No. of unauthorized payments
Exception Report Showing the Status of Major Pending Works for the Divisions

Update Data
Rs. in Lakh
Sl. No. Division
Working Divisions
Bill Number Bill Date
Date of Issuance of the Work Order as per PHED-MIS
Vendor Name
Vendor Appointed Against this Work Order as per PHED-MIS
System Order Number
System generated Order No. for the Work Order as per PHED-MIS
Memo Number
Memo no. for Work Order Provided by the Divisions as per PHED-MIS
Order Date
Date of Issuance of the Work Order as per PHED-MIS
work_name
Name of the Work as per the Issued Work Order
Bill Gross Amount Voucher Number Voucher Date System Voucher Number
0 386.82  
1 Barasat Division BILL/03781/2023-2024 28/03/2024 M.R.CONSTRUCTION. ORD/001844/2023-2024 1119/1/BSD 09/02/2024 Installation of Har Ghar Jal (HGJ) Display Board at different village of verious PWSS of Deganga Block within Barasat Sub Division under Barasat Division, P.H.E. Dte. Part-D 0.88 BP-2024-25-2 05/04/2024 VCH/002772/2023-2024
2 Barasat Division BILL/03785/2023-2024 28/03/2024 M.R.CONSTRUCTION. ORD/001839/2023-2024 1116A/BSD 09/02/2024 Installation of Har Ghar Jal (HGJ) Display Board at different village of verious PWSS of Amdanga Block within Barasat Sub Division under Barasat Division, P.H.E. Dte. Part-C 0.88 BP-2024-25-2 05/04/2024 VCH/002773/2023-2024
3 Barasat Division BILL/00111/2024-2025 02/05/2024 IONET null GEMC-511687739097699 24/09/2023 Procurement of computers and peripherals for the office use in the Barasat Division and Sub-sequent sub division offices under Barasat Division P.H.E.Dte. 0.76 BP-2024-25-26 09/05/2024 VCH/000028/2024-2025
4 Barasat Division BILL/03778/2023-2024 28/03/2024 S.M.TRADERS. ORD/001847/2023-2024 1120/BSD 09/02/2024 Installation of Har Ghar Jal (HGJ) Display Board at different village of verious PWSS of Deganga Block within Barasat Sub Division under Barasat Division, P.H.E. Dte. Part-E 0.87 BP2024-25-3 05/04/2024 VCH/002774/2023-2024
5 Barasat Division BILL/00386/2024-2025 11/07/2024 KRISHNA SAHA. ORD/002257/2023-2024 845/BD 13/03/2024 Acceptance cum work order for Hiring diesel luxury car daily basis (From 01.06.2024 to 30.11.2024) for the Office uses of the Assistant Engineer (HQ) Barasat Division, P.H.Dte. 0.29 BP-2024-25-102 18/07/2024 VCH/000167/2024-2025
6 Barasat Division BILL/00441/2024-2025 31/07/2024 B.S.ENTERPRISE. (BASIRHAT) ORD/000010/2024-2025 1535/BD 07/06/2024 Acceptance cum work order for Repairing and renovation works of 200 cum. capacity 20mtr. Staging height R.C.C. Over Head water Reservoir for Augmentation of Matiagachha Water Supply Scheme, Habra-II Block within the jurisdiction of Bongaon Sub-Division un 13.11 BP-2024-25-137 02/08/2024 VCH/000288/2024-2025
7 Barasat Division BILL/00330/2024-2025 02/07/2024 M/S B.K.ENTERPRISE. ORD/000168/2023-2024 1793/BD 15/06/2023 Acceptance cum work order for Hiring Diesel Luxury Car on Daily basis ( from 16.06.2023 to 31.12.2023) for the office use of Deputy Superintending Engineer, Planning Circle-I, PHE Dte. 0.22 BP-2024-25-89 12/07/2024 VCH/000140/2024-2025
8 Barasat Division BILL/00400/2024-2025 15/07/2024 A.P POWER & CONCRETE ORD/001204/2023-2024 4018/BD 12/10/2023 Formal work order for Construction of 700 cum capacity 20mtr staging height RCC Over Head Reservoir and laying of Rising main & distribution pipe line by DI & UPVC and providing FHTC for Augmentation of Berachampa Zone-IV Water Supply scheme under Barasat 80.57 BP-2024-25-104 18/07/2024 VCH/000169/2024-2025
9 Barasat Division BILL/00053/2024-2025 16/04/2024 M/S NANDY ENTERPRISE ORD/000777/2022-2023 1243/BD. 26/04/2022 Formal work order for Providing Functional House Hold Tap Connection (FHTC) from existing and new proposed distribution system with in command area at Kurulia (Zone-I) Water Supply Scheme under Bongaon Sub-Division, PHE Dte.(Augmentation). 86.10 BP-2024-25-17 19/04/2024 VCH/000164/2024-2025
10 Barasat Division BILL/00331/2024-2025 02/07/2024 M/S B.K.ENTERPRISE. ORD/000168/2023-2024 1793/BD 15/06/2023 Acceptance cum work order for Hiring Diesel Luxury Car on Daily basis ( from 16.06.2023 to 31.12.2023) for the office use of Deputy Superintending Engineer, Planning Circle-I, PHE Dte. 0.21 BP-2024-25-89 12/07/2024 VCH/000139/2024-2025
11 Barasat Division BILL/00332/2024-2025 02/07/2024 M/S B.K.ENTERPRISE. ORD/000168/2023-2024 1793/BD 15/06/2023 Acceptance cum work order for Hiring Diesel Luxury Car on Daily basis ( from 16.06.2023 to 31.12.2023) for the office use of Deputy Superintending Engineer, Planning Circle-I, PHE Dte. 0.20 BP-2024-25-89 12/07/2024 VCH/000138/2024-2025
12 Barasat Division BILL/00385/2024-2025 11/07/2024 DIPANKAR NASKAR. ORD/001928/2023-2024 914/BD 15/03/2024 Acceptance cum work order for the work of Hiring Diesel Luxury Car on daily basis for the Office of the Dy. Superintending Engineer-I, Monitoring Cell, PHE Dte. (Period from 01-04-2024 to 30-09-2024). 0.33 BP-2024-25-101 18/07/2024 VCH/000166/2024-2025
13 Barasat Division BILL/00398/2024-2025 15/07/2024 MONDAL PRECISION PVT.LTD ORD/000724/2023-2024 2615/BD 29/08/2023 Formal work order for Construction of switch room cum chlorine room with sanitary & water supply arrangement i/c plinth protection at PH No.-1 (Size-5.40x3.60 mtr.) & PH No-2 & 3 (Size-3.60x3.00 mtr.), Laying of DI rising main and DI/UPVC distribution pi 75.88 BP-2024-25-103 18/07/2024 VCH/000168/2024-2025
14 Barasat Division BILL/00399/2024-2025 15/07/2024 AMAL DUTTA ROY ORD/001241/2023-2024 4172/BD 30/10/2023 Formal work order for Laying, fitting, fixing, jointing etc of Primary Rising main & Secondary Rising Main of Hasnabad Block under Surface Water Base Piped W/S Scheme for Hasnabad Block in the district of North 24 Parganas under Barasat Division, PHE D 99.68 BP-2024-25-100 18/07/2024 VCH/000165/2024-2025
15 Barasat Division BILL/00171/2024-2025 13/05/2024 SWAPAN BANDYOPADHYAY. null PHE/Estt/2133/2E-81/18 28/04/2022 Salary of Sri Swapan Kumar Bandopadhyay, Contactual Assistant Engineer, Barasat Division, PHE Dte. for the month of March & April'2024 for support Activity under JJM. 0.56 BP-2024-25-38 20/05/2024 VCH/000036/2024-2025
16 Barasat Division BILL/00381/2024-2025 10/07/2024 SUBHASH BOSE ORD/002233/2023-2024 794/HSD 13/07/2023 Acceptance cum work order for Emergent resting of newly laid UPVC distribution pipeline by bamboo pilling at N/H/O of Srimanta Halder of Halder para within Jeliakhali Purbakhanda w/s scheme, Sandeshkhali-II Block under Hasnabad Sub-Division, PHE Dte. 0.96 BP-2024-25-90 15/07/2024 VCH/000145/2024-2025
17 Barasat Division BILL/03779/2023-2024 28/03/2024 S.M.TRADERS. ORD/001849/2023-2024 1120./1/BSD 09/02/2024 Installation of Har Ghar Jal (HGJ) Display Board at different villages of verious PWSS of Deganga Block within Barasat Sub Division under Barasat Division, P.H.E. Dte. Part-F 0.87 BP-2024-25-3 05/04/2024 VCH/002776/2023-2024
18 Barasat Division BILL/03782/2023-2024 28/03/2024 S.M.TRADERS. ORD/001843/2023-2024 1119./BSD 09/02/2024 Installation of Har Ghar Jal (HGJ) Display Board at different village of verious PWSS of Deganga Block within Barasat Sub Division under Barasat Division, P.H.E. Dte. Part-C 0.88 BP-2024-25-3 05/04/2024 VCH/002775/2023-2024
19 Barasat Division BILL/03751/2023-2024 28/03/2024 ANKUSH CONSTRUCTION & CO. ORD/000888/2023-2024 1130/HSD 05/09/2023 Acceptance cum work order for Construction of approach road with cement concrete at PH No.-1 within Sultanpur w/s scheme, Minakhan block under Hasnabad Sub-Division P.H.E. Dte. 1.64 BP-2024-25-04 05/04/2024 VCH/002816/2023-2024
20 Barasat Division BILL/00435/2024-2025 29/07/2024 M/S SUKANTA ENTERPRISE. ORD/001795/2023-2024 211/HAB 28/02/2024 Continuation work order Hiring of 1 no. of Diesel Luxury Car (Euro - IV/VI) in good condition (traffic worthy) on daily basis for office use of the Assistant Engineer, For supervision of J.J.M. related work, executed within the entire Jurisdiction of Habr 0.32 BP-2024-25-133 01/08/2024 VCH/000280/2024-2025
21 Barasat Division BILL/00576/2024-2025 20/08/2024 MAHAVIR PUMPS MANUFACTURING PVT.LTD. ORD/000831/2022-2023 3629/BD 12/12/2022 Formal work order for Laying of DI/UPVC distribution pipe line and Providing Functional House Hold Tap Connection (FHTC) for Augmentation of Chandpara Water Supply Scheme under Bongaon Sub-Division, PHE Dte. 21.60 BP-2024-25-198 22/08/2024 VCH/000276/2024-2025
Total 386.82