Sl. No. | Division
Working Divisions
|
Bill Number | Bill Date
Date of Issuance of the Work Order as per PHED-MIS
|
Vendor Name
Vendor Appointed Against this Work Order as per PHED-MIS
|
System Order Number
System generated Order No. for the Work Order as per PHED-MIS
|
Memo Number
Memo no. for Work Order Provided by the Divisions as per PHED-MIS
|
Order Date
Date of Issuance of the Work Order as per PHED-MIS
|
work_name
Name of the Work as per the Issued Work Order
|
Bill Gross Amount | Voucher Number | Voucher Date | System Voucher Number |
---|---|---|---|---|---|---|---|---|---|---|---|---|
0 | 5,314.97 | |||||||||||
1 | Midnapore Division | BILL/00583/2024-2025 | 03/09/2024 | GOBINDA MAITY | ORD/000205/2023-2024 | 2821/MD | 07/08/2023 | Construction of Different Capacity R.C.C Over Head Reservoir Over Pile / Raft Foundation works for Construction of Over Head Reservoir with Laying distribution system, Sinking of Tube Well, Pump House, Boundary wall & Providing Functional Household Tap C | 286.73 | BP-2024-25-324 | 05/09/2024 | VCH/000541/2024-2025 |
2 | Midnapore Division | BILL/00585/2024-2025 | 03/09/2024 | NATIONAL PROJECTS CONSTRUCTION CORPORATION LIMITED | ORD/000348/2023-2024 | 4000/MD | 06/10/2023 | Sinking of Tube Well, Laying distribution pipe line, Pump House, Boundary Wall, Soil investigation, 400 Cum OHR (Intze type with Pile foundation) & Accommodate FHTC (3,476 nos.) under JJM with allied work including 02 (Two ) Years Operation & Maintenance | 277.39 | BP-2024-25-328 | 05/09/2024 | VCH/000532/2024-2025 |
3 | Midnapore Division | BILL/00608/2024-2025 | 10/09/2024 | CMOH PASCHIM MEDINIPUR. (ASHA KORMI) | null | DH&FWS-Mid (W)/Asha/2024/1357 | 05/09/2024 | Remunation of Asha Kormi for the period of May 2023 to June 2024 | 42.43 | BP-2024-25-350 | 13/09/2024 | VCH/000549/2024-2025 |
4 | Midnapore Division | BILL/00539/2024-2025 | 30/08/2024 | RMN INFRASTRUCTURES LIMITED | ORD/000282/2023-2024 | 5091/MD | 30/10/2023 | Construction of Different Capacity R.C.C Over Head Reservoir Over Pile / Raft Foundation including Sub-Soil investigation works for Construction of Over Head Reservoir with laying distribution system, Sinking of Tube Well, Pump House, Boundary Wall & Pro | 366.76 | 2215162 | 01/09/2024 | VCH/000402/2024-2025 |
5 | Midnapore Division | BILL/00646/2024-2025 | 11/09/2024 | ABASH SARADAMOY UNNAYN PARISHAD | null | 1017/RWS/MID | 09/09/2024 | Laboratory Maintenance bill from October 2022 to September 2023. | 0.75 | 221515 | 13/09/2024 | VCH/000415/2024-2025 |
6 | Midnapore Division | BILL/00656/2024-2025 | 17/09/2024 | BADAL CHANDRA MAIKAP | ORD/000113/2023-2024 | 2514/MD | 18/07/2023 | Sinking of 1 (One) Nos. Tube well for Mahasol & its adjoining mouzas PWSS in Salboni block including supply of all labour & materials under Midnapore Sadar Sub-Division of Midnapore Division, P.H.E. Dte. in Paschim Medinipur District. (Part-II) | 7.49 | BP-2024-25-361 | 20/09/2024 | VCH/000553/2024-2025 |
7 | Midnapore Division | BILL/00534/2024-2025 | 30/08/2024 | DIPAK KUMAR DOLAI | ORD/000374/2022-2023 | 1957/MD | 20/09/2022 | Laying distribution pipe line, soil test & construction of R.C.C. Over Head Reservoir of capacity 250 Cum ( Pile Foundation) and staging height 20.00 mtr. & FHTC under JJM with allied work for Kotulpur and its adjoining mouzas W/S scheme in Ghatal Bloc | 99.42 | BP-2024-25-320 | 03/09/2024 | VCH/000528/2024-2025 |
8 | Midnapore Division | BILL/00591/2024-2025 | 05/09/2024 | SANKAR PRASAD MAITY | ORD/000083/2023-2024 | 2430/MD | 13/07/2023 | Sinking of Tube well, Laying distribution pipeline & Construction of Pump House for Rejuvenation of Ground Water Based PWSS for Bhemwa (Part) under JJM of Sabang block in Paschim Medinipur District under Midnapore Division, PHE Dte. | 21.81 | BP-2024-25-336 | 10/09/2024 | VCH/000535/2024-2025 |
9 | Midnapore Division | BILL/00593/2024-2025 | 05/09/2024 | ASHIM KUMAR DEY | ORD/000783/2023-2024 | 1176/AE/MSSD | 29/02/2024 | Hiring of 1 ( one) no Motor Cab ( standard ) Commercial with Catalytic Converter attachment with Bharat stage as per prevalent applicable standard compliant new / not old than 30 ( Thirty ) months from the date of 1st. registration on daily hire rate basi | 0.40 | BP-2024-25-330 | 10/09/2024 | VCH/000393/2024-2025 |
10 | Midnapore Division | BILL/00538/2024-2025 | 30/08/2024 | SUJOY KUMAR MANDAL | ORD/000512/2023-2024 | 5480/MD | 13/12/2023 | Sinking of Tube Wells, Laying distribution pipe line, Rising Main, Pump House, Boundary Wall, Soil investigation, Construction of Two nos. 150 cum & 450 cum OHRs & Accommodate FHTC (3,044 Nos.) including Two years O&M under JJM with allied work for Go | 193.54 | BP-2024-25-317 | 02/09/2024 | VCH/000308/2024-2025 |
11 | Midnapore Division | BILL/00642/2024-2025 | 11/09/2024 | BELDA SAURYA PRABHA GUCHHA SAMITI | null | 1017/RWS/MID | 09/09/2024 | Laboratory Maintenance bill from October 2022 to September 2023. | 0.75 | 221515 | 13/09/2024 | VCH/000411/2024-2025 |
12 | Midnapore Division | BILL/00648/2024-2025 | 12/09/2024 | MANISHIKA CONSTRUCTION | ORD/000188/2023-2024 | 2802/MD | 07/08/2023 | Sinking of 2 (Two) nos. 250 X 150 X 170 mtr. depth deep Tube well (Zone-I) for Proposed Mohar- Katina & its adjoining mouzas PWSS, Block- Sabong, Dist:- Paschim Medinipur under Midnapur Division, PHE Dte. [PART-A] | 16.86 | BP-2024-25-359 | 19/09/2024 | VCH/000405/2024-2025 |
13 | Midnapore Division | BILL/00658/2024-2025 | 17/09/2024 | MR GOUTAM GHOSH, | ORD/000077/2023-2024 | 2424/MD | 13/07/2023 | Sinking of 2 (Two) nos. 250 X 200 mm dia. X 190 mtr. depth deep tube well by direct rotary method for Head work site & 2nd tube well site of Bandipur PWSS with in Chandrakona- II block under Midnapore Division, P.H.E Dte. [PART-D] | 9.36 | BP-2024-25-363 | 20/09/2024 | VCH/000555/2024-2025 |
14 | Midnapore Division | BILL/00789/2024-2025 | 01/10/2024 | R. CONSTRUCTION | ORD/000135/2023-2024 | 2594/MD | 21/07/2023 | Laying distribution system & Accommodate FHTC (500 Nos.) with allied work under JJM for Krishnapur PWSS in Chandrakona-II block including supply of all labour & materials within Ghatal Sub-Division under Midnapore Division, PHE Dte. [PART-C] | 49.16 | BP-2024-25-331 | 04/10/2024 | VCH/000545/2024-2025 |
15 | Midnapore Division | BILL/00796/2024-2025 | 01/10/2024 | SIX NOS OF NGO MANAGED LABORATORIES | null | 1062/PWS | 30/09/2024 | Remuneration of 6 nos NGO - Kangsabati, Keshpur, Belda, Sabang, Abash, Sarbik. | 0.95 | 221515 | 02/10/2024 | VCH/000527/2024-2025 |
16 | Midnapore Division | BILL/00797/2024-2025 | 01/10/2024 | UTSAV AGENCY | ORD/000818/2023-2024 | 654/MD | 07/03/2024 | Procurement of Chemicals & Consumables, Glassware, Plasticware etc. required for smooth running of the Laboratories for the year 2024 in the district of Paschim Medinipur under Midnapore Division, PHE Dte. (Total Nos. of Laboratories = 17 Nos. including 6 | 35.26 | BP-2024-25-331 | 04/10/2024 | VCH/000547/2024-2025 |
17 | Midnapore Division | BILL/00529/2024-2025 | 29/08/2024 | SUJATA CONSTRUCTION | ORD/000034/2023-2024 | 1142/MD | 25/04/2023 | Laying distribution pipe line, Pump House, Boundary wall, Soil investigation, 350 cum OHR (Intze type with pile foundation) & Accommodate FHTC under JJM with allied work for Dhanyagachhi PWSS in Chandrakona-II block including supply of all labour & materi | 28.42 | BP-2024-25-314 | 02/09/2024 | VCH/000305/2024-2025 |
18 | Midnapore Division | BILL/00530/2024-2025 | 29/08/2024 | M/S. D.K.H.CONSTRUCTION | ORD/000273/2023-2024 | 3260/MD | 12/09/2023 | Sinking of Tube Well, Laying distribution pipe line, Pump House, Boundary Wall, Soil investigation, 450 cum OHR (Intze type with pile foundation) & Accommodate FHTC (3,044 Nos.) under JJM including Two years O&M with allied work for Basanchhara PWSS i | 121.73 | BP-2024-25-316 | 02/09/2024 | VCH/000307/2024-2025 |
19 | Midnapore Division | BILL/00582/2024-2025 | 03/09/2024 | ANUSKA ENTERPRISE | ORD/000044/2023-2024 | 980/MD | 10/04/2023 | Construction and commissioning of RCC Over Head Reservoir (Intze type with solid raft) of capacity 250 cum and staging height 20 mtr as per approved drawing (No:- PC-I/OHR/10/2012) with allied works for Bajpara & its adjoining mouzas W/S Scheme within Mid | 19.43 | BP-2024-25-338 | 10/09/2024 | VCH/000536/2024-2025 |
20 | Midnapore Division | BILL/00592/2024-2025 | 05/09/2024 | ASHIM KUMAR DEY | ORD/000783/2023-2024 | 1176/AE/MSSD | 29/02/2024 | Hiring of 1 ( one) no Motor Cab ( standard ) Commercial with Catalytic Converter attachment with Bharat stage as per prevalent applicable standard compliant new / not old than 30 ( Thirty ) months from the date of 1st. registration on daily hire rate basi | 0.40 | BP-2024-25-330 | 10/09/2024 | VCH/000391/2024-2025 |
21 | Midnapore Division | BILL/00600/2024-2025 | 10/09/2024 | SAMIT PAL | ORD/000048/2023-2024 | 1431/MD | 04/05/2023 | Sinking of Tube well, Laying distribution pipe line, Rising main, Operation & maintenance of 2 years under JJM with allied work for Hemantapur PWSS in Ghatal Block including supply of all labour & materials within Ghatal Sub-Division under Midnapore Divis | 30.61 | BP-2024-25-343 | 12/09/2024 | VCH/000540/2024-2025 |
22 | Midnapore Division | BILL/00607/2024-2025 | 10/09/2024 | ASHIM KUMAR DEY | ORD/000637/2022-2023 | 555/MD | 22/02/2023 | Sinking of Tube well, Laying distribution pipe line, Pump House, Boundary wall, Soil investigation, 250 cum OHR (Intze type with pile foundation) & Accommodate FHTC (1,690 Nos.) under JJM with allied work for Gopmahal PWSS in Ghatal Block including | 49.41 | BP-2024-25-340 | 12/09/2024 | VCH/000537/2024-2025 |
23 | Midnapore Division | BILL/00537/2024-2025 | 30/08/2024 | NIMAI LAL GURIA | ORD/000843/2023-2024 | 745/MD | 13/03/2024 | Laying Distribution Pipeline & Accommodate FHTC (200 Nos.) under JJM with allied work for Rupnarayanpur & its adjoining mouzas W/S Scheme (Zone-I) in Kharagpur-I block including supply of all labour & materials within Kharagpur Sub-Division under Midnapor | 20.76 | BP-2024-25-318 | 02/09/2024 | VCH/000309/2024-2025 |
24 | Midnapore Division | BILL/00576/2024-2025 | 03/09/2024 | SUBHASIS ROY | ORD/000020/2023-2024 | 1135/W/MMD | 12/04/2023 | Providing and Installation of Submersible pumping machineries and other electromechanical equipments for Augmentation of Ground Water Based Piped Water Supply Scheme for Khairullachak to Accommodate FHTC, Block - Midnapore, District - Paschim Medinipur. u | 10.50 | 221515 | 06/09/2024 | VCH/000420/2024-2025 |
25 | Midnapore Division | BILL/00644/2024-2025 | 11/09/2024 | PALLIMANGAL GUCHHA SAMITY | null | 1017/RWS/MID | 09/09/2024 | Laboratory Maintenance bill from October 2022 to September 2023. | 0.75 | 221515 | 13/09/2024 | VCH/000413/2024-2025 |
26 | Midnapore Division | BILL/00645/2024-2025 | 11/09/2024 | SARBIK GRAM BIKASH KENDRA | null | 1017/RWS/MID | 09/09/2024 | Laboratory Maintenance bill from October 2022 to September 2023. | 0.75 | 221515 | 13/09/2024 | VCH/000414/2024-2025 |
27 | Midnapore Division | BILL/00647/2024-2025 | 12/09/2024 | S.N ENTERPRISE | ORD/000466/2022-2023 | 2186/MD | 01/11/2022 | Sinking of 200 mm x 100 mm dia. X 156 Mtr. Depth Rig bored Tube wells at 2nd Tube well site with Laying of uPVC (Class-III) & DI pipeline with FHTC works, Construction of 3.60 Mtr. X 3.00 Mtr. Switch Room & Boundary wall, Laying of Rising main at 2nd T/W | 8.05 | BP-2024-25-358 | 17/09/2024 | VCH/000551/2024-2025 |
28 | Midnapore Division | BILL/00775/2024-2025 | 28/09/2024 | AJITESH ACHARJEE | ORD/000049/2023-2024 | 1432/MD | 04/05/2023 | Laying distribution pipe line under JJM with allied work for Shrirampur PWSS in Ghatal Block including supply of all labour & materials within Ghatal Sub-Division under Midnapore Division, PHE Dte. [PART-B] | 8.90 | BP-2024-25-331 | 01/10/2024 | VCH/000546/2024-2025 |
29 | Midnapore Division | BILL/00531/2024-2025 | 29/08/2024 | SUJATA CONSTRUCTION | ORD/000640/2022-2023 | 577/MD | 23/02/2023 | Sinking of Tube Well, Laying distribution pipe line, Pump House, Boundary Wall, Soil investigation, 200 cum OHR (Intze type with pile foundation) & Accommodate FHTC (1396 Nos.) under JJM with allied work for Kuran PWSS in Ghatal Block including supp | 16.75 | BP-2024-25-315 | 02/09/2024 | VCH/000306/2024-2025 |
30 | Midnapore Division | BILL/00581/2024-2025 | 03/09/2024 | DIPAK KUMAR DOLAI | ORD/000697/2021-2022 | 293/MD | 15/02/2022 | Construction & Commissioning including FHTC (Civil Part) with 3 (three) months trial run for proposed Mini Pipe W/S Scheme under SAGY for Mouza- Dewanchak (Zone-I), Block-Ghatal, District - Paschim Medinipur under Midnapore Division, PHE Dte. | 19.66 | BP-2024-25-326 | 05/09/2024 | VCH/000530/2024-2025 |
31 | Midnapore Division | BILL/00594/2024-2025 | 05/09/2024 | ASHIM KUMAR DEY | ORD/000543/2022-2023 | 2674/MD | 30/12/2022 | Laying distribution pipe line, Construction of Pump House (3.6 mtr X 3.00 mtr.) & Boundary wall including Sinking of 250 X 200 mm dia. X 200 Mtr. depth deep Tube well under JJM with allied work for AMJOR and its adjoining mouzas W/S Scheme in Garhbeta - | 15.14 | BP-2024-25-331 | 10/09/2024 | VCH/000400/2024-2025 |
32 | Midnapore Division | BILL/00605/2024-2025 | 10/09/2024 | A.K. SIKDAR | ORD/000234/2023-2024 | 3004/MD | 21/08/2023 | Laying distribution of Pipe line, Construction of Pump House, Boundary wall and FHTC work (300 Nos.) for Proposed Sasha Bedia & its adjoining mouzas PWSS, Block-Garhbeta-II, Dist:- Paschim Medinipore under Midnapur Division, PHE Dte. [PART-VI] | 52.43 | BP-2024-25-342 | 12/09/2024 | VCH/000538/2024-2025 |
33 | Midnapore Division | BILL/00606/2024-2025 | 10/09/2024 | SAJAL JANA | ORD/000076/2023-2024 | 2423/MD | 13/07/2023 | Sinking of 2 (Two) Nos. 300 X 200 mm dia. X 190 mtr. depth deep tube well by direct rotary method for Head work site & 2nd tube well site of Krishnapur PWSS within Chandrakona-II block under Midnapore Division, P.H.E Dte. [PART-I] | 11.55 | BP-2024-25-341 | 12/09/2024 | VCH/000401/2024-2025 |
34 | Midnapore Division | BILL/00548/2024-2025 | 02/09/2024 | BIDYUT KUMAR SANTRA | ORD/000754/2023-2024 | 791/MD | 14/03/2024 | Laying Rising main pipeline, Construction of 3 Nos. Pump House, 2 Nos. Boundary wall (2*50 Mtr.) under JJM with allied works for Augmentation of Keshpur & its adjoining mouzas W/S Scheme in Keshpur block including supply of all labour & materials within M | 11.25 | BP-2024-25-333 | 10/09/2024 | VCH/000390/2024-2025 |
35 | Midnapore Division | BILL/00551/2024-2025 | 29/08/2024 | WBSEDCL | null | 2004695716/Quot/03 | 21/08/2024 | ELECTRIC QUOTATION BILL FOR TW NO-I OF AMDA PWSS. REF CONSUMER ID-204283798, APPLICATION NO-2004695716, APPLICATION TYPE-NEW CONNECTION, NAME OF CCC-KESHIARY CCC, NAME OF BLOCK-KESHIARY | 13.84 | BP-2024-25-338 | 10/09/2024 | VCH/000407/2024-2025 |
36 | Midnapore Division | BILL/00657/2024-2025 | 17/09/2024 | AJITESH ACHARJEE | ORD/000046/2023-2024 | 1429/MD | 04/05/2023 | Construction of Pump House & Accommodate FHTC (150 Nos.) under JJM with allied work for Benucha & its adjoining mouzas W/S Scheme in Salbani block including supply of all labour & materials within Midnapore Sadar Sub-Division under Midnapore Division, PH | 1.22 | BP-2024-25-362 | 20/09/2024 | VCH/000416/2024-2025 |
37 | Midnapore Division | BILL/00809/2024-2025 | 02/10/2024 | TANAY PATRA | null | PHE/2285/O-49/2021(Pt.-I) | 30/08/2024 | Remuneration of Sri Tanay Patra Contractual AE (C) under Mindapore Division PHE Dte. for the Month of September 2024. | 0.28 | 2215162 | 03/10/2024 | VCH/000544/2024-2025 |
38 | Midnapore Division | BILL/00601/2024-2025 | 10/09/2024 | JIT ENTERPRISE | ORD/000082/2023-2024 | 2429/MD | 13/07/2023 | Laying distribution pipe line & Pump House under JJM with allied work for Hemantapur PWSS in Ghatal Block including supply of all labour & materials within Ghatal Sub-Division under Midnapore Division, PHE Dte. [PART-B] | 24.95 | BP-2024-25-344 | 12/09/2024 | VCH/000539/2024-2025 |
39 | Midnapore Division | BILL/01998/2023-2024 | 28/03/2024 | K & KABERI ENTERPRISE (PROP. GOUTAM MAITY) | ORD/000943/2022-2023 | 729/A/AE/KSD | 10/11/2022 | Training Programme in connection with skilling of Man power to Generate Employment Oppurtunities and to support implimentation of Jal Jeevan Mission Programme at different Places within Midnapore Division P.H.E Dte. (Part-B) ( Kharagpur-I Block) | 0.51 | BP-2023-24-444 | 18/10/2024 | VCH/001855/2023-2024 |
40 | Midnapore Division | BILL/00650/2024-2025 | 12/09/2024 | M/S. A.R. ENTERPRISE. | ORD/000473/2021-2022 | 2167/MD | 17/12/2021 | Laying distribution pipe line, Soil test and Construction of R.C.C. Elevated Reservoir of capacity 400 Cum and staging height 20.00 mtr. with allied works including supply of all labour & materials of IRPALA & its adjoining mouzas Water Supply Scheme wit | 38.11 | BP-2024-25-357 | 17/09/2024 | VCH/000550/2024-2025 |
41 | Midnapore Division | BILL/00584/2024-2025 | 03/09/2024 | BANERJEE CONSTRUCTION | ORD/000253/2023-2024 | 3148/MD | 29/08/2023 | Sinking of Tube Well, Laying distribution pipe line, Pump House, Boundary Wall, Soil investigation, Construction of 350 cum OHR (Intze type with pile foundation) & Accommodate FHTC (1,958 nos.) under JJM with allied work for Khirishmul PWSS in Keshpur | 146.10 | BP-2024-25-329 | 05/09/2024 | VCH/000533/2024-2025 |
42 | Midnapore Division | BILL/00598/2024-2025 | 06/09/2024 | S.T. ENTERPRISE | ORD/000008/2023-2024 | 977/MD | 10/04/2023 | Laying distribution of Pipe line and accommodate FHTC work (320 Nos.) for Proposed Chhoto Nakdana & its adjoining mouzas PWSS, Block-Garhbeta-II Dist:- Paschim Medinipore under Midnapore Division PHE Dte. [PART-V] | 18.16 | BP-2024-25-334 | 10/09/2024 | VCH/000534/2024-2025 |
43 | Midnapore Division | BILL/00737/2024-2025 | 24/09/2024 | PULLOCK KUMAR GHOSH | ORD/000244/2023-2024 | 3099/MD | 25/08/2023 | Sinking of Tube well, Laying distribution pipe line, Rising Main, Pump House & Accommodate FHTC (304 Nos.) under JJM with allied work for Khangardihi & adjoining Mouza W/S Scheme in Midnapore Sadar Block including supply of all labour & materials within | 5.40 | 2215162 | 27/09/2024 | VCH/000418/2024-2025 |
44 | Midnapore Division | BILL/00550/2024-2025 | 02/09/2024 | KHAN ENTERPRISE | ORD/000678/2022-2023 | 816/MD | 21/03/2023 | Sinking of Tube Well, Laying distribution pipe line, Pump House, Boundary wall, Soil investigation, 350 cum OHR (Intze type with pile foundation) & Accommodate FHTC (1764 Nos.) under JJM with allied work for Hrisingpur PWSS in Chandrakona-II Block incl | 49.61 | BP-2024-25-322 | 03/09/2024 | VCH/000403/2024-2025 |
45 | Midnapore Division | BILL/00635/2024-2025 | 11/09/2024 | WATER LINK | ORD/000003/2023-2024 | 972/MD | 10/04/2023 | Laying distribution pipe line & Accommodate FHTC under JJM with allied work for Dhanyagachhi PWSS in Chandrakona-II block including supply of all labour & materials within Ghatal Sub-Division under Midnapore Division, PHE. Dte. [PART-C] | 16.40 | BP-2024-25-349 | 13/09/2024 | VCH/000548/2024-2025 |
46 | Midnapore Division | BILL/00641/2024-2025 | 11/09/2024 | KESHPUR SHAHID KSHUDIRAM SEVA SAMITY | null | 1017/RWS/MID | 09/09/2024 | Laboratory Maintenance bill from October 2022 to September 2023. | 0.75 | 221515 | 13/09/2024 | VCH/000410/2024-2025 |
47 | Midnapore Division | BILL/00649/2024-2025 | 12/09/2024 | CHANDAN ROY | ORD/000194/2023-2024 | 2808/MD | 07/08/2023 | Laying distribution of Pipe line, Rising main, Construction of Pump House, Boundary wall, FHTC work (360 Nos.) with 2 years operation & maintenance for Proposed Sasha Bedia & its adjoining mouzas PWSS, Block-Garhbeta-II, Dist:- Paschim Medinipore under M | 101.80 | BP-2024-25-360 | 19/09/2024 | VCH/000552/2024-2025 |
48 | Midnapore Division | BILL/00800/2024-2025 | 01/10/2024 | M/S. S.S. ENTERPRISE | ORD/000183/2023-2024 | 2735/MD | 01/08/2023 | Construction of Different Capacity R.C.C. Over Head Reservoir Over Pile / Raft Foundation including Sub-Soil investigation works for Construction of Over Head Reservoir with Laying distribution system, Sinking of Tube Well, Pump House, Boundary Wall & Pr | 172.23 | BP-2024-25-331 | 03/10/2024 | VCH/000543/2024-2025 |
49 | Midnapore Division | BILL/00738/2024-2025 | 24/09/2024 | M/S. INDRAJIT ROY | ORD/000019/2024-2025 | 2037/MD | 01/07/2024 | Construction of Pump House & Boundary wall under JJM with allied works for Bag Basa & its adjoining mouzas W/S Scheme in Salbani block including supply of all labour & materials within Midnapore Sadar Sub-Division under Midnapore Division, PHE Dte. [PART- | 4.11 | 2215162 | 27/09/2024 | VCH/000417/2024-2025 |
50 | Midnapore Division | BILL/00753/2024-2025 | 25/09/2024 | DIPAK KUMAR BAKLY | ORD/000631/2022-2023 | 456/MD | 13/02/2023 | Sinking of Tube Well, Laying distribution pipe line, Pump House, Boundary Wall, OHR (350 CUM) & allied work for Hatihalka & its adjoining mouzas W/S Scheme in Midnapore Sadar Block including supply of all labour & materials within Midnapore Sub-Division u | 75.44 | BP-2023-24-444 | 27/09/2024 | VCH/000419/2024-2025 |
51 | Midnapore Division | BILL/00761/2024-2025 | 26/09/2024 | M/S. D.K.H.CONSTRUCTION | ORD/000195/2023-2024 | 2809/MD | 07/08/2023 | Laying distribution pipe line, Rising main & Accommodate FHTC (500 Nos.) including 2 years operation & maintenance with allied work under JJM for Krishnapur PWSS in Chandrakona-II block including supply of all labour & materials within Ghatal Sub-Divisio | 77.32 | 84434 | 27/09/2024 | VCH/000408/2024-2025 |
52 | Midnapore Division | BILL/00549/2024-2025 | 02/09/2024 | SUJATA CONSTRUCTION | ORD/000127/2023-2024 | 2525/MD | 18/07/2023 | Sinking of Tube Well ,Laying distribution pipe line, Pump House , Boundary Wall, soil investigation , 200 Cum OHR (Intze type with Raft foundation) & Accommodate FHTC (1847 nos.) under JJM with allied work including 02(Two )Years Operation & Maintenan | 47.49 | BP-2024-25-323 | 04/09/2024 | VCH/000529/2024-2025 |
53 | Midnapore Division | BILL/00574/2024-2025 | 03/09/2024 | M/S. A.R. ENTERPRISE. | ORD/000281/2023-2024 | 3843/MD | 21/09/2023 | Sinking of Tube Well, Laying distribution pipe line, Pump House, Boundary Wall, Soil investigation, Construction of 350 cum OHR (Intze type with raft foundation) & Accommodate FHTC (2,353 nos.) under JJM with allied work for Amlabani PWSS in Keshpur | 478.13 | BP-2024-25-327 | 05/09/2024 | VCH/000531/2024-2025 |
54 | Midnapore Division | BILL/00575/2024-2025 | 03/09/2024 | MIDNAPUR PIPE CONCERN | ORD/000636/2023-2024 | 140/MD | 18/01/2024 | Sinking of Tube well, Laying distribution pipeline, Rising main, Pump House, Boundary Wall & Accommodate FHTC (546 Nos.) including 2 yrs. O & M under JJM with allied work for Shiromani & adjoining Mouza W/S Scheme in Midnapore Sadar Block including supply | 46.97 | 2215223 | 09/09/2024 | VCH/000392/2024-2025 |
55 | Midnapore Division | BILL/00579/2024-2025 | 03/09/2024 | DEBASISH DOGRA | ORD/000005/2024-2025 | 1838/MD | 12/06/2024 | Laying Distribution Pipeline & Accommodate FHTC (241 Nos.) under JJM with allied work for Rupnarayanpur & its adjoining mouzas W/S Scheme (Zone-II) in Kharagpur-I block including supply of all labour & materials within Kharagpur Sub-Division under Midnapo | 23.14 | BP-2023-24-335 | 10/09/2024 | VCH/000389/2024-2025 |
56 | Midnapore Division | BILL/00640/2024-2025 | 11/09/2024 | KANGSABATI GUCHHA SAMITY | null | 1017/RWS/MID | 09/09/2024 | Laboratory Maintenance bill from October 2022 to September 2023. | 0.75 | 221515 | 13/09/2024 | VCH/000409/2024-2025 |
57 | Midnapore Division | BILL/00767/2024-2025 | 27/09/2024 | RMN INFRASTRUCTURES LIMITED | ORD/000282/2023-2024 | 5091/MD | 30/10/2023 | Construction of Different Capacity R.C.C Over Head Reservoir Over Pile / Raft Foundation including Sub-Soil investigation works for Construction of Over Head Reservoir with laying distribution system, Sinking of Tube Well, Pump House, Boundary Wall & Pro | 2,136.71 | 2215162 | 30/09/2024 | VCH/000542/2024-2025 |
Total | 5,314.97 |