Sl. No. | Division
Working Divisions
|
Bill Number | Bill Date
Date of Issuance of the Work Order as per PHED-MIS
|
Vendor Name
Vendor Appointed Against this Work Order as per PHED-MIS
|
System Order Number
System generated Order No. for the Work Order as per PHED-MIS
|
Memo Number
Memo no. for Work Order Provided by the Divisions as per PHED-MIS
|
Order Date
Date of Issuance of the Work Order as per PHED-MIS
|
work_name
Name of the Work as per the Issued Work Order
|
Bill Gross Amount | Voucher Number | Voucher Date | System Voucher Number |
---|---|---|---|---|---|---|---|---|---|---|---|---|
0 | 7,623.94 | |||||||||||
1 | Midnapore Division | BILL/00001/2024-2025 | 03/04/2024 | GOBINDA MAITY | ORD/000064/2023-2024 | 2145/MD | 08/06/2023 | Construction of Different Capacity R.C.C Over Head Reservoir Over Pile / Raft Foundation works with laying rising main, distribution system , Sinking of Tube Well , Pump House , Boundary Wall, & Providing Functional Household Tap Connection (6348 Nos) in | 388.76 | BP-2024-25-3-7 | 04/04/2024 | VCH/000002/2024-2025 |
2 | Midnapore Division | BILL/01058/2023-2024 | 15/01/2024 | KISHORE GHOSH | ORD/000379/2022-2023 | 1962/MD | 20/09/2022 | Rejuvenation of Ground Water Based Piped Water Supply Scheme for Bishnupur (Part) to Accommodate FHTC under JJM at Sabang Block in Paschim Medinipur District under Midnapore Division, PHE Dte. | 33.13 | BP-2023-24-564 | 19/01/2024 | VCH/000880/2023-2024 |
3 | Midnapore Division | BILL/01087/2023-2024 | 17/01/2024 | GOBINDA MAITY | ORD/000635/2020-2021 | 442/MD. | 26/02/2021 | Supply and installation including Laying Distribution system, Construction of community tank with soak well, inter connection etc. with 1 (One) year operation & maintenance periodic as & when required of SOLAR POWER OPERATED A.C. Submersible Pumping Machi | 5.09 | BP-2023-24-580 | 25/01/2024 | VCH/000708/2023-2024 |
4 | Midnapore Division | BILL/01128/2023-2024 | 22/01/2024 | ASHIM KUMAR DEY | ORD/000307/2022-2023 | 1878/MD | 09/09/2022 | Construction of R.C.C. Over Head Reservoir of capacity 250 Cum and staging height 20.00 mtr., Pump House (5.40 mtr X 3.60 mtr), Boundary wall including Sinking of 250 X 200 mm dia. X 200 Mtr. depth deep Tube well & FHTC under JJM with allied work for AM | 22.50 | BP-2023-24-567 | 25/01/2024 | VCH/000720/2023-2024 |
5 | Midnapore Division | BILL/00962/2023-2024 | 08/12/2023 | UTSAV AGENCY | ORD/000149/2023-2024 | 212/RWS/MID | 17/05/2023 | SURVEY & COLLECTION OF DATA THROUGH MOBILE APP REGARDING AVAILABILITY OF DRINKING WATER, SANITATION FACILITIES & OTHER PARAMETERS IN PRIMARY, UPPER PRIMARY SCHOOLS, ANGANWADI CENTERS UNDER MEDINIPUR SADAR SUB DIVISION UNDER MIDNAPORE DIVISION PHE DTE | 0.73 | BP-2023-24-563 | 17/01/2024 | VCH/000862/2023-2024 |
6 | Midnapore Division | BILL/00964/2023-2024 | 08/12/2023 | UTSAV AGENCY | ORD/000152/2023-2024 | 217/RWS/MID | 26/05/2023 | Chemicals and other required items related to smooth functioning of NABL Recognition of Balichak Sub District Laboratory, under Midnapore Division PHE Dte. | 0.96 | BP-2023-24-557 | 17/01/2024 | VCH/000864/2023-2024 |
7 | Midnapore Division | BILL/00972/2023-2024 | 08/12/2023 | UTSAV AGENCY | ORD/000162/2023-2024 | 243/RWS/MID | 07/06/2023 | Chemicals and other required items related to smooth functioning of NABL Recognition of Five (Kharagpur, Balichak, Gharal, C.K. Town & Garhbeta) Sub District Laboratory, under Midnapore Division PHE Dte. | 0.66 | BP-2023-24-559 | 17/01/2024 | VCH/000866/2023-2024 |
8 | Midnapore Division | BILL/00974/2023-2024 | 08/12/2023 | UTSAV AGENCY | ORD/000150/2023-2024 | 211/RWS/MID | 17/05/2023 | Calibration of measuring instruments and other required items related to smooth functioning of NABL Accreditation of Medinipur District Water Testing Laboratory, under Midnapore Division PHE Dte. | 0.52 | BP-2023-24-549 | 17/01/2024 | VCH/000867/2023-2024 |
9 | Midnapore Division | BILL/01031/2023-2024 | 28/12/2023 | GARHBETA-1 UNEMPLOYED YOUTH ENGINEERS CO-OPERATIVE SOCIETY LTD. | ORD/000116/2023-2024 | 2517/MD | 18/07/2023 | Sinking of 2 (Two) Nos. Tube well for Amlasuli & its adjoining mouzas (Zone-I) PWSS in Garhbeta-II block including supply of all labour & materials under Midnapore Sadar Sub-Division of Midnapore Division, P.H.E. Dte. in Paschim Medinipur District. | 7.13 | BP-2023-24-518 | 04/01/2024 | VCH/000711/2023-2024 |
10 | Midnapore Division | BILL/01319/2023-2024 | 04/03/2024 | PALLIMANGAL GUCHHA SAMITY | null | 5114/MD | 01/11/2023 | Remuneration for the month of October 2023. | 0.14 | BP-2023-24-708 | 11/03/2024 | VCH/000957/2023-2024 |
11 | Midnapore Division | BILL/01321/2023-2024 | 04/03/2024 | SARBIK GRAM BIKASH KENDRA | null | 5114/MD | 01/11/2023 | Remuneration for the month of October 2023. | 0.14 | BP-2023-24-710 | 11/03/2024 | VCH/000959/2023-2024 |
12 | Midnapore Division | BILL/01324/2023-2024 | 04/03/2024 | PRITI ENTERPRISE | ORD/000673/2022-2023 | 782/MD | 17/03/2023 | Construction & Commissioning including FHTC with 3 (three) months trial run for proposed Mini Pipe W/S Scheme within Block Chandrakona-I at Mouza-Paikpara, JL-267 in Paschim Medinipur District under Midnapore Division, PHE Dte. [PART-A] | 0.19 | BP-2023-24-695 | 06/03/2024 | VCH/000841/2023-2024 |
13 | Midnapore Division | BILL/01385/2023-2024 | 05/03/2024 | BANERJEE CONSTRUCTION | ORD/000377/2022-2023 | 1960/MD | 20/09/2022 | Laying distribution pipeline, Providing FHTC, Soil test and Construction of RCC Over Head Reservoir of capacity 550 CuM (Intez type with solid raft) and staging height 20.00 mtr. with allied work including Sinking of Rig bored tube well for Augmentation o | 106.30 | BP-2023-24-698 | 06/03/2024 | VCH/000978/2023-2024 |
14 | Midnapore Division | BILL/01227/2023-2024 | 08/02/2024 | GOBINDA MAITY | ORD/000093/2022-2023 | 673/MD | 11/04/2022 | Preparation & Submission of D.P.R. along with pipeline Layout Plan, Hy. Design etc. in compliance to JJM guideline for Proposed Bhutna & its adjoining Mouzas PWSS, Block - Daspur-II under Midnapore Division, PHE Dte. | 6.81 | BP-2023-24-663 | 22/02/2024 | VCH/000751/2023-2024 |
15 | Midnapore Division | BILL/01236/2023-2024 | 09/02/2024 | FIROJ KHAN | ORD/000112/2023-2024 | 2513/MD | 18/07/2023 | Sinking of 2 (Two) Nos. Tube well for Chakmaoa & its adjoining mouzas PWSS in Kharagpur-II block including supply of all labour & materials under Kharagpur Sub-Division of Midnapore Division, P.H.E. Dte. in Paschim Medinipur District. | 14.27 | BP-2023-24-654 | 20/02/2024 | VCH/000951/2023-2024 |
16 | Midnapore Division | BILL/01237/2023-2024 | 12/02/2024 | SAMIT PAL | ORD/000698/2021-2022 | 294/MD | 15/02/2022 | Construction & Commissioning including FHTC (Civil Part) with 3 (three) months trial run for proposed Mini Pipe W/S Scheme under SAGY for Mouza- Dewanchak (Zone-IV), Block-Ghatal, District - Paschim Medinipur under Midnapore Division, PHE Dte. | 0.54 | 633 | 15/02/2024 | VCH/000837/2023-2024 |
17 | Midnapore Division | BILL/01245/2023-2024 | 16/02/2024 | BANERJEE CONSTRUCTION | ORD/000376/2022-2023 | 1959/MD | 20/09/2022 | Laying distribution pipeline, Soil test and Construction of RCC Over Head Reservoir of capacity 200 CuM and staging height 20.00 mtr. with allied work including supply of all labour & materials for Augmentation of Amlagora W/S Scheme to accommodate FHTC w | 166.39 | BP-2023-24-649 | 19/02/2024 | VCH/000948/2023-2024 |
18 | Midnapore Division | BILL/01259/2023-2024 | 20/02/2024 | D.C. RAKSHIT AND SONS INDIA PRIVATE LTD. | ORD/000359/2021-2022 | 1827/MD | 02/11/2021 | Laying distribution pipe line, Soil test & Construction of R.C.C. Over Head Reservoir of capacity 150 Cum and staging height 20.00 mtr. with allied work for Krishnapriya & its adjoining mouzas Water Supply Scheme within Pingla Block including supply of | 17.12 | BP-2023-24-665 | 22/02/2024 | VCH/000960/2023-2024 |
19 | Midnapore Division | BILL/01293/2023-2024 | 27/02/2024 | AJIJUR RAHAMAN MALLICK | ORD/000171/2023-2024 | 2673/MD | 26/07/2023 | Laying distribution system pipe line & Accommodate FHTC (152 Nos.) under JJM with allied work for Hariatara PWSS (Zone-II) in Kharagpur-I block including supply of all labour & materials within Kharagpur Sub-Division under Midnapore Division, PHE Dte. [PA | 14.01 | BP-2023-24-670 | 29/02/2024 | VCH/000845/2023-2024 |
20 | Midnapore Division | BILL/01295/2023-2024 | 27/02/2024 | MASUM ALI KHAN | ORD/000053/2023-2024 | 949/MD | 06/04/2023 | Continuation Work Order for Laying Balance Distribution Pipe line for Rejuvenation of Palashi and its adjoining mouzas Pipe Water Supply Scheme under Debra Block within Midnapore Division, P.H.E. Dte. (Total Length = 6,236.00 Mtr.) | 27.77 | BP-2023-24-680 | 29/02/2024 | VCH/000963/2023-2024 |
21 | Midnapore Division | BILL/01633/2023-2024 | 12/03/2024 | PULLOCK KUMAR GHOSH | ORD/000784/2023-2024 | 506/MD | 27/02/2024 | Installation of Display Board for JJM work at different Piped Water Supply Scheme under different block within Midnapore Division, PHE Dte. [PART-A] | 0.96 | 221553 | 20/03/2024 | VCH/000825/2023-2024 |
22 | Midnapore Division | BILL/01430/2023-2024 | 06/03/2024 | GARHBETA-1 UNEMPLOYED YOUTH ENGINEERS CO-OPERATIVE SOCIETY LTD. | ORD/000203/2023-2024 | 2817/MD | 07/08/2023 | Laying Rising main pipe line, Construction of Pump House & Boundary wall under JJM with allied work for Monoharpur & its adjoining mouzas PWSS in Dantan-I block including supply of all labour & materials within Kharagpur Sub-Division under Midnapore Divis | 20.73 | BP-2023-24-700 | 07/03/2024 | VCH/000980/2023-2024 |
23 | Midnapore Division | BILL/01432/2023-2024 | 06/03/2024 | M/S. D.K.H.CONSTRUCTION | ORD/000273/2023-2024 | 3260/MD | 12/09/2023 | Sinking of Tube Well, Laying distribution pipe line, Pump House, Boundary Wall, Soil investigation, 450 cum OHR (Intze type with pile foundation) & Accommodate FHTC (3,044 Nos.) under JJM including Two years O&M with allied work for Basanchhara PWSS i | 177.04 | BP-2023-24-699 | 07/03/2024 | VCH/000979/2023-2024 |
24 | Midnapore Division | BILL/01131/2023-2024 | 22/01/2024 | M/S. ZAMAN ENTERPRISE | ORD/000130/2023-2024 | 2585/MD | 21/07/2023 | Sinking of 150 X 100 mm dia. X 150 Mtr. Depth Rig bored Tube well at Kadra Nimnapalli, Pratiharpara, Mouza Kadra , J.L. No. 867, G.P - Kadra Uttarbil within Garhbeta-I Block under Midnapore Division PHE Dte. | 4.69 | BP-2023-24-569 | 25/01/2024 | VCH/000883/2023-2024 |
25 | Midnapore Division | BILL/01170/2023-2024 | 25/01/2024 | SUJATA CONSTRUCTION | ORD/000640/2022-2023 | 577/MD | 23/02/2023 | Sinking of Tube Well, Laying distribution pipe line, Pump House, Boundary Wall, Soil investigation, 200 cum OHR (Intze type with pile foundation) & Accommodate FHTC (1396 Nos.) under JJM with allied work for Kuran PWSS in Ghatal Block including supp | 57.34 | BP-2023-24-588 | 31/01/2024 | VCH/000848/2023-2024 |
26 | Midnapore Division | BILL/01185/2023-2024 | 25/01/2024 | M/S. SUBHAS CHANDRA KUNDU | ORD/000674/2022-2023 | 784/MD | 17/03/2023 | Construction & Commissioning including FHTC with 3 (three) months trial run for proposed Mini Pipe W/S Scheme within Block Chandrakona-II at Mouza-Ghanarampur, JL-257 in Paschim Medinipur District under Midnapore Division, PHE Dte. | 8.68 | BP-2023-24-582 | 30/01/2024 | VCH/000740/2023-2024 |
27 | Midnapore Division | BILL/01194/2023-2024 | 31/01/2024 | SANGITA MAITI | null | PHE/Estt/2133/2E-81/18 | 28/04/2022 | Contractual Assistant Engineer engaged in various division related to support activity under Jal Jeevan Mission {For One Month January 2024} | 0.28 | BP-2023-24-614 | 07/02/2024 | VCH/000768/2023-2024 |
28 | Midnapore Division | BILL/01201/2023-2024 | 01/02/2024 | ANIRUDDHA BAG | ORD/000128/2023-2024 | 2526/MD | 18/07/2023 | Sinking of Tube Well, Laying distribution pipe line, Rising Main, Pump House, Boundary Wall, Soil investigation, Construction of 350 Cum RCC Over Head Reservoir (Intze type with solid raft) & Accommodate FHTC (1976 Nos.) including Two years O&M under JJM | 274.14 | BP-2023-24-604 | 02/02/2024 | VCH/000733/2023-2024 |
29 | Midnapore Division | BILL/01216/2023-2024 | 06/02/2024 | HIRAK KUMAR GHOSH | ORD/000667/2023-2024 | 4069/MD | 12/10/2023 | Providing logistic support including necessary arrangement required for one day block level orientation programme cum workshop on JJM programme at each block of Midnapore Sadar Sub-Division in Paschim Medinipur district for different stake holders of bloc | 2.86 | BP-2023-24-619 | 07/02/2024 | VCH/000810/2023-2024 |
30 | Midnapore Division | BILL/01046/2023-2024 | 15/01/2024 | GOBINDA MAITY | ORD/000209/2023-2024 | 2825/MD | 07/08/2023 | Sinking of Tube wells, Construction of 450 CuM Capacity R.C.C Over Head Reservoirs (Over Pile Foundation) including Sub-Soil investigation works with Laying distribution system, Pump Houses, Boundary walls & Providing Functional Household Tap Connection | 356.67 | 2023-24-534-535 | 16/01/2024 | VCH/000725/2023-2024 |
31 | Midnapore Division | BILL/01050/2023-2024 | 15/01/2024 | MIDNAPUR PIPE CONCERN | ORD/000117/2023-2024 | 2492/MD | 17/07/2023 | Sinking of Tube well, Laying of Rising Main, Laying distribution pipe line, Pump House & Accommodate FHTC (437 Nos.) including 2 years operation & maintenance under JJM with allied work for Godapiyasol & its adjoining mouzas W/S Scheme in Salbani block | 41.25 | BP-2023-24-537 | 17/01/2024 | VCH/000859/2023-2024 |
32 | Midnapore Division | BILL/01054/2023-2024 | 15/01/2024 | ABASH SARADAMOY UNNAYN PARISHAD | null | 86/MD | 11/01/2024 | Remuneration of the Lab personnel of the NGO managed Laboratory under Midnapore Division, PHE Dte. | 1.80 | BP-2023-24-546 | 19/01/2024 | VCH/000773/2023-2024 |
33 | Midnapore Division | BILL/00960/2023-2024 | 08/12/2023 | UTSAV AGENCY | ORD/000214/2023-2024 | 379/RWS/MID | 17/07/2023 | Construction of Display Board at different District/Sub-District Water Testing Laboratory in different Blocks of Paschim Medinipur District under Midnapur Division, PHE Dte. | 1.51 | BP-2023-24-562 | 17/01/2024 | VCH/000860/2023-2024 |
34 | Midnapore Division | BILL/00961/2023-2024 | 08/12/2023 | UTSAV AGENCY | ORD/000158/2023-2024 | 227/RWS/MID | 05/06/2023 | Chemicals and other required items related to smooth functioning of NABL Recognition of Dantan Sub District Laboratory, under Midnapore Division PHE Dte. | 0.96 | BP-2023-24-561 | 17/01/2024 | VCH/000861/2023-2024 |
35 | Midnapore Division | BILL/01311/2023-2024 | 29/02/2024 | M/S BAKLY CONSTRUCTION | ORD/000108/2023-2024 | 2490/MD | 17/07/2023 | Sinking of 150 X 100 mm dia. X 150 mtr. Depth Rig bored Tube wells for proposed additionally (boosting) to existing Tararui W/S Scheme, Dantan-I Block under Midnapore Division, P.H.E. Dte. | 5.43 | BP-2023-24-690 | 05/03/2024 | VCH/000974/2023-2024 |
36 | Midnapore Division | BILL/01314/2023-2024 | 01/03/2024 | S.K. CONSTRUCTION | ORD/000675/2022-2023 | 785/MD | 17/03/2023 | Construction & Commissioning including FHTC with 3 (three) months trial run for proposed Mini Pipe W/S Scheme within Block Daspur-II at Mouza-Bhuta, JL-187 in Paschim Medinipur District under Midnapore Division, PHE Dte. | 0.19 | BP-2023-24-687 | 04/03/2024 | VCH/000840/2023-2024 |
37 | Midnapore Division | BILL/01323/2023-2024 | 04/03/2024 | PROVAT KUMAR DE | ORD/000289/2023-2024 | 3906/MD | 27/09/2023 | Laying of (Left out & Damaged) Distribution pipe line including Supply of Valves for Augmentation Sarta-Sijua Pipe Water Supply Scheme in Dantan-I Block under Khargapur Sub-Division within Midnapore Division, PHE Dte. | 9.65 | BP-2023-24-697 | 06/03/2024 | VCH/000923/2023-2024 |
38 | Midnapore Division | BILL/01220/2023-2024 | 07/02/2024 | KISHORE GHOSH | ORD/000292/2021-2022 | 372/RWS/MID | 30/09/2021 | Sinking of 3 nos. 100mm x 40mm. Dia. & 140 mtr. Depth, IM-II tube well at different places with in Keshpur Block of Paschim Medinipur District under Midnapore Division, P.H.E. Dte. (Sl. No. _ 10) | 4.00 | BP-2023-24-631 | 15/02/2024 | VCH/000778/2023-2024 |
39 | Midnapore Division | BILL/01221/2023-2024 | 07/02/2024 | KISHORE GHOSH | ORD/000297/2021-2022 | 379/RWS/MID | 30/09/2021 | Sinking of 2 nos. 100mm x 40mm. Dia. & 140 mtr. Depth, IM-II tube well at different places with in Keshpur Block of Paschim Medinipur District under Midnapore Division, P.H.E. Dte. (Sl. No. _ 17) | 2.71 | BP-2023-24-632 | 15/02/2024 | VCH/000779/2023-2024 |
40 | Midnapore Division | BILL/01226/2023-2024 | 08/02/2024 | GOBINDA MAITY | ORD/000117/2022-2023 | 689/MD | 13/04/2022 | Preparation & Submission of D.P.R. along with pipeline Layout Plan, Hy. Design etc. in compliance to JJM guideline for Proposed Palashpai & its adjoining Mouzas PWSS, Block - Daspur-II under Midnapore Division, PHE Dte. | 10.78 | BP-2023-24-647 | 19/02/2024 | VCH/000947/2023-2024 |
41 | Midnapore Division | BILL/01228/2023-2024 | 08/02/2024 | SAMIT PAL | ORD/000048/2023-2024 | 1431/MD | 04/05/2023 | Sinking of Tube well, Laying distribution pipe line, Rising main, Operation & maintenance of 2 years under JJM with allied work for Hemantapur PWSS in Ghatal Block including supply of all labour & materials within Ghatal Sub-Division under Midnapore Divis | 6.55 | BP-2023-24-630 | 15/02/2024 | VCH/000942/2023-2024 |
42 | Midnapore Division | BILL/01246/2023-2024 | 16/02/2024 | M/S. CARE | ORD/000385/2023-2024 | 5059/MD | 26/10/2023 | Sinking of Tube Well, Laying distribution pipe line, Rising Main, Pump House, Boundary Wall, Soil investigation, Construction of 400 Cum (Intze type with Pile Foundation) OHR & Accommodate FHTC (2,792 Nos.) including 02(Two) years O&M under JJM with al | 65.16 | BP-2023-24-651 | 20/02/2024 | VCH/000777/2023-2024 |
43 | Midnapore Division | BILL/01811/2023-2024 | 19/03/2024 | SUNANDA ENVIROMENTAL INTERNATIONAL PVT. LTD. | ORD/000668/2023-2024 | 4070/MD | 12/10/2023 | Providing logistic support including necessary arrangement required for one day block level orientation programme cum workshop on JJM programme at each block of Ghatal Sub-Division in Paschim Medinipur district for different stake holders of block and GP | 2.36 | 221530 | 22/03/2024 | VCH/000846/2023-2024 |
44 | Midnapore Division | BILL/01627/2023-2024 | 12/03/2024 | S.T. ENTERPRISE | ORD/000465/2022-2023 | 2185/MD | 01/11/2022 | Construction & Commissioning including FHTC (Civil Part) with 3 (three) months trial run for proposed Mini Pipe W/S Scheme for Mouza - Daspur (Zone-II), Block - Sabang, District - Paschim Medinipur under Midnapore Division, PHE Dte. | 29.73 | BP-2023-24-716 | 13/03/2024 | VCH/000914/2023-2024 |
45 | Midnapore Division | BILL/01171/2023-2024 | 25/01/2024 | SUJATA CONSTRUCTION | ORD/000127/2023-2024 | 2525/MD | 18/07/2023 | Sinking of Tube Well ,Laying distribution pipe line, Pump House , Boundary Wall, soil investigation , 200 Cum OHR (Intze type with Raft foundation) & Accommodate FHTC (1847 nos.) under JJM with allied work including 02(Two )Years Operation & Maintenan | 78.11 | BP-2023-24-587 | 30/01/2024 | VCH/000762/2023-2024 |
46 | Midnapore Division | BILL/01172/2023-2024 | 25/01/2024 | BANERJEE CONSTRUCTION | ORD/000068/2023-2024 | 2421/MD | 13/07/2023 | Sinking Of Tube Well ,Laying distribution pipe line, Pump House , Boundary Wall soil investigation , 400 cum OHR (Intze type with pile foundation) & Accommodate FHTC (2790 Nos) under JJM with allied work for Kharika & its adjoining mouzas W/S sche | 51.11 | BP-2023-24-593 | 30/01/2024 | VCH/000889/2023-2024 |
47 | Midnapore Division | BILL/01179/2023-2024 | 25/01/2024 | M/S. ZAMAN ENTERPRISE | ORD/000920/2021-2022 | 539/MD | 22/03/2022 | Construction & Commissioning including FHTC (Civil Part) with 3 (three) months trial run for proposed Mini Pipe W/S Scheme under SAGY for Mouza- Dewanchak (Zone-II), Block - Ghatal, District - Paschim Medinipur under Midnapore Division, PHE Dte. | 1.21 | BP-2023-24-595 | 30/01/2024 | VCH/000726/2023-2024 |
48 | Midnapore Division | BILL/01204/2023-2024 | 02/02/2024 | DEBASISH DOGRA | ORD/000110/2023-2024 | 2511/MD | 18/07/2023 | Sinking of 2 Nos. Tube well & Accommodate FHTC (100 Nos.) under JJM with allied work for Pathri PWSS in Salboni block including supply of all labour & materials within Midnapore Sadar Sub-Division under Midnapore Division, PHE Dte. [PART-A] | 15.55 | BP-2023-24-615 | 07/02/2024 | VCH/000937/2023-2024 |
49 | Midnapore Division | BILL/01205/2023-2024 | 02/02/2024 | SUJATA CONSTRUCTION | ORD/000037/2023-2024 | 1340/MD | 28/04/2023 | Construction of different capacity R.C.C. Over Head Reservoir Pile / Raft Foundation works with Laying rising main, Distribution system, Sinking of Tube well, Pump House, Boundary Wall & Providing Functional Household Tap Connection (1,137 Nos.) includin | 41.35 | BP-2023-24-606 | 05/02/2024 | VCH/000767/2023-2024 |
50 | Midnapore Division | BILL/01214/2023-2024 | 06/02/2024 | M/S. SOMNATH | ORD/001038/2022-2023 | 342/1/AE/KSD | 23/03/2023 | Hiring of Bharat Stage- IV/V diesel motor cab (Luxury Taxi) (Standard Non-AC) having contractcarriage permit from the regional transport authority for the Office of the Assistant Engineer, Kharagpur Sub- Division,P.H.E. Dte. ( For 12 MONTH )[ Perion fro | 2.98 | BP-2023-24-620 | 07/02/2024 | VCH/000819/2023-2024 |
51 | Midnapore Division | BILL/00008/2024-2025 | 04/04/2024 | M/S. D.K.H.CONSTRUCTION | ORD/000177/2023-2024 | 2717/MD | 31/07/2023 | Laying Rising main, distribution pipe line, 2 nos. Pump House, Boundary wall & Accommodate FHTC (800 Nos.) including 2 years operation & maintenance under JJM with allied work for Mahasol & its adjoining mouzas W/S Scheme in Salboni block including supply | 52.68 | BP-2024-25-1 | 04/04/2024 | VCH/000001/2024-2025 |
52 | Midnapore Division | BILL/00011/2024-2025 | 08/04/2024 | SUJATA CONSTRUCTION | ORD/000034/2023-2024 | 1142/MD | 25/04/2023 | Laying distribution pipe line, Pump House, Boundary wall, Soil investigation, 350 cum OHR (Intze type with pile foundation) & Accommodate FHTC under JJM with allied work for Dhanyagachhi PWSS in Chandrakona-II block including supply of all labour & materi | 12.09 | BP-2024-25-21 | 15/04/2024 | VCH/000004/2024-2025 |
53 | Midnapore Division | BILL/01049/2023-2024 | 15/01/2024 | FIROJ KHAN | ORD/000111/2023-2024 | 2512/MD | 18/07/2023 | Sinking of Two nos. 250 X 150 mm dia. X 160 mtr. depth deep tube well by direct rotary method under JJM with allied work for Karnagar PWSS in Salboni block including supply of all labour & materials within Midnapore Sadar Sub-Division under Midnapore Divi | 7.25 | BP-2023-24-539 | 17/01/2024 | VCH/000847/2023-2024 |
54 | Midnapore Division | BILL/01051/2023-2024 | 15/01/2024 | DULAL CHANDRA DAS | ORD/000060/2023-2024 | 2418/MD | 13/07/2023 | Sinking of Tube Well, Laying distribution pipe line, Pump House , Boundary Wall soil investigation, 350 cum OHR (Intze type with pile foundation) & Accommodate FHTC (1990 Nos.) under JJM with allied work for Mahespur PWSS in Chandrakona-I Block inclu | 115.20 | BP-2023-24-538 | 17/01/2024 | VCH/000765/2023-2024 |
55 | Midnapore Division | BILL/01089/2023-2024 | 17/01/2024 | DEBJIT PATRA | ORD/000220/2023-2024 | 2873/MD | 10/08/2023 | Sinking of 2 (Two) Nos. Tube well for Mahasol & its adjoining mouzas PWSS in Salboni block including supply of all labour & materials under Midnapore Sadar Sub-Division of Midnapore Division, P.H.E. Dte. in Paschim Medinipur District. (Part-I) | 14.65 | BP-2023-24-572 | 25/01/2024 | VCH/000743/2023-2024 |
56 | Midnapore Division | BILL/00969/2023-2024 | 08/12/2023 | UTSAV AGENCY | ORD/000159/2023-2024 | 233/RWS/MID | 06/06/2023 | Chemicals and other required items related to smooth functioning of NABL Recognition of Belda Sub District Laboratory, under Midnapore Division PHE Dte. | 0.96 | BP-2023-24-554 | 17/01/2024 | VCH/000877/2023-2024 |
57 | Midnapore Division | BILL/00971/2023-2024 | 08/12/2023 | UTSAV AGENCY | ORD/000161/2023-2024 | 242/RWS/MID | 07/06/2023 | Chemicals and other required items related to smooth functioning of NABL Recognition of Bhikni Nischintapur Sub District Laboratory, under Midnapore Division PHE Dte. | 0.96 | BP-2023-24-556 | 17/01/2024 | VCH/000879/2023-2024 |
58 | Midnapore Division | BILL/01029/2023-2024 | 28/12/2023 | UTSAV AGENCY | ORD/000633/2022-2023 | 2065/MD | 30/09/2022 | Engagement of 2 (Two) Nos. Laboratory Personnel (One Chemist / Bacteriologist & One Laboratory Assistant) of each lab for regular analysis, testing and monitoring of water samples and others allied minor mtc. works for (A) Chandrakona Municipality Sub-Dis | 7.27 | BP-2023-24-540 | 17/01/2024 | VCH/000769/2023-2024 |
59 | Midnapore Division | BILL/01318/2023-2024 | 04/03/2024 | BELDA SAURYA PRABHA GUCHHA SAMITI | null | 5114/MD | 11/11/2023 | Remuneration for the month of October 2023. | 0.14 | BP-2023-24-707 | 11/03/2024 | VCH/000956/2023-2024 |
60 | Midnapore Division | BILL/01231/2023-2024 | 09/02/2024 | SAJAL JANA | ORD/000076/2023-2024 | 2423/MD | 13/07/2023 | Sinking of 2 (Two) Nos. 300 X 200 mm dia. X 190 mtr. depth deep tube well by direct rotary method for Head work site & 2nd tube well site of Krishnapur PWSS within Chandrakona-II block under Midnapore Division, P.H.E Dte. [PART-I] | 9.91 | BP-2023-24-650 | 19/02/2024 | VCH/000949/2023-2024 |
61 | Midnapore Division | BILL/01238/2023-2024 | 12/02/2024 | DULAL CHANDRA DAS | ORD/000312/2018-2019 | 595/MD | 02/04/2018 | Laying Distribution system of uPVC (Class-III), GI & DI (K7) Pipe line for Improvement of Madpur & its adjoining mouzas W/S Scheme within Kharagpur-II Block under Midnapore Division, PHE. Dte. | 4.38 | BP-2023-24-634 | 15/02/2024 | VCH/000943/2023-2024 |
62 | Midnapore Division | BILL/01247/2023-2024 | 19/02/2024 | GOBINDA MAITY | ORD/000924/2021-2022 | 569/MD | 28/03/2022 | Laying distribution pipe line, soil test & construction of R.C.C. Over Head Reservoir of capacity 350 Cum and staging height 20.00 mtr. with allied work including sinking of 3 nos. 250 mm x 150 mm x 190 Mtr. Depth Tube Well for Augmentation of Debra and | 76.74 | BP-2023-24-652 | 20/02/2024 | VCH/000950/2023-2024 |
63 | Midnapore Division | BILL/01255/2023-2024 | 20/02/2024 | MASUM ALI KHAN | ORD/000630/2021-2022 | 183/MD | 01/02/2022 | Construction & Commissioning including FHTC (Civil Part) with 3 (three) months trial run for proposed Mini Pipe W/S Scheme for Mouza - Uchitpur (Zone-I), Block - Sabang, District - Paschim Medinipur under Midnapore Division, PHE Dte. | 1.29 | BP-2023-24-660 | 22/02/2024 | VCH/000925/2023-2024 |
64 | Midnapore Division | BILL/01256/2023-2024 | 20/02/2024 | A R ENTERPRISE | ORD/000023/2023-2024 | 1025/MD | 12/04/2023 | Laying of Distribution pipe line for Dhanyagachhi & its adjoing mouza Water Supply Scheme under Chandrakona-II block within Midnapore Division, PHE Dte. [PART-E] | 16.86 | BP-2023-24-661 | 22/02/2024 | VCH/000904/2023-2024 |
65 | Midnapore Division | BILL/01258/2023-2024 | 20/02/2024 | UMWELT ENGINEER PRIVATE LIMITED | ORD/000494/2022-2023 | 2191/MD | 01/11/2022 | Preparation of D.P.R (Consultancy work) in connection with the Functional House Hold Connection for Rejuvenation / Augmentation of existing Dherua PWSS within Midnapore Sadar Block under Midnapore Division P.H.E. Dte. | 15.40 | BP-2023-24-681 | 04/03/2024 | VCH/000970/2023-2024 |
66 | Midnapore Division | BILL/01267/2023-2024 | 22/02/2024 | M/S. D.K.H.CONSTRUCTION | ORD/000177/2023-2024 | 2717/MD | 31/07/2023 | Laying Rising main, distribution pipe line, 2 nos. Pump House, Boundary wall & Accommodate FHTC (800 Nos.) including 2 years operation & maintenance under JJM with allied work for Mahasol & its adjoining mouzas W/S Scheme in Salboni block including supply | 71.55 | BP-2023-24-668 | 22/02/2024 | VCH/000874/2023-2024 |
67 | Midnapore Division | BILL/01298/2023-2024 | 28/02/2024 | MASUM CONSTRUCTION | ORD/000140/2023-2024 | 2624/MD | 24/07/2023 | Sinking of 2 nos. Tube well under JJM with allied work for Benucha & its adjoining mouzas W/S Scheme in Salbani block including supply of all labour & materials within Midnapore Sadar Sub-Division under Midnapore Division, PHE Dte. [PART-A] | 16.02 | BP-2023-24-682 | 04/03/2024 | VCH/000971/2023-2024 |
68 | Midnapore Division | BILL/01629/2023-2024 | 12/03/2024 | SUJATA CONSTRUCTION | ORD/000129/2023-2024 | 2538/MD | 19/07/2023 | Sinking of Tube Well ,Laying distribution pipe line, Pump House , Boundary Wall, soil investigation , 300 Cum OHR (Intze type with Pile foundation) & Accommodate FHTC (1844 nos.) under JJM with allied work including 02(Two )Years Operation & Maintena | 60.96 | BP-2023-24-715 | 13/03/2024 | VCH/000924/2023-2024 |
69 | Midnapore Division | BILL/01176/2023-2024 | 25/01/2024 | ASIS KUMAR SARANGI | ORD/000588/2022-2023 | 339/MD | 31/01/2023 | Laying distribution pipe line, Pump House, Boundary wall, OHR (100 CUM) allied work for Pathaisol & its adjoining mouzas W/S scheme in Garbeta-III Block including supply of all labour & materials within Midnapore Sadar Sub-Division under Midnapore Div | 23.70 | BP-2023-24-585 | 30/01/2024 | VCH/000722/2023-2024 |
70 | Midnapore Division | BILL/01181/2023-2024 | 25/01/2024 | ANNAPURNA TUBEWELL WORKS | ORD/000114/2023-2024 | 2515/MD | 18/07/2023 | Sinking of 2 (Two) Nos. Tube well for Bag Basa & its adjoining mouzas PWSS in Salboni block including supply of all labour & materials under Midnapore Sadar Sub-Division of Midnapore Division, P.H.E. Dte. in Paschim Medinipur District. | 15.71 | BP-2023-24-586 | 30/01/2024 | VCH/000850/2023-2024 |
71 | Midnapore Division | BILL/01186/2023-2024 | 25/01/2024 | R. CONSTRUCTION | ORD/000043/2023-2024 | 1408/MD | 04/05/2023 | Construction of Pump House, Laying Rising main, Boundary wall, Laying distribution system pipe line, Accommodate FHTC (252 Nos.) including 2 yrs. O&M under JJM with allied work for Hariatara PWSS (Zone-II) in Kharagpur-I block including supply of all labo | 53.57 | BP-2023-24-596 | 30/01/2024 | VCH/000748/2023-2024 |
72 | Midnapore Division | BILL/01198/2023-2024 | 01/02/2024 | M/S. INDRAJIT ROY | ORD/000729/2022-2023 | 870/MD | 28/03/2023 | Construction & Commissioning including FHTC with 3 (three) months trial run for proposed Mini Pipe W/S Scheme within Block Chandrakona-I at Mouza-Nischintapur, JL-264 in Paschim Medinipur District under Midnapore Division, PHE Dte. | 0.19 | BP-2023-24-610 | 05/02/2024 | VCH/000742/2023-2024 |
73 | Midnapore Division | BILL/01200/2023-2024 | 01/02/2024 | A.J. ENTERPRISE | ORD/000066/2023-2024 | 2147/MD | 08/06/2023 | Sinking of Tube Well ,Laying distribution pipe line, Pump House , Boundary Wall, soil investigation , 100 Cum OHR (Intze type with Raft foundation) & Accommodate FHTC (459 nos.) under JJM with allied work including 02(Two )Years Operation & Maintenanc | 49.60 | BP-2023-24-607 | 05/02/2024 | VCH/000935/2023-2024 |
74 | Midnapore Division | BILL/01206/2023-2024 | 02/02/2024 | M/S R.N. ENTERPRISE | ORD/000255/2023-2024 | 3150/MD | 29/08/2023 | Sinking of Tube Well, Laying distribution pipe line, Pump House, Balance FHTC (211 Nos.) & Repair of Boundary Wall, Pump House & 250 cum OHR for Augmentation of Ragpur PWSS in Pingla Block including supply of all labour & materials within Kharagpur Sub-D | 77.77 | BP-2023-24-618 | 05/02/2024 | VCH/000822/2023-2024 |
75 | Midnapore Division | BILL/01219/2023-2024 | 07/02/2024 | DEVJYOTI BERA | ORD/000021/2022-2023 | 618/MD | 04/04/2022 | Construction & Commissioning including FHTC (Civil Part) with 3 (three) months trial run for proposed Mini Pipe W/S Scheme under SAGY for Mouza- Masharpur (Zone-II), Block - Ghatal, District - Paschim Medinipur under Midnapore Division, PHE Dte. | 24.78 | BP-2023-24-625 | 09/02/2024 | VCH/000941/2023-2024 |
76 | Midnapore Division | BILL/01918/2023-2024 | 27/03/2024 | MIDNAPUR PIPE CONCERN | ORD/000637/2023-2024 | 141/MD | 18/01/2024 | Laying rising main, Pump House & Accommodate FHTC (1,164 Nos.) including 2 yrs. O & M under JJM with allied work for Banpura & adjoining Mouza W/S Scheme in Midnapore Sadar Block including supply of all labour & materials within Midnapore Sadar Sub-Divis | 50.93 | BP-2023-24-808 | 28/03/2024 | VCH/000911/2023-2024 |
77 | Midnapore Division | BILL/01964/2023-2024 | 27/03/2024 | K & KABERI ENTERPRISE (PROP. GOUTAM MAITY) | ORD/000945/2022-2023 | 730/AE/KSD | 10/11/2022 | Training Programme in connection with skilling of Man power to Generate Employment Oppurtunities and to support implimentation of Jal Jeevan Mission Programme at different Places within Midnapore Division P.H.E Dte. (Part-A) ( Kharagpur-II Block) | 0.70 | 2215162 | 29/03/2024 | VCH/000927/2023-2024 |
78 | Midnapore Division | BILL/01965/2023-2024 | 27/03/2024 | K & KABERI ENTERPRISE (PROP. GOUTAM MAITY) | ORD/000942/2022-2023 | 828/B/AE/KSD | 10/12/2022 | Training Programme in connection with skilling of Man power to Generate Employment Oppurtunities and to support implimentation of Jal Jeevan Mission Programme at different Places within Midnapore Division P.H.E Dte. (Part-B) ( NARAYANGARH- Block) | 0.51 | BP-2023-24-444 | 29/03/2024 | VCH/000928/2023-2024 |
79 | Midnapore Division | BILL/01968/2023-2024 | 27/03/2024 | K & KABERI ENTERPRISE (PROP. GOUTAM MAITY) | ORD/000946/2022-2023 | 730/A/AE/KSD | 10/11/2022 | Training Programme in connection with skilling of Man power to Generate Employment Oppurtunities and to support implimentation of Jal Jeevan Mission Programme at different Places within Midnapore Division P.H.E Dte. (Part-B) ( Kharagpur-II Block) | 0.51 | BP-2023-24-447 | 29/03/2024 | VCH/000931/2023-2024 |
80 | Midnapore Division | BILL/01047/2023-2024 | 15/01/2024 | GOBINDA MAITY | ORD/000499/2022-2023 | 2364/MD | 21/11/2022 | Sinking of Tube Well ,Laying distribution pipe line, Pump House, Boundary wall, Soil investigation, 400 CuM OHR (Intze type with pile foundation) & Accommodate FHTC under JJM with allied work for (i) Ranichak & its adjoining mouzas W/S Scheme, (ii) J | 45.44 | 23-24-577-579 | 25/01/2024 | VCH/000871/2023-2024 |
81 | Midnapore Division | BILL/01057/2023-2024 | 15/01/2024 | SARBIK GRAM BIKASH KENDRA | null | 86/MD | 11/01/2024 | Remuneration of the Lab personnel of the NGO managed Laboratory under Midnapore Division, PHE Dte. | 1.80 | BP-2023-24-547 | 17/01/2024 | VCH/000775/2023-2024 |
82 | Midnapore Division | BILL/00966/2023-2024 | 08/12/2023 | UTSAV AGENCY | ORD/000155/2023-2024 | 219/RWS/MID | 26/05/2023 | Chemicals and other required items related to smooth functioning of NABL Recognition of Chandrakona Municipality Sub District Laboratory, under Midnapore Division PHE Dte. | 0.96 | BP-2023-24-551 | 17/01/2024 | VCH/000869/2023-2024 |
83 | Midnapore Division | BILL/00967/2023-2024 | 08/12/2023 | UTSAV AGENCY | ORD/000156/2023-2024 | 225/RWS/MID | 05/06/2023 | Chemicals and other required items related to smooth functioning of NABL Recognition of Garhbeta Sub District Laboratory, under Midnapore Division PHE Dte. | 0.96 | BP-2023-24-552 | 17/01/2024 | VCH/000875/2023-2024 |
84 | Midnapore Division | BILL/00970/2023-2024 | 08/12/2023 | UTSAV AGENCY | ORD/000160/2023-2024 | 234/RWS/MID | 06/06/2023 | Chemicals and other required items related to smooth functioning of NABL Recognition of Keshiary Sub District Laboratory, under Midnapore Division PHE Dte. | 0.96 | BP-2023-24-555 | 17/01/2024 | VCH/000878/2023-2024 |
85 | Midnapore Division | BILL/00973/2023-2024 | 08/12/2023 | UTSAV AGENCY | ORD/000163/2023-2024 | 244/RWS/MID | 07/06/2023 | Chemicals and other required items related to smooth functioning of NABL Recognition of Five (Serbera, Dantan, Belda , Keshiary & Bhikni Nischintapur) Sub District Laboratory, under Midnapore Division PHE Dte. | 0.66 | BP-2023-24-560 | 17/01/2024 | VCH/000865/2023-2024 |
86 | Midnapore Division | BILL/01023/2023-2024 | 21/12/2023 | SRIJAN ECOLOGICAL UPLIFTMENT PVT. LTD. | ORD/000197/2021-2022 | 930/MD | 14/06/2021 | Design with allied works in connection with the Functional Household Tap Connection of existing PWSS (Daspur, Block - Daspur-I) to be Augmentation / Rejuvenation under Midnapore Division, PHE Dte. | 2.07 | BP-2023-24-519 | 04/01/2024 | VCH/000836/2023-2024 |
87 | Midnapore Division | BILL/01222/2023-2024 | 07/02/2024 | KISHORE GHOSH | ORD/000293/2021-2022 | 373/RWS/MID | 30/09/2021 | Sinking of 3 nos. 100mm x 40mm. Dia. & 140 mtr. Depth, IM-II tube well at different places with in Keshpur Block of Paschim Medinipur District under Midnapore Division, P.H.E. Dte. (Sl. No. _ 11) | 4.07 | BP-2023-24-635 | 15/02/2024 | VCH/000780/2023-2024 |
88 | Midnapore Division | BILL/01233/2023-2024 | 09/02/2024 | DIPAK KUMAR BAKLY | ORD/000249/2023-2024 | 3102/MD | 25/08/2023 | Sinking of Tube Well, Laying distribution pipe line, Pump House , Boundary Wall, Soil investigation, 450 cum OHR (Intze type with pile foundation) & Accommodate FHTC (2,796 nos.) under JJM with allied work for Shilarajnagar PWSS in Ghatal Block inclu | 17.35 | BP-2023-24-627 | 15/02/2024 | VCH/000826/2023-2024 |
89 | Midnapore Division | BILL/01241/2023-2024 | 15/02/2024 | M/S. EL-CON | ORD/000063/2023-2024 | 2144/MD | 08/06/2023 | Sinking of Tube Well, Laying distribution pipe line, Pump House, Boundary Wall, soil investigation, 300 Cum OHR (Intze type with Pile foundation) & Accommodate FHTC (2432 nos.) under JJM with allied work including 02 (Two) Years Operation & Maintenance | 38.01 | BP-2023-24-643 | 19/02/2024 | VCH/000945/2023-2024 |
90 | Midnapore Division | BILL/01261/2023-2024 | 21/02/2024 | ASHIM KUMAR DEY | ORD/000448/2020-2021 | 339/MD | 24/02/2021 | Retrofitting to accommodate balance FHTC under JJM in Chhotokhelna PWSS, Block :- Pingla in the District of Paschim Medinipur. | 9.39 | BP-2023-24-667 | 22/02/2024 | VCH/000962/2023-2024 |
91 | Midnapore Division | BILL/01291/2023-2024 | 23/02/2024 | SWACH ENVIRONMENT PRIVATE LIMITED | ORD/000039/2023-2024 | 1355/MD | 02/05/2023 | Construction of Different Capacity R.C.C Over Head Reservoir Over Pile / Raft Foundation including sub soil investigation works for Construction of Over Head Reservoir with laying distribution system, Sinking of Tube Well, Pump House & laying of rising m | 500.88 | 23-24-671-678 | 29/02/2024 | VCH/000821/2023-2024 |
92 | Midnapore Division | BILL/01195/2023-2024 | 01/02/2024 | OM UDYUG | ORD/000026/2023-2024 | 966/MD | 06/04/2023 | Construction & Commissioning including FHTC with 3 (three) months trial run for proposed Mini Pipe W/S Scheme within Block Daspur-I at Mouza-Dharma, JL-145 in Paschim Medinipur District under Midnapore Division, PHE Dte. | 9.05 | BP-2023-24-608 | 05/02/2024 | VCH/000741/2023-2024 |
93 | Midnapore Division | BILL/01207/2023-2024 | 05/02/2024 | A.J. ENTERPRISE | ORD/000073/2023-2024 | 2146/MD | 08/06/2023 | Sinking of Tube Well ,Laying distribution pipe line, Pump House , Boundary Wall, Soil investigation , 250 Cum OHR (Intze type with Raft foundation) & Accommodate FHTC (1488 nos.) under JJM with allied work including 02(Two )Years Operation & Maintenan | 69.61 | BP-2023-24-617 | 07/02/2024 | VCH/000939/2023-2024 |
94 | Midnapore Division | BILL/01212/2023-2024 | 06/02/2024 | M/S. ZAMAN ENTERPRISE | ORD/000768/2022-2023 | 762/AE/MSSD | 30/12/2022 | Continuation work order for Hire charges for hiring of 1 no Motor Cab ( standard ) Commercial with Catalytic Converter attachment with Bharat stage as per prevalent applicable standard compliant new / not old than 30 ( Thirty ) months from the date of 1st | 1.98 | 23-24-624 | 07/02/2024 | VCH/000732/2023-2024 |
95 | Midnapore Division | BILL/01916/2023-2024 | 27/03/2024 | SUBRATA DAS | ORD/000815/2023-2024 | 649/MD | 07/03/2024 | Construction of Boundary wall, Construction and Commissioning of RCC Over Head Reservoir (Torch type with solid raft) of capacity 100 cum and staging height 20 mtr & Accommodate FHTC (400 Nos.) under JJM with allied work for Mahadevchak & adjoining Mouza | 6.66 | BP-2023-24-817 | 28/03/2024 | VCH/000913/2023-2024 |
96 | Midnapore Division | BILL/01998/2023-2024 | 28/03/2024 | K & KABERI ENTERPRISE (PROP. GOUTAM MAITY) | ORD/000943/2022-2023 | 729/A/AE/KSD | 10/11/2022 | Training Programme in connection with skilling of Man power to Generate Employment Oppurtunities and to support implimentation of Jal Jeevan Mission Programme at different Places within Midnapore Division P.H.E Dte. (Part-B) ( Kharagpur-I Block) | 0.51 | BP-2023-24-447 | 29/03/2024 | VCH/000932/2023-2024 |
97 | Midnapore Division | BILL/01048/2023-2024 | 15/01/2024 | ANUSKA ENTERPRISE | ORD/000044/2023-2024 | 980/MD | 10/04/2023 | Construction and commissioning of RCC Over Head Reservoir (Intze type with solid raft) of capacity 250 cum and staging height 20 mtr as per approved drawing (No:- PC-I/OHR/10/2012) with allied works for Bajpara & its adjoining mouzas W/S Scheme within Mid | 27.31 | BP-2023-24-536 | 17/01/2024 | VCH/000858/2023-2024 |
98 | Midnapore Division | BILL/01127/2023-2024 | 22/01/2024 | M/S. S.S. ENTERPRISE | ORD/000183/2023-2024 | 2735/MD | 01/08/2023 | Construction of Different Capacity R.C.C. Over Head Reservoir Over Pile / Raft Foundation including Sub-Soil investigation works for Construction of Over Head Reservoir with Laying distribution system, Sinking of Tube Well, Pump House, Boundary Wall & Pr | 127.50 | 23-24-565-566 | 24/01/2024 | VCH/000723/2023-2024 |
99 | Midnapore Division | BILL/00965/2023-2024 | 08/12/2023 | UTSAV AGENCY | ORD/000154/2023-2024 | 218/RWS/MID | 26/05/2023 | Chemicals and other required items related to smooth functioning of NABL Recognition of Ghatal Sub District Laboratory, under Midnapore Division PHE Dte. | 0.96 | BP-2023-24-550 | 17/01/2024 | VCH/000868/2023-2024 |
100 | Midnapore Division | BILL/01022/2023-2024 | 21/12/2023 | DULAL CHANDRA DAS | ORD/000030/2023-2024 | 947/MD | 06/04/2023 | Sinking of Tube well, Laying distribution pipe line, Pump House, Boundary wall, Soil investigation, Construction of 400 CuM OHR (Intze type with Pile Foundation) & Accommodate FHTC (2,576 Nos.) under JJM with allied works for Kalagram PWSS in Keshpur Blo | 162.40 | BP-2023-24-517 | 04/01/2024 | VCH/000857/2023-2024 |
101 | Midnapore Division | BILL/01028/2023-2024 | 28/12/2023 | UTSAV AGENCY | ORD/000634/2022-2023 | 2066/MD | 30/09/2022 | Engagement of 2 (Two) Nos. Laboratory Personnel (One Chemist / Bacteriologist & One Laboratory Assistant) of each for regular analysis, testing and monitoring of water samples and others allied minor mtc. works for (A) Garhbeta Sub-District Laboratory & ( | 2.37 | BP-2023-24-663 | 19/01/2024 | VCH/000770/2023-2024 |
102 | Midnapore Division | BILL/01290/2023-2024 | 22/02/2024 | DIPAK KUMAR BAKLY | ORD/000631/2022-2023 | 456/MD | 13/02/2023 | Sinking of Tube Well, Laying distribution pipe line, Pump House, Boundary Wall, OHR (350 CUM) & allied work for Hatihalka & its adjoining mouzas W/S Scheme in Midnapore Sadar Block including supply of all labour & materials within Midnapore Sub-Division u | 28.24 | BP-2023-24-669 | 28/02/2024 | VCH/000759/2023-2024 |
103 | Midnapore Division | BILL/01301/2023-2024 | 29/02/2024 | SANJIT SINHA | ORD/000769/2022-2023 | 865/AE/MSSD | 10/02/2023 | Continuation Work order for Hire charges for hiring of 1 no Motor Cab ( standard ) Commercial with Catalytic Converter attachment with Bharat stage as per prevalent applicable standard compliant new / not old than 30 ( Thirty ) months from the date of 1st | 1.83 | 2023-24-689-693 | 05/03/2024 | VCH/000976/2023-2024 |
104 | Midnapore Division | BILL/01820/2023-2024 | 21/03/2024 | KISHORE GHOSH | ORD/000639/2022-2023 | 557/MD | 22/02/2023 | Construction & Commissioning including FHTC (Civil Part) with 3 (three) months trial run for proposed Mini Pipe W/S Scheme for Mouza - Gholshahi (Zone-II), Block: - Ghatal, District: - Paschim Midnapore under Midnapore Division, PHE Dte. | 6.04 | 2215162 | 25/03/2024 | VCH/000838/2023-2024 |
105 | Midnapore Division | BILL/01885/2023-2024 | 26/03/2024 | DIPAK KUMAR BAKLY | ORD/000288/2023-2024 | 3905/MD | 27/09/2023 | Sinking of Tube well, Rising Main & Accommodate FHTC (618 Nos.) including 2 years O&M under JJM with allied work for Hatihalka & adjoining Mouza W/S Scheme in Midnapore Sadar Block including supply of all labour & materials within Midnapore Sadar Sub | 28.37 | BP-2023-24-819 | 28/03/2024 | VCH/000909/2023-2024 |
106 | Midnapore Division | BILL/01630/2023-2024 | 12/03/2024 | SUJATA CONSTRUCTION | ORD/000127/2023-2024 | 2525/MD | 18/07/2023 | Sinking of Tube Well ,Laying distribution pipe line, Pump House , Boundary Wall, soil investigation , 200 Cum OHR (Intze type with Raft foundation) & Accommodate FHTC (1847 nos.) under JJM with allied work including 02(Two )Years Operation & Maintenan | 44.03 | BP-2023-24-720 | 13/03/2024 | VCH/000985/2023-2024 |
107 | Midnapore Division | BILL/01634/2023-2024 | 12/03/2024 | NABA KUMAR BHUNIA | ORD/000126/2023-2024 | 2524/MD | 18/07/2023 | Construction of Different Capacity R.C.C Over Head Reservoir Over Pile / Raft Foundation including Sub-soil investigation works for Construction of Over Head Reservoir with laying distribution system, Sinking of Tube Well, Pump House, Boundary Wall & Pro | 281.96 | 712-713-714 | 13/03/2024 | VCH/000984/2023-2024 |
108 | Midnapore Division | BILL/01765/2023-2024 | 14/03/2024 | ABASH SARADAMOY UNNAYN PARISHAD | null | 183/RWS/MID | 11/03/2024 | Remuneration bill for the NGO Managed Laboratory Personnel from Nov. 2023 to Jan. 2024. | 1.35 | 2215162 | 18/03/2024 | VCH/000834/2023-2024 |
109 | Midnapore Division | BILL/01130/2023-2024 | 22/01/2024 | CHAKRBORTTI ENTERPRISE | ORD/000542/2022-2023 | 2673/MD | 30/12/2022 | Soil investigation work in connection with Construction of RCC OHR, Construction & Commissioning of 150 CuM RCC OHR with FHTC works for Panna W/S Scheme within Ghatal Block of Ghatal Sub-Division under Midnapore Division, PHE Dte. (PART- C) | 12.59 | BP-2023-24-570 | 25/01/2024 | VCH/000738/2023-2024 |
110 | Midnapore Division | BILL/01149/2023-2024 | 24/01/2024 | BANERJEE CONSTRUCTION | ORD/000269/2020-2021 | 1466/MD | 26/11/2020 | Retrofitting to accommodate FHTC under JJM in Bural (Zone-II) W/S Scheme, Block: - Sabang, District: - Paschim Medinipur within Midnapore Division, PHE Dte. | 0.85 | BP-2023-24-600 | 01/02/2024 | VCH/000933/2023-2024 |
111 | Midnapore Division | BILL/01175/2023-2024 | 25/01/2024 | BANERJEE CONSTRUCTION | ORD/000470/2022-2023 | 2188/MD | 01/11/2022 | Laying distribution pipe line, Soil test and Construction of R.C.C. Over Head Reservoir of capacity 200 Cum and staging height 20.00 mtr. with allied work under Augmentation of Belda Zone-II & its adjoining moujas Water Supply Scheme within Narayangarh | 68.44 | BP-2023-24-584 | 30/01/2024 | VCH/000888/2023-2024 |
112 | Midnapore Division | BILL/01183/2023-2024 | 25/01/2024 | MIDNAPUR PIPE CONCERN | ORD/000218/2023-2024 | 2871/MD | 10/08/2023 | Sinking of Tube well, Laying distribution pipe line, Rising Main, Pump House, Boundary wall & Accommodate FHTC (576 Nos.) including 2 years O&M under JJM with allied work for Mahadevchak & adjoining Mouza W/S Scheme in Midnapore Sadar Block including | 48.45 | BP-2023-24-594 | 30/01/2024 | VCH/000721/2023-2024 |
113 | Midnapore Division | BILL/01184/2023-2024 | 25/01/2024 | DIPAK KUMAR DOLAI | ORD/000050/2020-2021 | 1063/MD | 18/09/2020 | Laying Distribution system of uPVC (Class - III) & DI (K-7) pipe line for Khasbar & its adjoining mouzas W/S Scheme (Zone-I) within Ghatal Block under Midnapore Division, PHE Dte. | 7.50 | BP-2023-24-583 | 30/01/2024 | VCH/000887/2023-2024 |
114 | Midnapore Division | BILL/01192/2023-2024 | 29/01/2024 | GOBINDA MAITY | ORD/000075/2023-2024 | 2422/MD | 13/07/2023 | Sinking of Tube Well, Laying distribution pipe line, Pump House, Boundary Wall, Soil investigation, Construction of 450 cum OHR each (Intze type with pile foundation) & Accommodate FHTC (6283 Nos.) under JJM with allied work for Purshuri & Ramkrishnap | 120.85 | 2023-24-589-590 | 30/01/2024 | VCH/000873/2023-2024 |
115 | Midnapore Division | BILL/01213/2023-2024 | 06/02/2024 | PULLOCK KUMAR GHOSH | ORD/000449/2023-2024 | 185/AE/MSSD | 29/05/2023 | Continuation work order for Hire charges of 1 no Motor Cab ( standard ) Commercial with Catalytic Converter attachment with Bharat stage as per prevalent applicable standard compliant new / not old than 30 ( Thirty ) months from the date of 1st. registrat | 0.88 | BP-2023-24-636 | 15/02/2024 | VCH/000744/2023-2024 |
116 | Midnapore Division | BILL/00019/2024-2025 | 12/04/2024 | PULLOCK KUMAR GHOSH | ORD/000222/2022-2023 | 1729/MD | 23/08/2022 | Construction & Commissioning including FHTC (Civil Part) with 3 (three) months trial run for proposed Mini Pipe W/S Scheme for Mouza - Bhagirathpur (Zone-I), Block: - Ghatal, District: - Paschim Midnapore under Midnapore Division, PHE Dte. | 18.65 | BP-2024-25-23 | 15/04/2024 | VCH/000003/2024-2025 |
117 | Midnapore Division | BILL/00240/2023-2024 | 15/06/2023 | ARNAB PATRA | ORD/000147/2022-2023 | 381/AE/KSD | 30/06/2022 | Construction of 3.60 X 3.00 Mtr. Switch Room Cum Chlorine Room with out W.C. & Bath for 2nd Tube Well site under Paschim Beguni W/S Scheme within Debra Block under Kharagpur Sub-Division of Midnapore Division, PHE Dte. | 3.36 | BP-2023-24-609 | 05/02/2024 | VCH/000936/2023-2024 |
118 | Midnapore Division | BILL/01056/2023-2024 | 15/01/2024 | KANGSABATI GUCHHA SAMITY | null | 86/MD | 11/01/2024 | Remuneration of the Lab personnel of the NGO managed Laboratory under Midnapore Division, PHE Dte. | 1.80 | BP-2023-24-545 | 19/01/2024 | VCH/000776/2023-2024 |
119 | Midnapore Division | BILL/01088/2023-2024 | 17/01/2024 | DULAL CHANDRA DAS | ORD/000483/2022-2023 | 2274/MD | 09/11/2022 | Construction and commissioning of RCC Over Head Reservoir (Intze type with solid raft) of capacity 350 cum and staging height 20 mtr. as per approved drawing (No:- PC-I/OHR/12/2012) with allied works for Sauri Kotbar and its adjoining mouzas W/S Scheme i | 31.86 | BP-2023-24-573 | 25/01/2024 | VCH/000885/2023-2024 |
120 | Midnapore Division | BILL/01091/2023-2024 | 17/01/2024 | GOUTAM PARIA | ORD/000024/2023-2024 | 946/MD | 05/04/2023 | Sinking of Tube well, Laying distribution pipe line with Rising main, Switch Room (3750 X 2550) along with PVC water storage OHR having capacity 20.00 Cum & St. Ht. 8.50 Mtr. erected over roof of Switch Room by M.S. fabricated structure, FHTC (261 Nos.) & | 17.71 | BP-2023-24-571 | 25/01/2024 | VCH/000884/2023-2024 |
121 | Midnapore Division | BILL/00968/2023-2024 | 08/12/2023 | UTSAV AGENCY | ORD/000157/2023-2024 | 226/RWS/MID | 05/06/2023 | Chemicals and other required items related to smooth functioning of NABL Recognition of Serbera Sub District Laboratory, under Midnapore Division PHE Dte. | 0.96 | BP-2023-24-553 | 17/01/2024 | VCH/000876/2023-2024 |
122 | Midnapore Division | BILL/01026/2023-2024 | 28/12/2023 | GOBINDA MAITY | ORD/000205/2023-2024 | 2821/MD | 07/08/2023 | Construction of Different Capacity R.C.C Over Head Reservoir Over Pile / Raft Foundation works for Construction of Over Head Reservoir with Laying distribution system, Sinking of Tube Well, Pump House, Boundary wall & Providing Functional Household Tap C | 174.08 | 2023-24-522-523 | 16/01/2024 | VCH/000839/2023-2024 |
123 | Midnapore Division | BILL/01032/2023-2024 | 28/12/2023 | PRITI ENTERPRISE | ORD/000673/2022-2023 | 782/MD | 17/03/2023 | Construction & Commissioning including FHTC with 3 (three) months trial run for proposed Mini Pipe W/S Scheme within Block Chandrakona-I at Mouza-Paikpara, JL-267 in Paschim Medinipur District under Midnapore Division, PHE Dte. [PART-A] | 8.84 | BP-2023-24-520 | 04/01/2024 | VCH/000710/2023-2024 |
124 | Midnapore Division | BILL/01042/2023-2024 | 04/01/2024 | PROVAT KUMAR DE | ORD/000375/2022-2023 | 1958/MD | 20/09/2022 | Laying distribution pipe line, Soil test & Construction of R.C.C. Over Head Reservoir of capacity 100 Cum and staging height 20.00 mtr. with allied work including Sinking of 250mm x 150mm x 190m deep tube well for Augmentation of Sarta-Sijua W/S Scheme | 3.73 | BP-2023-24-598 | 01/02/2024 | VCH/000758/2023-2024 |
125 | Midnapore Division | BILL/01332/2023-2024 | 05/03/2024 | M/S. D.K.H.CONSTRUCTION | ORD/000245/2023-2024 | 3100/MD | 25/08/2023 | Sinking of Tube well, Laying distribution pipe line, Rising Main, Pump House, Boundary wall, & Accommodate FHTC (659 Nos.) including 2 years O&M under JJM with allied work for Pachra & adjoining Mouza W/S Scheme in Midnapore Sadar Block including supply | 90.87 | BP-2023-24-696 | 06/03/2024 | VCH/000761/2023-2024 |
126 | Midnapore Division | BILL/01232/2023-2024 | 09/02/2024 | MADE AND TRADE CO. | ORD/000208/2023-2024 | 2824/MD | 07/08/2023 | Construction of 150 Cum, 200 Cum & 250 Cum Capacity R.C.C Over Head Reservoir Over (Intze type with solid raft) works with Laying of Rising Main, Distribution system, Sinking of Tube Well, Pump House & Providing Functional Household Tap Connection (5061 N | 208.91 | 2023-24-637-639 | 15/02/2024 | VCH/000823/2023-2024 |
127 | Midnapore Division | BILL/01248/2023-2024 | 19/02/2024 | GOBINDA MAITY | ORD/000752/2022-2023 | 709/MD | 06/03/2023 | Continuation Work Order for the work of Additional Retrofitting to accommodate FHTC under JJM in Palashi Water Supply Scheme, Block: - Debra, District: - Paschim Medinipur within Midnapore Division, P.H.E. Dte. | 30.27 | BP-2023-24-653 | 23/02/2024 | VCH/000749/2023-2024 |
128 | Midnapore Division | BILL/01250/2023-2024 | 19/02/2024 | SANJIT SINHA | ORD/000339/2023-2024 | 700/AE/MSSD | 06/10/2023 | Sinking of Rig bored Tube well of 150 X 100 mm dia. X 200 Mtr. Depth for boosting perpose of Pirakata Water supply Scheme under Midnapore Division, PHE Dte. | 6.21 | BP-2023-24-658 | 21/02/2024 | VCH/000953/2023-2024 |
129 | Midnapore Division | BILL/01251/2023-2024 | 19/02/2024 | PULLOCK KUMAR GHOSH | ORD/000223/2022-2023 | 1730/MD | 23/08/2022 | Construction & Commissioning including FHTC (Civil Part) with 3 (three) months trial run for proposed Mini Pipe W/S Scheme for Mouza - Bhagirathpur (Zone-II), Block: - Ghatal, District: - Paschim Midnapore under Midnapore Division, PHE Dte. | 12.78 | BP-2023-24-655 | 20/02/2024 | VCH/000915/2023-2024 |
130 | Midnapore Division | BILL/01252/2023-2024 | 19/02/2024 | S.N ENTERPRISE | ORD/000466/2022-2023 | 2186/MD | 01/11/2022 | Sinking of 200 mm x 100 mm dia. X 156 Mtr. Depth Rig bored Tube wells at 2nd Tube well site with Laying of uPVC (Class-III) & DI pipeline with FHTC works, Construction of 3.60 Mtr. X 3.00 Mtr. Switch Room & Boundary wall, Laying of Rising main at 2nd T/W | 5.62 | BP-2023-24-657 | 21/02/2024 | VCH/000842/2023-2024 |
131 | Midnapore Division | BILL/01260/2023-2024 | 21/02/2024 | KISHORE GHOSH | ORD/000639/2022-2023 | 557/MD | 22/02/2023 | Construction & Commissioning including FHTC (Civil Part) with 3 (three) months trial run for proposed Mini Pipe W/S Scheme for Mouza - Gholshahi (Zone-II), Block: - Ghatal, District: - Paschim Midnapore under Midnapore Division, PHE Dte. | 22.32 | BP-2023-24-662 | 22/02/2024 | VCH/000820/2023-2024 |
132 | Midnapore Division | BILL/01266/2023-2024 | 22/02/2024 | ASHIM KUMAR DEY | ORD/000390/2023-2024 | 5064/MD | 26/10/2023 | Sinking of Tube Well ,Laying of Rising Main ,Laying distribution pipe line, Pump House , Boundary Wall , soil investigation , 100 cum OHR( Torch type with solid raft ) & Accommodate FHTC (529 Nos.) including 2 years operation & maintenance under JJM wit | 16.22 | BP-2023-24-666 | 22/02/2024 | VCH/000961/2023-2024 |
133 | Midnapore Division | BILL/01294/2023-2024 | 27/02/2024 | GOBINDA MAITY | ORD/000091/2023-2024 | 2465/MD | 14/07/2023 | Sinking of Tube wells, Construction of 250 CuM Capacity R.C.C Over Head Reservoirs (Over Raft Foundation) including Sub-Soil investigation works with Laying distribution system, Pump Houses, Boundary walls & Providing Functional Household Tap Connection | 100.48 | BP-2023-24-679 | 29/02/2024 | VCH/000881/2023-2024 |
134 | Midnapore Division | BILL/01299/2023-2024 | 28/02/2024 | MIDNAPUR PIPE CONCERN | ORD/000078/2023-2024 | 2425/MD | 13/07/2023 | Installation of 250mm X 150mm X 150 Mtr. Depth Rig bore Tube well (2 Nos.) under JJM with allied work for Hariatara PWSS (Zone-I) in Kharagpur-I block including supply of all labour & materials within Kharagpur Sub-Division under Midnapore Division, PHE D | 13.13 | BP-2023-24-691 | 05/03/2024 | VCH/000844/2023-2024 |
135 | Midnapore Division | BILL/01631/2023-2024 | 12/03/2024 | UNIQUE AGENCY | ORD/000264/2023-2024 | 3238/MD | 11/09/2023 | Sinking of Tube Well, Laying distribution pipe line, Pump House, Boundary Wall, Soil investigation, 400 cum OHR (Intze type with pile foundation) & Accommodate FHTC (2,522 Nos.) under JJM including Two years O&M with allied work for Lakshipur PWSS i | 184.41 | BP-2023-24-719 | 13/03/2024 | VCH/000849/2023-2024 |
136 | Midnapore Division | BILL/01632/2023-2024 | 12/03/2024 | HIRAK KUMAR GHOSH | ORD/000785/2023-2024 | 507/MD | 27/02/2024 | Installation of Display Board for JJM work at different Piped Water Supply Scheme under different block within Midnapore Division, PHE Dte. [PART-B] | 0.96 | BP-2023-24-721 | 13/03/2024 | VCH/000986/2023-2024 |
137 | Midnapore Division | BILL/01178/2023-2024 | 25/01/2024 | GOUTAM RAY | ORD/000019/2023-2024 | 938/MD | 04/04/2023 | Laying distribution pipe line & Accommodate FHTC (307 nos.) under JJM with allied work for Piasala & its adjoining mouzas PWSS in Garbeta-II block including supply of all labour & materials within Midnapore Sadar Sub-Division under Midnapore Division, PH | 18.11 | BP-2023-24-591 | 31/01/2024 | VCH/000719/2023-2024 |
138 | Midnapore Division | BILL/01182/2023-2024 | 25/01/2024 | GARHBETA-1 UNEMPLOYED YOUTH ENGINEERS CO-OPERATIVE SOCIETY LTD. | ORD/000116/2023-2024 | 2517/MD | 18/07/2023 | Sinking of 2 (Two) Nos. Tube well for Amlasuli & its adjoining mouzas (Zone-I) PWSS in Garhbeta-II block including supply of all labour & materials under Midnapore Sadar Sub-Division of Midnapore Division, P.H.E. Dte. in Paschim Medinipur District. | 7.80 | BP-2023-24-599 | 01/02/2024 | VCH/000827/2023-2024 |
139 | Midnapore Division | BILL/01202/2023-2024 | 02/02/2024 | DIPAK KUMAR BAKLY | ORD/000504/2022-2023 | 2517/MD | 09/12/2022 | Sinking of Tube Well, Laying distribution pipe line, Pump House, Boundary wall with allied work for Augmentation of Gobardhanpur & its adjoining mouzas W/S Scheme in Pingla Block including supply of all labour & materials within Kharagpur Sub-Division | 26.53 | BP-2023-24-605 | 05/02/2024 | VCH/000934/2023-2024 |
140 | Midnapore Division | BILL/01904/2023-2024 | 26/03/2024 | AJITESH ACHARJEE | ORD/000726/2022-2023 | 868/MD | 28/03/2023 | Construction & Commissioning including FHTC with 3 (three) months trial run for proposed Mini Pipe W/S Scheme within Block Kharagpur-I at Mouza-Kankuria, JL-281 in Paschim Medinipur District under Midnapore Division, PHE Dte. | 0.19 | 2215162 | 29/03/2024 | VCH/000916/2023-2024 |
141 | Midnapore Division | BILL/01925/2023-2024 | 27/03/2024 | MIDNAPUR PIPE CONCERN | ORD/000217/2023-2024 | 2870/MD | 10/08/2023 | Sinking of Tube well, Laying distribution pipe line, Rising main, Pump House, Boundary wall & Accommodate FHTC (500 Nos.) including 2 years O&M under JJM with allied work for Sholkamari & adjoining Mouza W/S Scheme in Midnapore Sadar Block including supp | 15.48 | BP-2023-24-778 | 27/03/2024 | VCH/000912/2023-2024 |
142 | Midnapore Division | BILL/01053/2023-2024 | 15/01/2024 | PALLIMANGAL GUCHHA SAMITY | null | 86/MD | 11/01/2024 | Remuneration of the Lab personnel of the NGO managed Laboratory under Midnapore Division, PHE Dte. | 1.80 | BP-2023-24-543 | 17/01/2024 | VCH/000772/2023-2024 |
143 | Midnapore Division | BILL/01055/2023-2024 | 15/01/2024 | KESHPUR SHAHID KSHUDIRAM SEVA SAMITY | null | 86/MD | 11/01/2024 | Remuneration of the Lab personnel of the NGO managed Laboratory under Midnapore Division, PHE Dte. | 1.80 | BP-2023-24-544 | 17/01/2024 | VCH/000774/2023-2024 |
144 | Midnapore Division | BILL/01090/2023-2024 | 17/01/2024 | M/S BISWANATH CONSTRUCTION | ORD/000138/2023-2024 | 2622/MD | 24/07/2023 | Sinking of 2 (Two) Nos. Tube well for Bulanpur & its adjoining mouzas (Zone-I) PWSS in Garhbeta-II block including supply of all labour & materials under Midnapore Sadar Sub-Division of Midnapore Division, P.H.E. Dte. in Paschim Medinipur District. | 14.62 | BP-2023-24-574 | 25/01/2024 | VCH/000886/2023-2024 |
145 | Midnapore Division | BILL/01027/2023-2024 | 28/12/2023 | M/S R.N. ENTERPRISE | ORD/000255/2023-2024 | 3150/MD | 29/08/2023 | Sinking of Tube Well, Laying distribution pipe line, Pump House, Balance FHTC (211 Nos.) & Repair of Boundary Wall, Pump House & 250 cum OHR for Augmentation of Ragpur PWSS in Pingla Block including supply of all labour & materials within Kharagpur Sub-D | 61.35 | BP-2023-24-521 | 04/01/2024 | VCH/000715/2023-2024 |
146 | Midnapore Division | BILL/01033/2023-2024 | 28/12/2023 | MIDNAPUR PIPE CONCERN | ORD/000217/2023-2024 | 2870/MD | 10/08/2023 | Sinking of Tube well, Laying distribution pipe line, Rising main, Pump House, Boundary wall & Accommodate FHTC (500 Nos.) including 2 years O&M under JJM with allied work for Sholkamari & adjoining Mouza W/S Scheme in Midnapore Sadar Block including supp | 48.56 | BP-2023-24-525 | 16/01/2024 | VCH/000709/2023-2024 |
147 | Midnapore Division | BILL/01313/2023-2024 | 01/03/2024 | SAJAL JANA | ORD/000184/2023-2024 | 2737/MD | 01/08/2023 | Sinking of Three nos. 250 X 150 mm dia. X 200 mtr. Depth deep tube well by direct rotary method under JJM with allied work for Tatarpur PWSS in Daspur-I block including supply of all labour & materials within Ghatal Sub-Division under Midnapore Division, | 24.96 | BP-2023-24-692 | 05/03/2024 | VCH/000975/2023-2024 |
148 | Midnapore Division | BILL/01316/2023-2024 | 04/03/2024 | KANGSABATI GUCHHA SAMITY | null | 5114/MD | 01/11/2023 | Remuneration for the month of October 2023. | 0.14 | BP-2023-24-705 | 11/03/2024 | VCH/000954/2023-2024 |
149 | Midnapore Division | BILL/01317/2023-2024 | 04/03/2024 | KESHPUR SHAHID KSHUDIRAM SEVA SAMITY | null | 5114/MD | 01/11/2023 | Remuneration for the month of October 2023. | 0.14 | BP-2023-24-706 | 11/03/2024 | VCH/000955/2023-2024 |
150 | Midnapore Division | BILL/01320/2023-2024 | 04/03/2024 | ABASH SARADAMOY UNNAYN PARISHAD | null | 5114/MD | 01/11/2023 | Remuneration for the month of October 2023. | 0.14 | BP-2023-24-709 | 11/03/2024 | VCH/000958/2023-2024 |
151 | Midnapore Division | BILL/01325/2023-2024 | 04/03/2024 | SUBHASIS DOLAI | ORD/000172/2023-2024 | 2674/MD | 26/07/2023 | Laying distribution pipe line, Accommodate FHTC (135 Nos.) under JJM with allied work including 1 year O & M for Deulbere PWSS in Chandrakona-II block including supply of all labour & materials within Ghatal Sub-Division under Midnapore Division, PHE | 22.26 | BP-2023-24-694 | 06/03/2024 | VCH/000977/2023-2024 |
152 | Midnapore Division | BILL/01229/2023-2024 | 08/02/2024 | NAYAN CONSTRUCTION | ORD/001036/2022-2023 | 984/AE/MSSD | 17/03/2023 | Repair and Rennovation of Switch Room cum Chlorine Room ( No. 2 ) of Chandrakona Road Water Supply Scheme ( Zone-II ) within Midnapore Sadar Sub Division under Midnapore Division, PHE Dte. (SL No-03) | 0.96 | BP-2023-24-664 | 22/02/2024 | VCH/000760/2023-2024 |
153 | Midnapore Division | BILL/01230/2023-2024 | 08/02/2024 | WATER LINK | ORD/000084/2023-2024 | 2431/MD | 13/07/2023 | Sinking of Tube well, Laying distribution pipe line, Rising main, Pump House, Boundary wall & Accommodate FHTC (105 Nos.) including 2 yrs. O & M under JJM with allied work for Dwarkhola PWSS in Chandrakona-I block including supply of all labour & materia | 14.89 | BP-2023-24-641 | 15/02/2024 | VCH/000750/2023-2024 |
154 | Midnapore Division | BILL/01239/2023-2024 | 12/02/2024 | M/S. D.K.H.CONSTRUCTION | ORD/000035/2023-2024 | 1337/MD | 28/04/2023 | Sinking of Tube Well, Laying distribution pipe line, Pump House, Boundary Wall, Soil investigation, 300 cum OHR (Intze type with pile foundation) & Accommodate FHTC (2,225 nos.) under JJM with allied work for Dwandbipur PWSS in Ghatal Block including sup | 27.56 | BP-2023-24-640 | 15/02/2024 | VCH/000944/2023-2024 |
155 | Midnapore Division | BILL/01296/2023-2024 | 27/02/2024 | WATER LINK | ORD/000084/2023-2024 | 2431/MD | 13/07/2023 | Sinking of Tube well, Laying distribution pipe line, Rising main, Pump House, Boundary wall & Accommodate FHTC (105 Nos.) including 2 yrs. O & M under JJM with allied work for Dwarkhola PWSS in Chandrakona-I block including supply of all labour & materia | 11.00 | BP-2023-24-684 | 04/03/2024 | VCH/000972/2023-2024 |
156 | Midnapore Division | BILL/01821/2023-2024 | 21/03/2024 | M/S. A.R. ENTERPRISE | ORD/000227/2022-2023 | 1734/MD | 23/08/2022 | Laying distribution pipe line, Soil test and Construction of R.C.C. Over Head Reservoir of capacity 200 Cum and staging height 20.00 mtr. with allied work including supply of all labour & materials for Augmentation of Keshiary & its adjoining mouzas Wate | 166.23 | 2215162 | 28/03/2024 | VCH/000856/2023-2024 |
157 | Midnapore Division | BILL/01761/2023-2024 | 14/03/2024 | KANGSABATI GUCHHA SAMITY | null | 183/RWS/MID | 11/03/2024 | Remuneration bill for the NGO Managed Laboratory Personnel from Nov. 2023 to Jan. 2024. | 1.35 | 2215162 | 20/03/2024 | VCH/000830/2023-2024 |
158 | Midnapore Division | BILL/01762/2023-2024 | 14/03/2024 | KESHPUR SHAHID KSHUDIRAM SEVA SAMITY | null | 183/RWS/MID | 11/03/2024 | Remuneration bill for the NGO Managed Laboratory Personnel from Nov. 2023 to Jan. 2024. | 1.35 | 2215162 | 19/03/2024 | VCH/000831/2023-2024 |
159 | Midnapore Division | BILL/01763/2023-2024 | 14/03/2024 | BELDA SAURYA PRABHA GUCHHA SAMITI | null | 183/RWS/MID | 11/03/2024 | Remuneration bill for the NGO Managed Laboratory Personnel from Nov. 2023 to Jan. 2024. | 1.35 | 2215162 | 18/03/2024 | VCH/000832/2023-2024 |
160 | Midnapore Division | BILL/01428/2023-2024 | 06/03/2024 | GOBINDA MAITY | ORD/000171/2022-2023 | 1242/MD | 20/06/2022 | Continuation Work Order for the work of 'Retrofitting of Jot Ghanashyam Piped Water Supply Scheme to accommodate FHTC under Jal Swapna including Sinking of 1 nos. Tube Well and other allied Works in Daspur-II Block of Paschim Medinipur District under Midn | 12.36 | BP-2023-24-703 | 07/03/2024 | VCH/000982/2023-2024 |
161 | Midnapore Division | BILL/01433/2023-2024 | 06/03/2024 | MIDNAPUR PIPE CONCERN | ORD/000389/2023-2024 | 5063/MD | 26/10/2023 | Sinking of Tube Well ,Laying distribution pipe line, Pump House , Boundary Wall, soil investigation , 300 Cum OHR (Intze type with Pile foundation) & Accommodate FHTC (1946 nos.) under JJM with allied work including 02(Two )Years Operation & Mainten | 152.83 | BP-2023-24-704 | 07/03/2024 | VCH/000983/2023-2024 |
162 | Midnapore Division | BILL/01174/2023-2024 | 25/01/2024 | M/S. EL-CON | ORD/000063/2023-2024 | 2144/MD | 08/06/2023 | Sinking of Tube Well, Laying distribution pipe line, Pump House, Boundary Wall, soil investigation, 300 Cum OHR (Intze type with Pile foundation) & Accommodate FHTC (2432 nos.) under JJM with allied work including 02 (Two) Years Operation & Maintenance | 78.32 | BP-2023-24-581 | 30/01/2024 | VCH/000731/2023-2024 |
163 | Midnapore Division | BILL/01197/2023-2024 | 01/02/2024 | NABA KUMAR BHUNIA | ORD/000126/2023-2024 | 2524/MD | 18/07/2023 | Construction of Different Capacity R.C.C Over Head Reservoir Over Pile / Raft Foundation including Sub-soil investigation works for Construction of Over Head Reservoir with laying distribution system, Sinking of Tube Well, Pump House, Boundary Wall & Pro | 264.14 | 23-24-611-613 | 05/02/2024 | VCH/000766/2023-2024 |
164 | Midnapore Division | BILL/01907/2023-2024 | 26/03/2024 | ANIRUDDHA BAG | ORD/000128/2023-2024 | 2526/MD | 18/07/2023 | Sinking of Tube Well, Laying distribution pipe line, Rising Main, Pump House, Boundary Wall, Soil investigation, Construction of 350 Cum RCC Over Head Reservoir (Intze type with solid raft) & Accommodate FHTC (1976 Nos.) including Two years O&M under JJM | 76.20 | BP-2023-24-814 | 28/03/2024 | VCH/000964/2023-2024 |
165 | Midnapore Division | BILL/01966/2023-2024 | 27/03/2024 | K & KABERI ENTERPRISE (PROP. GOUTAM MAITY) | ORD/000951/2022-2023 | 729/AE/KSD | 10/11/2022 | Training Programme in connection with skilling of Man power to Generate Employment Oppurtunities and to support implimentation of Jal Jeevan Mission Programme at different Places within Midnapore Division P.H.E Dte. (Part-A) ( Kharagpur-I Block) | 0.70 | 221530 | 29/03/2024 | VCH/000929/2023-2024 |
166 | Midnapore Division | BILL/00499/2023-2024 | 21/08/2023 | GOBINDA MAITY | ORD/000499/2022-2023 | 2364/MD | 21/11/2022 | Sinking of Tube Well ,Laying distribution pipe line, Pump House, Boundary wall, Soil investigation, 400 CuM OHR (Intze type with pile foundation) & Accommodate FHTC under JJM with allied work for (i) Ranichak & its adjoining mouzas W/S Scheme, (ii) J | 6.76 | BP-2023-24-576 | 25/01/2024 | VCH/000905/2023-2024 |
167 | Midnapore Division | BILL/00361/2023-2024 | 18/07/2023 | DEBJYOTI BASU | ORD/001556/2021-2022 | 175/MMSD-I | 17/02/2022 | Additional work in connection with sinking of (150mmX100mmX150mtr) RBTW by Rotary method at Daspur water supply scheme, tube well no.-1 of Sabang Block of PaschimMidnapur Dist. under MMD PHE Dte. | 0.35 | BP-2023-24-575 | 25/01/2024 | VCH/000763/2023-2024 |
168 | Midnapore Division | BILL/00342/2022-2023 | 17/02/2023 | GOBINDA MAITY | ORD/000499/2022-2023 | 2364/MD | 21/11/2022 | Sinking of Tube Well ,Laying distribution pipe line, Pump House, Boundary wall, Soil investigation, 400 CuM OHR (Intze type with pile foundation) & Accommodate FHTC under JJM with allied work for (i) Ranichak & its adjoining mouzas W/S Scheme, (ii) J | 92.06 | 2215162 | 23/02/2024 | VCH/001705/2022-2023 |
169 | Midnapore Division | BILL/01045/2023-2024 | 09/01/2024 | SWACH ENVIRONMENT PRIVATE LIMITED | ORD/000039/2023-2024 | 1355/MD | 02/05/2023 | Construction of Different Capacity R.C.C Over Head Reservoir Over Pile / Raft Foundation including sub soil investigation works for Construction of Over Head Reservoir with laying distribution system, Sinking of Tube Well, Pump House & laying of rising m | 268.88 | 2023-24-526-533 | 16/01/2024 | VCH/000746/2023-2024 |
170 | Midnapore Division | BILL/01052/2023-2024 | 15/01/2024 | BELDA SAURYA PRABHA GUCHHA SAMITI | null | 86/MD | 11/01/2024 | Remuneration of the Lab personnel of the NGO managed Laboratory under Midnapore Division, PHE Dte. | 1.80 | BP-2023-24-542 | 17/01/2024 | VCH/000771/2023-2024 |
171 | Midnapore Division | BILL/01059/2023-2024 | 16/01/2024 | S.N ENTERPRISE | ORD/000464/2022-2023 | 2184/MD | 01/11/2022 | Construction & Commissioning including FHTC (Civil Part) with 3 (three) months trial run for proposed Mini Pipe W/S Scheme for Mouza - Daspur (Zone-I), Block - Sabang, District - Paschim Medinipur under Midnapore Division, PHE Dte. | 28.35 | BP-2023-24-548 | 17/01/2024 | VCH/000764/2023-2024 |
172 | Midnapore Division | BILL/01129/2023-2024 | 22/01/2024 | SUJATA CONSTRUCTION | ORD/000518/2022-2023 | 2593/MD | 20/12/2022 | Construction and commissioning of RCC Over Head Reservoir (Intze type with solid raft) of capacity 300 cum and staging height 20 mtr as per approved drawing (No:- PC-I/OHR/07/2012) with allied works for Dhaneswarpur & its adjoining mouzas W/S Scheme in Pi | 9.15 | BP-2023-24-568 | 25/01/2024 | VCH/000882/2023-2024 |
173 | Midnapore Division | BILL/00963/2023-2024 | 08/12/2023 | UTSAV AGENCY | ORD/000151/2023-2024 | 216/RWS/MID | 26/05/2023 | Chemicals and other required items related to smooth functioning of NABL Recognition of Kharagpur Sub District Laboratory, under Midnapore Division PHE Dte. | 0.96 | BP-2023-24-558 | 17/01/2024 | VCH/000863/2023-2024 |
174 | Midnapore Division | BILL/01024/2023-2024 | 21/12/2023 | M/S BLUE BIRD | ORD/000139/2023-2024 | 2623/MD | 24/07/2023 | Laying distribution pipe under JJM with allied work for Augmentation of Amrakuchi & its adjoining mouzas W/S Scheme in Keshpur block including supply of all labour & materials within Midnapore Sadar Sub-Division under Midnapore Division, PHE Dte. [PART-B] | 15.85 | BP-2023-24-524 | 16/01/2024 | VCH/000718/2023-2024 |
175 | Midnapore Division | BILL/01235/2023-2024 | 09/02/2024 | MANNA COMPUTER | ORD/000202/2023-2024 | 2816/MD | 07/08/2023 | Sinking of 2 (Two) Nos. Tube well for Tangasol & its adjoining mouzas (Zone-II i.e. II/I & II/II) PWSS in Kharagpur-I block including supply of all labour & materials under Kharagpur Sub-Division of Midnapore Division, P.H.E. Dte. in Paschim Medinipur Dis | 10.23 | BP-2023-24-646 | 19/02/2024 | VCH/000926/2023-2024 |
176 | Midnapore Division | BILL/01242/2023-2024 | 15/02/2024 | GARHBETA-1 UNEMPLOYED YOUTH ENGINEERS CO-OPERATIVE SOCIETY LTD. | ORD/000120/2023-2024 | 2520/MD | 18/07/2023 | Sinking of 3 (Three) Nos. Tube well for Rupnarayanpur & its adjoining mouzas (Zone-III) PWSS in Kharagpur-I block including supply of all labour & materials under Kharagpur Sub-Division of Midnapore Division, P.H.E. Dte. in Paschim Medinipur District. | 17.24 | BP-2023-24-645 | 19/02/2024 | VCH/000946/2023-2024 |
177 | Midnapore Division | BILL/01254/2023-2024 | 20/02/2024 | CONCORD ENGINEERING | ORD/000130/2022-2023 | 1364/MD | 08/07/2022 | Laying distribution pipe line, Soil test & Construction of R.C.C. Over Head Reservoir of capacity 900 Cum and staging height 20.00 mtr. & FHTC under JJM with allied work for Augmentation of Datan and its adjoining mouzas W/S Scheme in Datan-I Block incl | 144.51 | BP-2023-24-656 | 20/02/2024 | VCH/000952/2023-2024 |
178 | Midnapore Division | BILL/01297/2023-2024 | 28/02/2024 | GOBINDA MAITY | ORD/000064/2023-2024 | 2145/MD | 08/06/2023 | Construction of Different Capacity R.C.C Over Head Reservoir Over Pile / Raft Foundation works with laying rising main, distribution system , Sinking of Tube Well , Pump House , Boundary Wall, & Providing Functional Household Tap Connection (6348 Nos) in | 83.44 | 2023-24-685-686 | 04/03/2024 | VCH/000870/2023-2024 |
179 | Midnapore Division | BILL/01300/2023-2024 | 28/02/2024 | M/S. A.R. ENTERPRISE | ORD/000413/2021-2022 | 2018/MD | 03/12/2021 | Sinking of 1 (One) No. Replacement tube well including allied works for Retrofitting of Ground Water Based Baita PWSS to accommodate FHTC under JJM under Mohanpur block in Paschim Medinipur District under Midnapore Division, P.H.E. Dte. | 17.04 | BP-2023-24-688 | 03/03/2024 | VCH/000973/2023-2024 |
180 | Midnapore Division | BILL/01838/2023-2024 | 22/03/2024 | EVEREST CONSULTANT SERVICES | ORD/000173/2023-2024 | 2675/MD | 26/07/2023 | Laying distribution pipe line & Accommodate FHTC (400 Nos.) under JJM with allied work for Amlasuli & its adjoining mouzas W/S Scheme in Garbeta-II block including supply of all labour & materials within Midnapore Sadar Sub-Division under Midnapore Divisi | 39.08 | 221553 | 26/03/2024 | VCH/000987/2023-2024 |
181 | Midnapore Division | BILL/01851/2023-2024 | 22/03/2024 | MIDNAPUR PIPE CONCERN | ORD/000217/2023-2024 | 2870/MD | 10/08/2023 | Sinking of Tube well, Laying distribution pipe line, Rising main, Pump House, Boundary wall & Accommodate FHTC (500 Nos.) including 2 years O&M under JJM with allied work for Sholkamari & adjoining Mouza W/S Scheme in Midnapore Sadar Block including supp | 11.95 | BP-2023-24-786 | 27/03/2024 | VCH/000908/2023-2024 |
182 | Midnapore Division | BILL/01628/2023-2024 | 12/03/2024 | M/S. CARE | ORD/000265/2023-2024 | 3239/MD | 11/09/2023 | Sinking of Tube Well, Laying distribution pipe line, Rising Main, Pump House, Boundary Wall, Construction of 300 Cum OHR (Intze type Raft Foundation) & Accommodate FHTC (2,400 Nos.) including Two years O&M under JJM with allied work for Pathra & adjo | 15.37 | BP-2023-24-717 | 13/03/2024 | VCH/000829/2023-2024 |
183 | Midnapore Division | BILL/01701/2023-2024 | 13/03/2024 | M/S. CARE | ORD/000226/2023-2024 | 2926/MD | 16/08/2023 | Sinking of Tube Well, Laying distribution pipe line, Rising Main, Pump House, Boundary Wall, Construction of 250 (Intze type Raft Foundation) & Accommodate FHTC (2,237 Nos.) including Two years O&M under JJM with allied work for Panchkuri & adjoining | 17.30 | 2215162 | 18/03/2024 | VCH/000828/2023-2024 |
184 | Midnapore Division | BILL/01764/2023-2024 | 14/03/2024 | PALLIMANGAL GUCHHA SAMITY | null | 183/RWS/MID | 11/03/2024 | Remuneration bill for the NGO Managed Laboratory Personnel from Nov. 2023 to Jan. 2024. | 1.35 | 2215162 | 18/03/2024 | VCH/000833/2023-2024 |
185 | Midnapore Division | BILL/01766/2023-2024 | 14/03/2024 | SARBIK GRAM BIKASH KENDRA | null | 183/RWS/MID | 11/03/2024 | Remuneration bill for the NGO Managed Laboratory Personnel from Nov. 2023 to Jan. 2024. | 1.35 | 221530 | 18/03/2024 | VCH/000835/2023-2024 |
186 | Midnapore Division | BILL/01427/2023-2024 | 06/03/2024 | GOBINDA MAITY | ORD/000410/2021-2022 | 2015/MD | 03/12/2021 | Retrofitting of Jot Ghanashyam Piped Water Supply Scheme to accommodate FHTC under Jal Swapna including Sinking of 1 nos. Tube Well and other allied Works in Daspur-II Block of Paschim Medinipur District under Midnapore Division, PHE Dte. | 15.65 | BP-2023-24-701 | 07/03/2024 | VCH/000981/2023-2024 |
187 | Midnapore Division | BILL/01434/2023-2024 | 07/03/2024 | J.K. BUILDERS | ORD/000006/2023-2024 | 975/MD | 10/04/2023 | Laying distribution of Pipe line and Accommodate FHTC (459 Nos.) work for Proposed Sasha Bedia & its adjoining mouzas PWSS, Block-Garhbeta-II, Dist:- Paschim Medinipore under Midnapur Division, PHE Dte. [PART-V] | 27.86 | BP-2023-24-711 | 12/03/2024 | VCH/000843/2023-2024 |
188 | Midnapore Division | BILL/01173/2023-2024 | 25/01/2024 | BANERJEE CONSTRUCTION | ORD/000069/2023-2024 | 2420/MD | 13/07/2023 | Sinking of Tube Well, Laying distribution pipe line, Pump House, Boundary Wall soil investigation, 400 cum OHR (Intze type with pile foundation) & Accommodate FHTC (2725 nos) under JJM with allied work for Raniar PWSS in Keshpur Block including supply o | 113.80 | BP-2023-24-592 | 30/01/2024 | VCH/000890/2023-2024 |
189 | Midnapore Division | BILL/01208/2023-2024 | 05/02/2024 | GARHBETA-1 UNEMPLOYED YOUTH ENGINEERS CO-OPERATIVE SOCIETY LTD. | ORD/000569/2022-2023 | 119/MD | 10/01/2023 | Sinking of 4 (Four) nos. 250 x 150 mm dia. X 220 mtr. depth deep tube well by direct rotary method for Augmentation of Dantan W/S Scheme with in Datan-I Block under Midnapore Division, P.H.E. Dte. [Allotted for Sinking of 2 (Nos.) of Tube wells i.e. 50% o | 16.36 | BP-2023-24-623 | 07/02/2024 | VCH/000739/2023-2024 |
190 | Midnapore Division | BILL/01209/2023-2024 | 05/02/2024 | PULLOCK KUMAR GHOSH | ORD/000040/2023-2024 | 1356/MD | 02/05/2023 | Sinking of Tube well, Laying distribution pipe line & accommodate FHTC (118 Nos.) including 2 years O&M under JJM with allied work for Augmentation of Amrakuchi & its adjoining mouzas W/S Scheme in Keshpur block including supply of all labour & materials | 7.83 | BP-2023-24-622 | 07/02/2024 | VCH/000940/2023-2024 |
191 | Midnapore Division | BILL/01218/2023-2024 | 07/02/2024 | A R ENTERPRISE | ORD/000728/2022-2023 | 869/MD | 28/03/2023 | Construction & Commissioning including FHTC with 3 (three) months trial run for proposed Mini Pipe W/S Scheme within Block Daspur-II at Mouza-Arit, JL-220 in Paschim Medinipur District under Midnapore Division, PHE Dte. | 0.19 | BP-2023-24-659 | 22/02/2024 | VCH/000754/2023-2024 |
192 | Midnapore Division | BILL/01924/2023-2024 | 27/03/2024 | MIDNAPUR PIPE CONCERN | ORD/000096/2023-2024 | 2471/MD | 14/07/2023 | Laying distribution system pipe line & Accommodate FHTC (269 Nos.) under JJM with allied work for Hariatara PWSS (Zone-II) in Kharagpur-I block including supply of all labour & materials within Kharagpur Sub-Division under Midnapore Division, PHE Dte. [PA | 57.58 | BP-2023-24-803 | 28/03/2024 | VCH/000969/2023-2024 |
193 | Midnapore Division | BILL/01931/2023-2024 | 27/03/2024 | M/S. D.K.H.CONSTRUCTION | ORD/000245/2023-2024 | 3100/MD | 25/08/2023 | Sinking of Tube well, Laying distribution pipe line, Rising Main, Pump House, Boundary wall, & Accommodate FHTC (659 Nos.) including 2 years O&M under JJM with allied work for Pachra & adjoining Mouza W/S Scheme in Midnapore Sadar Block including supply | 41.08 | BP-2023-24-822 | 28/03/2024 | VCH/000910/2023-2024 |
194 | Midnapore Division | BILL/01967/2023-2024 | 27/03/2024 | K & KABERI ENTERPRISE (PROP. GOUTAM MAITY) | ORD/000941/2022-2023 | 828/A/AE/KSD | 10/12/2022 | Training Programme in connection with skilling of Man power to Generate Employment Oppurtunities and to support implimentation of Jal Jeevan Mission Programme at different Places within Midnapore Division P.H.E Dte. (Part-A) ( NARAYANGARH- Block) | 0.70 | BP-2023-24-447 | 29/03/2024 | VCH/000930/2023-2024 |
Total | 7,623.94 |