MD | 26/11/2020 | Retrofitting to accommodate FHTC under JJM in Chhotokhelna W/S Scheme, Block: - Pingla, District: - Paschim Medinipur within Midnapore Division, PHE Dte. | 5.11 | BP-2024-25-111 | 30/05/2024 | VCH/000092/2024-2025 |
151 | Midnapore Division | BILL/00123/2024-2025 | 15/05/2024 | SWACH ENVIRONMENT PRIVATE LIMITED | ORD/000397/2023-2024 | 5090/MD | 30/10/2023 | Sinking of Tube Well, Laying distribution pipe line, Pump House, Boundary Wall, Soil investigation, 450 cum OHR (Intze type with pile foundation) & Accommodate FHTC (2,335 nos.) under JJM with allied work for Makarampur PWSS in Daspur- I Block includi | 79.34 | BP-2024-25-88 | 17/05/2024 | VCH/000083/2024-2025 |
152 | Midnapore Division | BILL/00124/2024-2025 | 15/05/2024 | NIRMAL UDYOG | ORD/000559/2023-2024 | 5513/MD | 15/12/2023 | Sinking of Tube Well, Construction of 250 Cum OHR including Soil Investigation, Laying distribution pipe line, Pump House, Boundary wall for Augmentation of Barisha (Zone-II) PWSS in Pingla Block including supply of all labour & materials within Kharagp | 15.47 | BP-2024-25-86 | 17/05/2024 | VCH/000082/2024-2025 |
153 | Midnapore Division | BILL/00128/2024-2025 | 16/05/2024 | DIPAK KUMAR DOLAI | ORD/000045/2022-2023 | 838/MD | 02/05/2022 | Laying distribution pipe line, soil test, FHTC & construction of R.C.C. Over Head Reservoir of capacity 300 Cum and staging height 20.00 mtr. with allied work for Gobindanagar W/S Scheme in Daspur-I Block including supply of all labour & materials withi | 21.33 | BP-2024-25-85 | 17/05/2024 | VCH/000081/2024-2025 |
154 | Midnapore Division | BILL/00147/2024-2025 | 27/05/2024 | MANISHIKA CONSTRUCTION | ORD/000682/2021-2022 | 281/MD | 15/02/2022 | Sinking of 1 (One) No. Replacement tube well including allied works for Retrofitting of Ground Water Based Sutkujhuri PWSS to accommodate FHTC under JJM under Garhbeta-II block in Paschim Medinipur District under Midnapore Division, P.H.E. Dte. | 0.17 | BP-2024-25-109 | 30/05/2024 | VCH/000090/2024-2025 |
155 | Midnapore Division | BILL/00292/2024-2025 | 28/06/2024 | DIPAK KUMAR BAKLY | ORD/000249/2023-2024 | 3102/MD | 25/08/2023 | Sinking of Tube Well, Laying distribution pipe line, Pump House , Boundary Wall, Soil investigation, 450 cum OHR (Intze type with pile foundation) & Accommodate FHTC (2,796 nos.) under JJM with allied work for Shilarajnagar PWSS in Ghatal Block inclu | 115.47 | BP-2024-25-186 | 08/07/2024 | VCH/000160/2024-2025 |
156 | Midnapore Division | BILL/00353/2024-2025 | 23/07/2024 | M/S. A.R. ENTERPRISE. | ORD/000280/2023-2024 | 3842/MD | 21/09/2023 | Sinking of Tube Well, Laying distribution pipe line, Pump House, Boundary Wall, Soil investigation, 500 cum OHR (Intze type with pile foundation) & Accommodate FHTC (3,366 nos.) under JJM with allied work for Ghoshpur PWSS in Keshpur Block including s | 135.65 | BP-2024-25-220 | 26/07/2024 | VCH/000188/2024-2025 |
157 | Midnapore Division | BILL/00360/2024-2025 | 24/07/2024 | PULLOCK KUMAR GHOSH | ORD/001076/2022-2023 | 109/AE/GSD | 13/02/2023 | Retrofitting to accommodate FHTC under JJM at different places for Srinagar PWSS & its adjoining mouzas ( Phase -III) Under ChandraKona - I & II Block within Midnapore Division, PHE Dte.( Srinagar Madhya para) | 0.40 | BP-2024-25-228 | 29/07/2024 | VCH/000196/2024-2025 |
158 | Midnapore Division | BILL/00366/2024-2025 | 26/07/2024 | PULLOCK KUMAR GHOSH | ORD/000223/2022-2023 | 1730/MD | 23/08/2022 | Construction & Commissioning including FHTC (Civil Part) with 3 (three) months trial run for proposed Mini Pipe W/S Scheme for Mouza - Bhagirathpur (Zone-II), Block: - Ghatal, District: - Paschim Midnapore under Midnapore Division, PHE Dte. | 1.68 | BP-2024-25-237 | 30/07/2024 | VCH/000204/2024-2025 |
159 | Midnapore Division | BILL/00375/2024-2025 | 26/07/2024 | SARBIK GRAM BIKASH KENDRA | null | 808/RWS/MID | 15/07/2024 | Remuneration bill of NGO Managed Laboratory for the month of April 2024 to June 2024. | 1.35 | BP-2024-25-250 | 05/08/2024 | VCH/000234/2024-2025 |
160 | Midnapore Division | BILL/00523/2024-2025 | 27/08/2024 | ANUSKA ENTERPRISE | ORD/000047/2022-2023 | 840/MD | 02/05/2022 | Retrofitting of Shimulia PWSS to accommodate FHTC in Ghatal block under Midnapore Division, P.H.E. Dte. | 4.90 | BP-2024-25-309 | 28/08/2024 | VCH/000299/2024-2025 |
161 | Midnapore Division | BILL/00158/2024-2025 | 27/05/2024 | DEVJYOTI BERA | ORD/000766/2022-2023 | 149/AE/GSD | 21/02/2023 | Retrofitting to accommodate Additional FHTC including supplying, laying, fitting, fixing of 15mm dia. NB PVC(Sch-80)/20mm dia. HDPE(PE-100, PN-16) Pipe with all necessary specials, saddle piece etc. all complete including cost of all materials under JJM o | 3.55 | BP-2024-25-150 | 12/06/2024 | VCH/000115/2024-2025 |
162 | Midnapore Division | BILL/00174/2024-2025 | 03/06/2024 | DULAL CHANDRA DAS | ORD/000331/2022-2023 | 1892/MD | 12/09/2022 | Rejuvenation of Ground Water Based Piped Water Supply Scheme for Barsahara (Part) to Accommodate FHTC under JJM at Sabang Block in Paschim Medinipur District under Midnapore Division, PHE Dte. | 49.21 | BP-2024-25-125 | 05/06/2024 | VCH/000102/2024-2025 |
163 | Midnapore Division | BILL/00244/2024-2025 | 19/06/2024 | SANJIT SINHA | ORD/000007/2023-2024 | 976/MD | 10/04/2023 | Laying distribution pipe line and Accommodate FHTC (316 Nos.) under JJM with allied work for Proposed Chhoto Nakdana & its adjoining mouzas PWSS, Block-Garhbeta-II Dist:- Paschim Medinipore under Midnapore Division PHE Dte. [PART-III] | 26.56 | BP-2024-25-166 | 20/06/2024 | VCH/000125/2024-2025 |
164 | Midnapore Division | BILL/00260/2024-2025 | 24/06/2024 | M/S. D.K.H.CONSTRUCTION | ORD/000231/2023-2024 | 2955/MD | 17/08/2023 | Sinking of Tube Well, Laying distribution pipe line, Rising Main, Pump House, Boundary Wall, Soil investigation, Construction of 400 Cum OHR (Intze type with Pile Foundation) & Accommodate FHTC (2,882 Nos.) including Two years O&M under JJM with allied | 98.45 | BP-2024-25-174 | 01/07/2024 | VCH/000152/2024-2025 |
165 | Midnapore Division | BILL/00320/2024-2025 | 10/07/2024 | M/S. D.K.H.CONSTRUCTION | ORD/000181/2023-2024 | 2721/MD | 31/07/2023 | Sinking of Tube well, Laying distribution pipe line, Pump House, Boundary wall & Balance FHTC (2835 Nos.) under JJM with allied work for Augmentation of Srinagar Pipe W/S Scheme in Chandrakona-I Block including supply of all labour & materials within Ght | 47.50 | BP-2024-25-202 | 15/07/2024 | VCH/000168/2024-2025 |
166 | Midnapore Division | BILL/00457/2024-2025 | 13/08/2024 | GOBINDA MAITY | ORD/000948/2022-2023 | 728/A/AE/KSD | 10/11/2022 | Training Programme in connection with skilling of Man power to Generate Employment Oppurtunities and to support implimentation of Jal Jeevan Mission Programme at different Places within Midnapore Division P.H.E Dte. (Part-B) ( PINGLA- Block) | 0.51 | BP-2024-25-285 | 21/08/2024 | VCH/000261/2024-2025 |
167 | Midnapore Division | BILL/00401/2024-2025 | 07/08/2024 | M/S. D.K.H.CONSTRUCTION | ORD/000633/2023-2024 | 5562/MD | 26/12/2023 | Laying distribution pipeline, Rising main, Accommodate FHTC (1140 Nos.) including 2yrs. O & M under JJM with allied work for Jhakra PWSS in Chandrakona-II block including supply of all labour & materials within Ghatal Sub-Division under Midnapore Division | 67.16 | BP-2024-25-266 | 09/08/2024 | VCH/000269/2024-2025 |
168 | Midnapore Division | BILL/00052/2024-2025 | 16/04/2024 | GOBINDA MAITY | ORD/000007/2022-2023 | 217/AE/KSD | 29/04/2022 | Accomdation of FHTC under JJM for the leftout Portion of Jamna Water Supply Scheme catchment area as per site reconnaissance, Block: - Pingla , within Midnapore Division, P.H.E. Dte. District: - Paschim Midnapore. | 3.73 | BP-2024-25-69 | 01/05/2024 | VCH/000071/2024-2025 |
169 | Midnapore Division | BILL/00063/2024-2025 | 16/04/2024 | KRISHNENDU SEKHAR DAS | ORD/000955/2022-2023 | 761/B/AE/KSD | 22/11/2022 | Training Programme in connection with skilling of Man power to Generate Employment Oppurtunities and to support implimentation of Jal Jeevan Mission Programme at different Places within Midnapore Division P.H.E Dte. (Part-B) ( DANTAN-I Block) | 0.51 | BP-2024-25-68 | 01/05/2024 | VCH/000141/2024-2025 |
170 | Midnapore Division | BILL/00064/2024-2025 | 16/04/2024 | KRISHNENDU SEKHAR DAS | ORD/000954/2022-2023 | 761/A/AE/KSD | 22/11/2022 | Training Programme in connection with skilling of Man power to Generate Employment Oppurtunities and to support implimentation of Jal Jeevan Mission Programme at different Places within Midnapore Division P.H.E Dte. (Part-A) ( DANTAN-I Block) | 0.70 | BP-2024-25-67 | 01/05/2024 | VCH/000142/2024-2025 |
171 | Midnapore Division | BILL/00094/2024-2025 | 03/05/2024 | M/S. BLUE BIRD | ORD/000144/2023-2024 | 2628/MD | 24/07/2023 | Accommodate FHTC (218 Nos.) & Construction of Boundary wall under JJM with allied work for Amlasuli & its adjoining mouzas W/S Scheme in Garbeta-II block including supply of all labour & materials within Midnapore Sadar Sub-Division under Midnapore Divisi | 13.10 | BP-2024-25-71 | 07/05/2024 | VCH/000072/2024-2025 |
172 | Midnapore Division | BILL/00121/2024-2025 | 15/05/2024 | KISHORE GHOSH | ORD/000198/2023-2024 | 2812/MD | 07/08/2023 | Sinking of Tube well, Laying distribution pipe line, Pump House, Boundary wall & Balance FHTC (325) for Augmentation of Ranapur PWSS in Daspur-I block including supply of all labour & materials within Ghatal Sub-Division under Midnapore Division, PHE Dte. | 7.55 | BP-2024-25-78 | 17/05/2024 | VCH/000038/2024-2025 |
173 | Midnapore Division | BILL/00122/2024-2025 | 15/05/2024 | BENGAL TRADERS | ORD/000845/2023-2024 | 806/MD | 15/03/2024 | Construction of 1 (One) No. 5.40 X 3.60 Mtr. Switch Room cum Chlorine Room with W.C. & Bath for Augmentation of Khairullachak & its adjoining mouzas PWSS in block - Midnapore Sadar, District - Paschim Medinipur (Type-B). | 5.22 | BP-2024-25-89 | 17/05/2024 | VCH/000084/2024-2025 |
174 | Midnapore Division | BILL/00133/2024-2025 | 20/05/2024 | COMPUTER CITY | null | 511687747787034 | 28/11/2023 | Supply & delivery of hp Intel Core i5 14 inch Laptops Nine pieces, Epson Multi functional Machines 6 pieces, and HP intel core i3 12100 8GB/0 GB HDD/Windows | 11.92 | 2215181 | 31/05/2024 | VCH/000133/2024-2025 |
175 | Midnapore Division | BILL/00140/2024-2025 | 24/05/2024 | ASHIM KUMAR DEY | ORD/000783/2023-2024 | 1176/AE/MSSD | 29/02/2024 | Hiring of 1 ( one) no Motor Cab ( standard ) Commercial with Catalytic Converter attachment with Bharat stage as per prevalent applicable standard compliant new / not old than 30 ( Thirty ) months from the date of 1st. registration on daily hire rate basi | 0.40 | BP-2024-25-134 | 06/06/2024 | VCH/000028/2024-2025 |
176 | Midnapore Division | BILL/00141/2024-2025 | 24/05/2024 | ASHIM KUMAR DEY | ORD/000783/2023-2024 | 1176/AE/MSSD | 29/02/2024 | Hiring of 1 ( one) no Motor Cab ( standard ) Commercial with Catalytic Converter attachment with Bharat stage as per prevalent applicable standard compliant new / not old than 30 ( Thirty ) months from the date of 1st. registration on daily hire rate basi | 0.40 | BP-2024-25-134 | 06/06/2024 | VCH/000029/2024-2025 |
177 | Midnapore Division | BILL/00204/2024-2025 | 06/06/2024 | M/S. D.K.H.CONSTRUCTION | ORD/000230/2023-2024 | 2954/MD | 17/08/2023 | Sinking of Tube Well, Laying distribution pipe line, Rising Main, Pump House, Boundary Wall, Soil investigation, Construction of 400 Cum (Intze type with Pile Foundation) & Accommodate FHTC (3,208 Nos.) including Two years O&M under JJM with allied work | 234.64 | BP-2024-25-149 | 11/06/2024 | VCH/000114/2024-2025 |
178 | Midnapore Division | BILL/00205/2024-2025 | 06/06/2024 | DIAMOND ENGINEERS CO-OPERATIVE SOCIETY LTD. | ORD/000247/2023-2024 | 3054/MD | 23/08/2023 | Sinking of Tube Well, Laying of Rising Main, Laying distribution pipe line, Pump House, 300 cum OHR (Intze type with solid raft) & Accommodate FHTC (1,763 Nos.) including 2 years operation & maintenance under JJM with allied work for Malighati & its adjo | 15.21 | BP-2024-25-142 | 11/06/2024 | VCH/000110/2024-2025 |
179 | Midnapore Division | BILL/00298/2024-2025 | 02/07/2024 | GOBINDA MAITY | ORD/000211/2023-2024 | 2826/MD | 07/08/2023 | Construction of Different Capacity R.C.C Over Head Reservoir Over Pile / Raft Foundation works for Construction of Over Head Reservoir with laying distribution system , Sinking of Tube Well , Pump House, Boundary Wall, laying of Rising Main & Providing | 80.80 | BP-2024-25-194 | 09/07/2024 | VCH/000165/2024-2025 |
180 | Midnapore Division | BILL/00381/2024-2025 | 31/07/2024 | R. CONSTRUCTION | ORD/000421/2023-2024 | 5157/MD | 07/11/2023 | Laying Distribution pipeline & Accommodate FHTC (300 Nos.) under JJM with allied work for Tangasol (Zone-I) & its adjoining mouzas W/S Scheme in Kharagpur-I block including supply of all labour & materials within Kharagpur Sub-Division under Midnapore Div | 44.01 | BP-2024-25-241 | 05/08/2024 | VCH/000236/2024-2025 |
181 | Midnapore Division | BILL/00383/2024-2025 | 31/07/2024 | GOBINDA MAITY | ORD/000094/2023-2024 | 2466/MD | 14/07/2023 | Sinking of Tube Well, Laying distribution pipe line, Rising main, Pump House, Boundary wall, Soil investigation, Construction of 450 (Intze type with pile foundation) & 250 & 400 cum OHRs (Intze type with solid raft) & Accommodate FHTC (6,370 Nos.) inclu | 126.38 | BP-2024-25-244 | 05/08/2024 | VCH/000276/2024-2025 |
182 | Midnapore Division | BILL/00446/2024-2025 | 13/08/2024 | MIDNAPUR PIPE CONCERN | ORD/000488/2021-2022 | 2181/MD | 17/12/2021 | Construction & Commissioning including FHTC (Civil Part) with 3 (three) months trial run for proposed Mini Pipe W/S Scheme for Mouza - Talda, Block - Sabang, District - Paschim Medinipur under Midnapore Division, PHE Dte. | 6.78 | 24-25-287,288 | 22/08/2024 | VCH/000263/2024-2025 |
183 | Midnapore Division | BILL/00447/2024-2025 | 13/08/2024 | WBSEDCL | null | 2004852919/Quot/03 | 08/08/2024 | ELECTRIC QUOTATION BILL FOR TW NO-I OF JAHALDA PWSS. REF CONSUMER ID-204373753, APPLICATION NO-2004852919, APPLICATION TYPE-NEW CONNECTION, NAME OF CCC-KHAKURDA CCC, NAME OF BLOCK-DANTAN-II | 13.22 | BP-2024-25-294 | 27/08/2024 | VCH/000284/2024-2025 |
184 | Midnapore Division | BILL/00504/2024-2025 | 21/08/2024 | KISHORE GHOSH | ORD/000278/2023-2024 | 3821/MD | 20/09/2023 | Sinking of Tube Well, Laying distribution pipe line, Pump House, Boundary Wall, Soil investigation, 350 cum OHR (Intze type with pile foundation) & Accommodate FHTC (1,783 nos.) under JJM with allied work for Sagarpur PWSS in Daspur- I Block including | 16.22 | BP-2024-25-293 | 22/08/2024 | VCH/000275/2024-2025 |
185 | Midnapore Division | BILL/00505/2024-2025 | 21/08/2024 | M/S. KAMAK ENGINEERS AND CO. | ORD/000470/2023-2024 | 5382/MD | 04/12/2023 | Construction of 200 Cum & 300 Cum Capacity R.C.C Over Head Reservoir Over Pile / Raft Foundation works with laying rising main, distribution system, Sinking of Tube Well, Pump House & Providing Functional Household Tap Connection (4,806 Nos.) including 2 | 222.52 | BP-2024-25-291 | 22/08/2024 | VCH/000274/2024-2025 |
186 | Midnapore Division | BILL/00155/2024-2025 | 27/05/2024 | DULAL CHANDRA DAS | ORD/000538/2022-2023 | 2607/MD | 20/12/2022 | Construction of Boundary wall & bypass pipeline (CI/DI) & allied works at 1st Tube well site or Head works site for Chandipur W/S Scheme within Daspur-I block under Midnapore Division, PHE Dte. | 3.99 | BP-2024-25-113 | 30/05/2024 | VCH/000093/2024-2025 |
187 | Midnapore Division | BILL/00157/2024-2025 | 27/05/2024 | DULAL CHANDRA DAS | ORD/000206/2022-2023 | 1671/MD | 12/08/2022 | Rejuvenation of Ground Water Based Piped Water Supply Scheme for Chandkuri (Zone-I) (Part) to Accommodate FHTC under JJM at Sabang Block in Paschim Medinipur District under Midnapore Division, PHE Dte. | 33.21 | BP-2024-25-123 | 05/06/2024 | VCH/000100/2024-2025 |
188 | Midnapore Division | BILL/00163/2024-2025 | 28/05/2024 | DULAL CHANDRA DAS | ORD/000030/2023-2024 | 947/MD | 06/04/2023 | Sinking of Tube well, Laying distribution pipe line, Pump House, Boundary wall, Soil investigation, Construction of 400 CuM OHR (Intze type with Pile Foundation) & Accommodate FHTC (2,576 Nos.) under JJM with allied works for Kalagram PWSS in Keshpur Blo | 165.93 | BP-2024-25-114 | 30/05/2024 | VCH/000094/2024-2025 |
189 | Midnapore Division | BILL/00176/2024-2025 | 03/06/2024 | M/S. D.K.H.CONSTRUCTION | ORD/000008/2020-2021 | 912/MD | 25/08/2020 | Laying Distribution system, Construction of community tank with soak well, inter connection etc. with all allied works including 1 (One) year periodic operation & maintenance as & when required within Midnapore Sadar Block in following 3 nos. sites / plac | 1.20 | BP-2024-25-119 | 05/06/2024 | VCH/000030/2024-2025 |
190 | Midnapore Division | BILL/00236/2024-2025 | 14/06/2024 | S & P ENTERPRISE | ORD/000210/2023-2024 | 2827/MD | 07/08/2023 | Construction of Different Capacity R.C.C Over Head Reservoir Over Pile / Raft Foundation including sub soil investigation works for Construction of Over Head Reservoir with laying distribution system, Sinking of Tube Well, Pump House, Boundary Wall & Pro | 173.51 | 2215143 | 01/07/2024 | VCH/000217/2024-2025 |
191 | Midnapore Division | BILL/00237/2024-2025 | 14/06/2024 | SWACH ENVIRONMENT PRIVATE LIMITED | ORD/000290/2023-2024 | 5049/MD | 25/10/2023 | Sinking of Tube Well, Construction of Different Capacity R.C.C Over Head Reservoir Over Pile / Raft Foundation including sub soil investigation works for Construction of Over Head Reservoir with laying distribution system, Pump House, Boundary Wall & Pro | 436.20 | BP-2024-25-155 | 18/06/2024 | VCH/000120/2024-2025 |
192 | Midnapore Division | BILL/00243/2024-2025 | 19/06/2024 | A.K. SIKDAR | ORD/000433/2023-2024 | 5189/MD | 08/11/2023 | Laying distribution pipe line & Accommodate FHTC (200 Nos.) under JJM with allied work for Bulanpur & its adjoining mouzas W/S Scheme in Garbeta-II block including supply of all labour & materials within Midnapore Sadar Sub-Division under Midnapore Divisi | 28.95 | BP-2024-25-164 | 20/06/2024 | VCH/000124/2024-2025 |
193 | Midnapore Division | BILL/00254/2024-2025 | 21/06/2024 | SUBRATA KUMAR BERA | ORD/000642/2022-2023 | 579/MD | 23/02/2023 | Construction & commissioning of RCC Over Head Reservoir (Torch type with solid raft) of capacity 150 cum & staging height 20 mtr. as per approved drawing (No:- PC-I /OHR /10/15/2012) with allied works for Paschim Beguni & its adjoining mouzas W/S Scheme w | 8.05 | BP-2024-25-172 | 24/06/2024 | VCH/000131/2024-2025 |
194 | Midnapore Division | BILL/00303/2024-2025 | 04/07/2024 | DULAL CHANDRA DAS | ORD/000816/2023-2024 | 650/MD | 07/03/2024 | Construction and commissioning of RCC Over Head Reservoir (Intze type with solid raft) of capacity 200 cum and staging height 20 mtr. as per approved drawing (No: - PC-I/OHR/9/2012) with allied works including supply of all labour and materials for SAHAPU | 17.67 | BP-2024-25-191 | 08/07/2024 | VCH/000163/2024-2025 |
195 | Midnapore Division | BILL/00332/2024-2025 | 11/07/2024 | ANIRUDDHA BAG | ORD/000387/2023-2024 | 5061/MD | 26/10/2023 | Construction of 150 Cum & 100 Cum Capacity R.C.C Over Head Reservoir (Intze type with solid raft) with laying rising main, distribution system, Sinking of Tube Well, Pump House & Providing Functional Household Tap Connection (1904 Nos) including 2 years o | 197.42 | BP-2024-25-208 | 15/07/2024 | VCH/000278/2024-2025 |
196 | Midnapore Division | BILL/00333/2024-2025 | 11/07/2024 | RMN INFRASTRUCTURES LIMITED | ORD/000282/2023-2024 | 5091/MD | 30/10/2023 | Construction of Different Capacity R.C.C Over Head Reservoir Over Pile / Raft Foundation including Sub-Soil investigation works for Construction of Over Head Reservoir with laying distribution system, Sinking of Tube Well, Pump House, Boundary Wall & Pro | 1,326.82 | 24-25-210,233 | 30/07/2024 | VCH/000182/2024-2025 |
197 | Midnapore Division | BILL/00393/2024-2025 | 05/08/2024 | ARUNALOY SCIENTIFIC HOUSE | ORD/000043/2024-2025 | 2271/MD | 23/07/2024 | Providing enhanced remuneration of laboratory personnel as arrear payment icw Regular analysis, Testing and Monitoring of water samples by experienced & trained personnel for Water Testing Laboratory activities of 1 No. District Laboratory & 10 Nos. Sub-D | 16.66 | BP-2024-25-260 | 08/08/2024 | VCH/000271/2024-2025 |
198 | Midnapore Division | BILL/00398/2024-2025 | 07/08/2024 | GOBINDA MAITY | ORD/000229/2023-2024 | 2953/MD | 17/08/2023 | Sinking of Tube Well, Laying distribution pipe line, Pump House, Boundary Wall, Soil investigation, Construction of 500 & 600 cum OHR (Intze type with pile foundation) & Accommodate FHTC (5,406 nos.) under JJM with allied work for Gopalnagar & Kalara | 217.77 | BP-2024-25-263 | 09/08/2024 | VCH/000245/2024-2025 |
199 | Midnapore Division | BILL/00493/2024-2025 | 14/08/2024 | SHREE J . M . CONSTRUCTION | ORD/000021/2023-2024 | 945/MD | 05/04/2023 | Construction and commissioning of RCC Over Head Reservoir (Torch type with pile foundation) of capacity 150 cum and staging height 20 mtr. as per approved drawing (No:- PC-I /OHR /10/15/2012) with allied works for Warda & its adjoining mouzas W/S Scheme ( | 6.60 | BP-2024-25-308 | 28/08/2024 | VCH/000298/2024-2025 |
200 | Midnapore Division | BILL/00334/2024-2025 | 11/07/2024 | DULAL CHANDRA DAS | ORD/000009/2023-2024 | 1020/MD | 12/04/2023 | Laying distribution pipe line, Providing FHTC (2,538 Nos.), Soil test and Construction of R.C.C. Over Head Reservoir of capacity 250 Cum and staging height 20.00 mtr. with allied work under Augmentation of Belda Zone-I & its adjoining mouzas Water Suppl | 49.36 | BP-2024-25-203 | 15/07/2024 | VCH/000169/2024-2025 |
201 | Midnapore Division | BILL/00339/2024-2025 | 16/07/2024 | NATIONAL PROJECTS CONSTRUCTION CORPORATION LIMITED | ORD/000396/2023-2024 | 5070/MD | 26/10/2023 | Sinking of Tube Well, Laying distribution pipe line, Rising Main, Pump House, Boundary Wall, Soil investigation, Construction of Different Capacity OHR (Intze type with solid raft/ Pile Foundation) & Accommodate FHTC (11,004 Nos.) including Two years | 194.73 | BP-2024-25-218 | 23/07/2024 | VCH/000186/2024-2025 |
202 | Midnapore Division | BILL/00409/2024-2025 | 09/08/2024 | PULLOCK KUMAR GHOSH | ORD/000242/2023-2024 | 3097/MD | 25/08/2023 | Laying distribution pipe line & Accommodate FHTC (250 Nos.) under JJM with allied work for Karnagar PWSS in Salboni block including supply of all labour & materials within Midnapore Sadar Sub-Division under Midnapore Division, PHE Dte. [PART-B] | 15.58 | BP-2024-25-271 | 13/08/2024 | VCH/000251/2024-2025 |
203 | Midnapore Division | BILL/00127/2024-2025 | 15/05/2024 | BUNBA CONSTRUCTION | ORD/000095/2023-2024 | 2470/MD | 14/07/2023 | Laying distribution system pipe line & Accommodate FHTC (152 Nos.) under JJM with allied work for Hariatara PWSS (Zone-I) in Kharagpur-I block including supply of all labour & materials within Kharagpur Sub-Division under Midnapore Division, PHE Dte. [PAR | 21.45 | BP-2024-25-87 | 17/05/2024 | VCH/000052/2024-2025 |
204 | Midnapore Division | BILL/00135/2024-2025 | 21/05/2024 | M/S EAGLE TRADERS | null | GEMC-511687790952896 | 05/01/2024 | Supply & delivery of JBL Water Proof and Splash Proof and LED indicator and LED Display and Headphone jack and Mic and MP3 and FM and Memory Slot Woofer Bluetooth Speakers 1 Year Warranty - 1 Piece, HSN Code Measurem ent Unit GST UQ Name Mircrophones (Lap | 0.16 | 2215181 | 31/05/2024 | VCH/000134/2024-2025 |
205 | Midnapore Division | BILL/00145/2024-2025 | 27/05/2024 | SHAKEEL KHAN | ORD/000185/2022-2023 | 1484/MD | 26/07/2022 | Rejuvenation of Ground Water Based Water Supply Scheme of Khasbazar (Part) to accommodate FHTC under JJM within Debra Dev. Block under Kharagpur Sub-Division of Midnapore Division, P.H.E. Dte. Dist. Paschim Medinipur. | 12.55 | BP-2024-25-122 | 05/06/2024 | VCH/000099/2024-2025 |
206 | Midnapore Division | BILL/00190/2024-2025 | 04/06/2024 | GOBINDA MAITY | ORD/000453/2022-2023 | 2054/MD | 29/09/2022 | Engagement of 3 (Three) Nos. Laboratory Personnel (One Chemist, One Bacteriologist & One Laboratory Assistant) for regular analysis, testing and monitoring of water samples and others allied minor Mtc. works for Kharagpur Sub-District Laboratory within Kh | 3.71 | 2215181 | 12/06/2024 | VCH/000174/2024-2025 |
207 | Midnapore Division | BILL/00294/2024-2025 | 28/06/2024 | MASUM ALI KHAN | ORD/000506/2023-2024 | 5514/MD | 15/12/2023 | Sinking of Tube Well, Laying distribution pipe line, Pump House, Boundary Wall, Soil investigation, 500 cum OHR (Intze type with pile foundation) & Accommodate FHTC (2,144 nos.) under JJM with allied work for Suratpur PWSS in Daspur- I Block including sup | 42.86 | BP-2024-25-184 | 08/07/2024 | VCH/000158/2024-2025 |
208 | Midnapore Division | BILL/00352/2024-2025 | 23/07/2024 | WATER LINK | ORD/000150/2022-2023 | 1419/MD | 15/07/2022 | Construction & Commissioning including FHTC (Civil Part) with 3 (three) months trial run for proposed Mini Pipe W/S Scheme for Mouza - Raghunathpur (Zone-III), Block: - Ghatal, District: - Paschim Midnapore under Midnapore Division, PHE Dte. | 0.53 | BP-2024-25-229 | 29/07/2024 | VCH/000197/2024-2025 |
209 | Midnapore Division | BILL/00376/2024-2025 | 26/07/2024 | AJIJUR RAHAMAN MALLICK | ORD/000844/2023-2024 | 805/MD | 15/03/2024 | Laying distribution pipe line with Rising Main, Switch Room (3750 X 2550) along with PVC water storage OHR having capacity 20 Cum & St. Ht. 8.50 Mtr. erected over roof of Switch Room by M.S. fabricated structure, Development H/W site FHTC (117 Nos.) & 2 y | 15.02 | BP-2024-25-232 | 29/07/2024 | VCH/000200/2024-2025 |
210 | Midnapore Division | BILL/00379/2024-2025 | 26/07/2024 | M/S. S.S. ENTERPRISE | ORD/000514/2022-2023 | 2556/MD | 15/12/2022 | Sinking of Tube Well, Laying distribution pipe line, Pump House, Boundary wall, Soil investigation, 2 nos. 400 cum OHR (Intze type with pile foundation) & 3 Nos. 300 Cum OHR & Accommodate FHTC (10,944 Nos,) under JJM with allied work for (i) Chaip | 278.35 | BP-2024-25-230 | 29/07/2024 | VCH/000198/2024-2025 |
211 | Midnapore Division | BILL/00382/2024-2025 | 31/07/2024 | GOBINDA MAITY | ORD/000248/2023-2024 | 3101/MD | 25/08/2023 | Sinking of Tube wells, Construction of 400 CuM Capacity R.C.C Over Head Reservoirs (Over Raft / Pile Foundation) including Sub-Soil investigation works with Laying distribution system, Pump Houses, Boundary walls & Providing Functional Household Tap Con | 374.78 | BP-2024-25-242 | 05/08/2024 | VCH/000238/2024-2025 |
212 | Midnapore Division | BILL/00444/2024-2025 | 13/08/2024 | AJIJUR RAHAMAN MALLICK | ORD/000746/2020-2021 | 106/AE/MSSD | 26/02/2021 | Retrofitting to accommodate FHTC under JJM at Mouza Ukhla Purba Para in Ukhla PWSS in Garhbeta II Block in the District of Paschim Medinipore.(SL No-10) | 0.03 | BP-2024-25-283 | 21/08/2024 | VCH/000270/2024-2025 |
213 | Midnapore Division | BILL/00520/2024-2025 | 23/08/2024 | MIDNAPUR PIPE CONCERN | ORD/000102/2023-2024 | 2484/MD | 17/07/2023 | Laying distribution of Pipe line, Construction of Pump House, Boundary wall and FHTC work (440 Nos.) for Proposed Sasha Bedia & its adjoining mouzas PWSS, Block-Garhbeta-II, Dist:- Paschim Medinipore under Midnapur Division, PHE Dte. [PART-III] | 12.40 | BP-2024-25-304 | 27/08/2024 | VCH/000294/2024-2025 |
214 | Midnapore Division | BILL/00524/2024-2025 | 27/08/2024 | DIAMOND ENGINEERS CO-OPERATIVE SOCIETY LTD. | ORD/000246/2023-2024 | 3053/MD | 23/08/2023 | Sinking of Tube Well, Laying of Rising Main, Laying distribution pipe line, Pump House, 250 cum OHR (Intze type with solid raft) & Accommodate FHTC (1,745 Nos.) including 2 years operation & maintenance under JJM with allied work for Baguyan & its adjoini | 48.56 | BP-2024-25-306 | 28/08/2024 | VCH/000296/2024-2025 |
215 | Midnapore Division | BILL/01998/2023-2024 | 28/03/2024 | K & KABERI ENTERPRISE (PROP. GOUTAM MAITY) | ORD/000943/2022-2023 | 729/A/AE/KSD | 10/11/2022 | Training Programme in connection with skilling of Man power to Generate Employment Oppurtunities and to support implimentation of Jal Jeevan Mission Programme at different Places within Midnapore Division P.H.E Dte. (Part-B) ( Kharagpur-I Block) | 0.51 | BP-2023-24-444 | 31/07/2024 | VCH/001855/2023-2024 |
216 | Midnapore Division | BILL/00156/2024-2025 | 27/05/2024 | SAI TUBE CO. | ORD/000614/2022-2023 | 440/MD | 10/02/2023 | Rejuvenation of Ground Water Based Piped Water Supply Scheme for Adasimla (Part) to Accommodate FHTC under JJM at Sabang Block in Paschim Medinipur District under Midnapore Division, PHE Dte. | 0.12 | BP-2024-25-151 | 12/06/2024 | VCH/000117/2024-2025 |
217 | Midnapore Division | BILL/00164/2024-2025 | 29/05/2024 | RMN INFRASTRUCTURES LIMITED | ORD/000282/2023-2024 | 5091/MD | 30/10/2023 | Construction of Different Capacity R.C.C Over Head Reservoir Over Pile / Raft Foundation including Sub-Soil investigation works for Construction of Over Head Reservoir with laying distribution system, Sinking of Tube Well, Pump House, Boundary Wall & Pro | 1,670.48 | BP-2024-25-112 | 30/05/2024 | VCH/000147/2024-2025 |
218 | Midnapore Division | BILL/00256/2024-2025 | 23/06/2024 | PULLOCK KUMAR GHOSH | ORD/000040/2023-2024 | 1356/MD | 02/05/2023 | Sinking of Tube well, Laying distribution pipe line & accommodate FHTC (118 Nos.) including 2 years O&M under JJM with allied work for Augmentation of Amrakuchi & its adjoining mouzas W/S Scheme in Keshpur block including supply of all labour & materials | 17.09 | BP-2024-25-168 | 24/06/2024 | VCH/000127/2024-2025 |
219 | Midnapore Division | BILL/00103/2024-2025 | 10/05/2024 | RMN INFRASTRUCTURES LIMITED | ORD/000282/2023-2024 | 5091/MD | 30/10/2023 | Construction of Different Capacity R.C.C Over Head Reservoir Over Pile / Raft Foundation including Sub-Soil investigation works for Construction of Over Head Reservoir with laying distribution system, Sinking of Tube Well, Pump House, Boundary Wall & Pro | 2,297.80 | BP-24-25-73-95 | 17/05/2024 | VCH/000255/2024-2025 |
220 | Midnapore Division | BILL/00104/2024-2025 | 13/05/2024 | SAMIT PAL | ORD/000197/2023-2024 | 2811/MD | 07/08/2023 | Sinking of Tube well, Laying distribution pipe line, Pump House, Boundary wall & Balance FHTC (342) for Augmentation of Mulgram PWSS in Ghatal block including supply of all labour & materials within Ghatal Sub-Division under Midnapore Division, PHE Dte. | 7.52 | BP-2024-25-83 | 17/05/2024 | VCH/000079/2024-2025 |
221 | Midnapore Division | BILL/00105/2024-2025 | 13/05/2024 | AJITESH ACHARJEE | ORD/000046/2023-2024 | 1429/MD | 04/05/2023 | Construction of Pump House & Accommodate FHTC (150 Nos.) under JJM with allied work for Benucha & its adjoining mouzas W/S Scheme in Salbani block including supply of all labour & materials within Midnapore Sadar Sub-Division under Midnapore Division, PH | 4.32 | BP-2024-25-84 | 17/05/2024 | VCH/000080/2024-2025 |
222 | Midnapore Division | BILL/00108/2024-2025 | 13/05/2024 | GOBINDA MAITY | ORD/000248/2023-2024 | 3101/MD | 25/08/2023 | Sinking of Tube wells, Construction of 400 CuM Capacity R.C.C Over Head Reservoirs (Over Raft / Pile Foundation) including Sub-Soil investigation works with Laying distribution system, Pump Houses, Boundary walls & Providing Functional Household Tap Con | 502.08 | BP-2024-25-79 | 17/05/2024 | VCH/000022/2024-2025 |
223 | Midnapore Division | BILL/00386/2024-2025 | 01/08/2024 | D.C. RAKSHIT AND SONS INDIA PRIVATE LTD. | ORD/000359/2021-2022 | 1827/MD | 02/11/2021 | Laying distribution pipe line, Soil test & Construction of R.C.C. Over Head Reservoir of capacity 150 Cum and staging height 20.00 mtr. with allied work for Krishnapriya & its adjoining mouzas Water Supply Scheme within Pingla Block including supply of | 42.40 | BP-2024-25-257 | 07/08/2024 | VCH/000241/2024-2025 |
224 | Midnapore Division | BILL/00389/2024-2025 | 02/08/2024 | GOBINDA MAITY | ORD/000250/2023-2024 | 3145/MD | 29/08/2023 | Sinking of Tube Well, Laying distribution pipe line, Pump House, Boundary Wall, Soil investigation, 350 cum OHR (Intze type with pile foundation) & Accommodate FHTC (5,245 Nos.) under JJM with allied work for Augmentation of Daspur (Zone-I & Zone-II | 85.14 | BP-2024-25-251 | 06/08/2024 | VCH/000239/2024-2025 |
225 | Midnapore Division | BILL/00400/2024-2025 | 07/08/2024 | RMN INFRASTRUCTURES LIMITED | ORD/000282/2023-2024 | 5091/MD | 30/10/2023 | Construction of Different Capacity R.C.C Over Head Reservoir Over Pile / Raft Foundation including Sub-Soil investigation works for Construction of Over Head Reservoir with laying distribution system, Sinking of Tube Well, Pump House, Boundary Wall & Pro | 724.19 | BP-2024-25-267 | 09/08/2024 | VCH/000277/2024-2025 |
226 | Midnapore Division | BILL/00463/2024-2025 | 13/08/2024 | ASHIM KUMAR DEY | ORD/000052/2024-2025 | 2449/MD | 08/08/2024 | Laying of Rising main & interconnection pipeline for Amjor & its adjoining mouzas PWSS, Block - Garhbeta-II, District - Paschim Medinipur under Midnapore Division, PHE Dte. (Length - 675.00 Mtr.) | 3.13 | BP-2024-25-278 | 20/08/2024 | VCH/000257/2024-2025 |
227 | Midnapore Division | BILL/00406/2024-2025 | 08/08/2024 | DEBASISH DOGRA | ORD/000118/2023-2024 | 2518/MD | 18/07/2023 | Sinking of 3 (Three) Nos. Tube well for Rupnarayanpur & its adjoining mouzas (Zone-I) PWSS in Kharagpur-I block including supply of all labour & materials under Kharagpur Sub-Division of Midnapore Division, P.H.E. Dte. in Paschim Medinipur District. | 16.71 | BP-2024-25-274 | 14/08/2024 | VCH/000253/2024-2025 |
Total | 21,271.87 |