1 |
12/03/2024 |
ISS/000001/2023-2024 |
3573ALD |
27/03/2023 |
Constructions of pump house & Tube well Boring by ODEX-165 Method of drilling at HW site & 2nd site , laying of distribution system with UPVC pipeline including rising main & delivery connection, Constructions of 250 Cum OHR as per Departmental Desig |
MADHAB SAHA |
PURBBA NARATHALI PIPED WATER SUPPLY SCHEME. ( SM/16537 ) |
0 |
2 |
12/03/2024 |
ISS/000002/2023-2024 |
3573ALD |
27/03/2023 |
Constructions of pump house & Tube well Boring by ODEX-165 Method of drilling at HW site & 2nd site , laying of distribution system with UPVC pipeline including rising main & delivery connection, Constructions of 250 Cum OHR as per Departmental Desig |
MADHAB SAHA |
PURBBA NARATHALI PIPED WATER SUPPLY SCHEME. ( SM/16537 ) |
500 |
3 |
15/03/2024 |
TRN/000001/2023-2024 |
|
|
|
|
Opening Stock ( SM/10027 ) |
1,807 |
4 |
20/03/2024 |
TRN/000003/2023-2024 |
|
|
|
|
Opening Stock ( SM/10027 ) |
200 |
5 |
20/03/2024 |
TRN/000001/2023-2024 |
|
|
|
|
MADHYA KHAIRBARI PIPED WATER SUPPLY SCHEME ( SM/13248 ) |
2,462 |
6 |
20/03/2024 |
TRN/000004/2023-2024 |
|
|
|
|
Opening Stock ( SM/10027 ) |
300 |
7 |
20/03/2024 |
ISS/000003/2023-2024 |
2713/ALD |
23/02/2022 |
Construction of Pump House, Boundary Wall, and Tube well Boring by ODEX-195 method of drilling including Rising main for HANTUPARA Piped Water Supply Scheme Under Alipurduar Division PHE DTE. |
SUBIR GHOSH |
REJUVENATION OF HANTUPARA TG WATER SUPPLY SCHEME' ( SM/09901 ) |
300 |
8 |
22/03/2024 |
TRN/000005/2023-2024 |
|
|
|
|
Opening Stock ( SM/10027 ) |
224 |
9 |
22/03/2024 |
ISS/000004/2023-2024 |
1884/ALD |
07/09/2023 |
Providing FHTC from existing distribution system as per specification for Rajabhat TG PWSS under Alipurduar Division, PHE Dte. |
PRITAM DAS |
RAJABHAT TEA GARDEN PIPED WATER SUPPLY SCHEME. ( SM/14093 ) |
224 |
10 |
22/03/2024 |
TRN/000002/2023-2024 |
|
|
|
|
DAKSHIN RANGALIBAZNA PIPED WATER SUPPLY SCHEME ( SM/14217 ) |
794 |
11 |
22/03/2024 |
TRN/000004/2023-2024 |
|
|
|
|
AUGMENTATION OF BIRPARA WATER SUPPLY SCHEME ( SM/14233 ) |
9,924 |
12 |
22/03/2024 |
TRN/000003/2023-2024 |
|
|
|
|
BHATPARA TEA GARDEN PIPED WATER SUPPLY SCHEME ( SM/14212 ) |
2,321 |
13 |
27/03/2024 |
TRN/000006/2023-2024 |
|
|
|
|
Opening Stock ( SM/10027 ) |
1,000 |
14 |
27/03/2024 |
ISS/000005/2023-2024 |
3155/ALD |
22/02/2023 |
Cons. of pump house and Sinking of 250 mm x 200 mm X 150 mtr. big dia. TW at HW site and 2nd site, LDS with UPVC pipeline, Cons. of 350 cum OHR as per Departmental Design & drawing , providing FHTC and others allied works for MADHYA KAMAKHYAGURI PWS |
GHOSH & SAHA CONSTRUCTION |
MADHYA KAMAKHYAGURI PIPED WATER SUPPLY SCHEME ( SM/15517 ) |
1,000 |
15 |
15/04/2024 |
TRN/000009/2024-2025 |
|
|
|
|
Opening Stock ( SM/10027 ) |
200 |
16 |
15/04/2024 |
ISS/000003/2024-2025 |
1875/ALD |
07/09/2023 |
Providing FHTC from existing distribution system as per specification for Gopalpur TG PWSS under Alipurduar Division, PHE Dte. |
NARENDRA BHADANI. |
GOPALPUR TEA GARDEN AREA PIPED WATER SUPPLY SCHEME ( SM/10178 ) |
200 |
17 |
24/04/2024 |
TRN/000011/2024-2025 |
|
|
|
|
Opening Stock ( SM/10027 ) |
100 |
18 |
24/04/2024 |
ISS/000005/2024-2025 |
3193/ALD |
27/02/2023 |
Tube well Boring by ODEX-165 Method of drilling at HW, FIRST TUBE WELL site including laying distribution system with new HDPE pipeline , Constructions of 150 Cum OHR as per Departmental Design & drawing , TWO nos pump house & boundary wall, providing FH |
S.G. CONSTRUCTION |
BHATKHAWA TEA GARDEN PIPED WATER SUPPLY SCHEME ( SM/14211 ) |
100 |
19 |
30/04/2024 |
ISS/000007/2024-2025 |
1113/ALD |
28/07/2023 |
Constructions of 250 Cum OHR as per Departmental Design & drawing including laying distribution system with new HDPE pipeline, RISING MAIN, Construction of 2(TWO) NOS of BOUNDARY WALL, 3(THREE) NOS ODEX-165 TUBE WELL, 3(THREE) NOS PUMP HOUSE, Soil Invest |
MAHENDRA CHHETRI |
UTTAR MANDABARI PIPED WATER SUPPLY SCHEME ( SM/16539 ) |
1,000 |
20 |
02/05/2024 |
TRN/000013/2024-2025 |
|
|
|
|
Opening Stock ( SM/10027 ) |
1,000 |
21 |
16/05/2024 |
TRN/000017/2024-2025 |
|
|
|
|
Opening Stock ( SM/10027 ) |
300 |
22 |
16/05/2024 |
ISS/000011/2024-2025 |
3394/ALD |
16/03/2023 |
Boring of Tube Well, Construction of Pump House, Boundary Wall, OHR, Laying Of Rising Main, Distribution System including soil test and providing FHTC for Prodhanpara PWSS Under Alipurduar Division, PHE Dte. (2nd call) |
MESSRS A.B.G CONSTRUCTION |
PRODHANPARA PIPED WATER SUPPLY SCHEME ( SM/13247 ) |
300 |
23 |
16/05/2024 |
TRN/000022/2024-2025 |
|
|
|
|
Opening Stock ( SM/10027 ) |
600 |
24 |
16/05/2024 |
ISS/000016/2024-2025 |
2981/ALD |
02/02/2023 |
Tube well Boring by ODEX-165 Method of drilling at HW, FIRST TUBE WELL site including laying distribution system with new UPVC pipeline , Constructions of 250 Cum OHR as per Departmental Design & drawing including soil investigation works , 2nos pump hou |
SOUVIK ROY PALADHI |
ATIABARI TEA GARDEN PIPED WATER SUPPLY SCHEME. ( SM/14092 ) |
600 |
25 |
17/05/2024 |
TRN/000023/2024-2025 |
|
|
|
|
Opening Stock ( SM/10027 ) |
600 |
26 |
17/05/2024 |
ISS/000017/2024-2025 |
14/ALD |
01/04/2022 |
Construction of Pump House, Boundary Wall, Tube well Boring by ODEX-165 Method of drilling including laying distribution system, Rising main and providing FHTC for MECHPARA TEA GARDEN AREA PWSS under Alipurduar Division PHE DTE |
SHREE RANISATI ENTERPRISE |
MECHPARA TEA GARDEN AREA PIPED WATER SUPPLY SCHEME ( SM/10176 ) |
600 |
27 |
27/05/2024 |
TRN/000028/2024-2025 |
|
|
|
|
Opening Stock ( SM/10027 ) |
204 |
28 |
27/05/2024 |
TRN/000027/2024-2025 |
|
|
|
|
Opening Stock ( SM/10027 ) |
300 |
29 |
27/05/2024 |
ISS/000021/2024-2025 |
1883/ALD |
07/09/2023 |
Providing FHTC from existing distribution system as per specification for Bhatkhawa TG PWSS under Alipurduar Division, PHE Dte. |
PRANAB GHOSH |
BHATKHAWA TEA GARDEN PIPED WATER SUPPLY SCHEME ( SM/14211 ) |
204 |
30 |
29/05/2024 |
TRN/000029/2024-2025 |
|
|
|
|
Opening Stock ( SM/10027 ) |
848 |
31 |
29/05/2024 |
TRN/000030/2024-2025 |
|
|
|
|
Opening Stock ( SM/10027 ) |
700 |
32 |
29/05/2024 |
ISS/000022/2024-2025 |
1995/ALD |
15/09/2023 |
Providing FHTC from existing distribution system as per specification for DALIMPUR PWSS under Alipurduar Division, PHE Dte. |
SREE MAA CONSTRUCTION |
AUGMENTATION OF DALIMPUR PWSS ( SM/18254 ) |
848 |
33 |
29/05/2024 |
ISS/000023/2024-2025 |
1492/ALD |
05/09/2022 |
Providing Functional Tap Connection (FHTC) in connection with Jaldhara/JalSwapna (Schools, AWC and others) for Uttar Sishubari PWSS under Alipurduar Division, PHE Dte. Part-4 |
MITHUN DAS |
AUGMENTATION OF UTTAR SISUBARI WATER SUPPLY SCHEME ( SM/11959 ) |
700 |
34 |
13/06/2024 |
TRN/000035/2024-2025 |
|
|
|
|
Opening Stock ( SM/10027 ) |
500 |
35 |
13/06/2024 |
ISS/000028/2024-2025 |
3193/ALD |
27/02/2023 |
Tube well Boring by ODEX-165 Method of drilling at HW, FIRST TUBE WELL site including laying distribution system with new HDPE pipeline , Constructions of 150 Cum OHR as per Departmental Design & drawing , TWO nos pump house & boundary wall, providing FH |
S.G. CONSTRUCTION |
BHATKHAWA TEA GARDEN PIPED WATER SUPPLY SCHEME ( SM/14211 ) |
500 |
36 |
26/06/2024 |
TRN/000037/2024-2025 |
|
|
|
|
Opening Stock ( SM/10027 ) |
200 |
37 |
26/06/2024 |
ISS/000030/2024-2025 |
3634/ALD |
31/03/2023 |
Construction of tube wells (2 nos.) by Reverse rotary method of drilling at HW site and 2nd TW site , constructions of 200 Cum OHR at HW including soil investigation , construction of pump house and boundary wall at H/W and 2nd site, laying of rising mai |
M/S MRITYUNJAY PAUL AND SONS |
DALGAON TEA GARDEN PIPED WATER SUPPLY SCHEME. ( SM/16823 ) |
200 |
38 |
26/06/2024 |
TRN/000038/2024-2025 |
|
|
|
|
Opening Stock ( SM/10027 ) |
500 |
39 |
26/06/2024 |
ISS/000031/2024-2025 |
966/ALD |
12/07/2023 |
Providing Functional Tap Connection (FHTC) in connection with Jaldhara/JalSwapna (Schools, AWC and others) for Dalimpur PWSS under Alipurduar Division, PHE Dte. Part-3 |
TAPASH DAS |
AUGMENTATION OF DALIMPUR PWSS ( SM/18254 ) |
500 |
40 |
26/06/2024 |
TRN/000039/2024-2025 |
|
|
|
|
Opening Stock ( SM/10027 ) |
100 |
41 |
26/06/2024 |
ISS/000032/2024-2025 |
1582/ALD |
24/08/2023 |
Cons. Of Rising line, pathway, surface drain, laying of DI and UPVC pipeline and restoration of FHTC at Salkumarhat PWSS under Alipurduar Division, PHE Dte. |
TAPASH DAS |
AUGMENTATION OF SALKUMARHAT PIPED WATER SUPPLY SCHEME ( SM/10316 ) |
100 |
42 |
26/06/2024 |
TRN/000040/2024-2025 |
|
|
|
|
Opening Stock ( SM/10027 ) |
283 |
43 |
16/07/2024 |
TRN/000048/2024-2025 |
|
|
|
|
Opening Stock ( SM/10027 ) |
300 |
44 |
16/07/2024 |
TRN/000049/2024-2025 |
|
|
|
|
Opening Stock ( SM/10027 ) |
284 |
45 |
16/07/2024 |
TRN/000050/2024-2025 |
|
|
|
|
Opening Stock ( SM/10027 ) |
1,690 |
46 |
16/07/2024 |
ISS/000039/2024-2025 |
2858/ALD |
17/01/2023 |
Constructions of pump house & Sinking of 250 mm x 200 mm X 150 mtr Big dia Tubewel at HW site & 2nd site , laying of distribution system with UPVC pipeline , Constructions of 200 Cum OHR as per Departmental Design & drawing including soil test, pr |
SOUVIK ROY PALADHI |
PURBA CHIKLIGURI PIPED WATER SUPPLY SCHEME ( SM/13301 ) |
1,690 |
47 |
16/07/2024 |
TRN/000051/2024-2025 |
|
|
|
|
Opening Stock ( SM/10027 ) |
284 |
48 |
16/07/2024 |
ISS/000040/2024-2025 |
1881/ALD |
07/09/2023 |
Providing FHTC from existing distribution system as per specification for Atiabari TG PWSS under Alipurduar Division, PHE Dte. |
SOUVIK ROY PALADHI |
ATIABARI TEA GARDEN PIPED WATER SUPPLY SCHEME. ( SM/14092 ) |
284 |
49 |
16/07/2024 |
TRN/000052/2024-2025 |
|
|
|
|
ATIABARI TEA GARDEN PIPED WATER SUPPLY SCHEME. ( SM/14092 ) |
284 |
50 |
16/07/2024 |
TRN/000006/2024-2025 |
|
|
|
|
KAYAKHATA PIPED WATER SUPPLY SCHEME ( SM/13299 ) |
1,585 |
51 |
23/07/2024 |
TRN/000053/2024-2025 |
|
|
|
|
Opening Stock ( SM/10027 ) |
1,000 |
52 |
23/07/2024 |
ISS/000041/2024-2025 |
3000/ALD |
06/02/2023 |
Tube well boring by ODEX-165, Construction of pump house and boundary wall including laying distribution system with new UPVC pipeline with rising and delivery line connection, Providing FHTC and other allied works for KUMARGRAM PWSS under Alipurduar Divi |
ANUGRAH CONSTRUCTION PRIVATE LIMITED |
AUGMENTATION OF KUMARGRAM PIPED WATER SUPPLY SCHEME ( SM/11985 ) |
1,000 |
53 |
29/08/2024 |
TRN/000066/2024-2025 |
|
|
|
|
Opening Stock ( SM/10027 ) |
283 |
54 |
29/08/2024 |
TRN/000060/2024-2025 |
|
|
|
|
Opening Stock ( SM/10027 ) |
500 |
55 |
29/08/2024 |
TRN/000061/2024-2025 |
|
|
|
|
Opening Stock ( SM/10027 ) |
2,000 |
56 |
29/08/2024 |
TRN/000062/2024-2025 |
|
|
|
|
Opening Stock ( SM/10027 ) |
500 |
57 |
29/08/2024 |
TRN/000063/2024-2025 |
|
|
|
|
Opening Stock ( SM/10027 ) |
15 |
58 |
29/08/2024 |
TRN/000064/2024-2025 |
|
|
|
|
Opening Stock ( SM/10027 ) |
492 |
59 |
29/08/2024 |
TRN/000065/2024-2025 |
|
|
|
|
Opening Stock ( SM/10027 ) |
150 |
60 |
29/08/2024 |
TRN/000070/2024-2025 |
|
|
|
|
Opening Stock ( SM/10027 ) |
150 |
61 |
29/08/2024 |
TRN/000056/2024-2025 |
|
|
|
|
Opening Stock ( SM/10027 ) |
300 |
62 |
29/08/2024 |
TRN/000057/2024-2025 |
|
|
|
|
Opening Stock ( SM/10027 ) |
521 |
63 |
29/08/2024 |
TRN/000058/2024-2025 |
|
|
|
|
Opening Stock ( SM/10027 ) |
470 |
64 |
29/08/2024 |
TRN/000059/2024-2025 |
|
|
|
|
Opening Stock ( SM/10027 ) |
410 |
65 |
29/08/2024 |
TRN/000067/2024-2025 |
|
|
|
|
Opening Stock ( SM/10027 ) |
200 |
66 |
29/08/2024 |
TRN/000068/2024-2025 |
|
|
|
|
Opening Stock ( SM/10027 ) |
74 |
67 |
29/08/2024 |
TRN/000069/2024-2025 |
|
|
|
|
Opening Stock ( SM/10027 ) |
157 |
68 |
29/08/2024 |
ISS/000044/2024-2025 |
1639/ALD |
19/09/2022 |
Tube well Boring by ODEX-165 method of drilling at Head work site, Construction of 1 no. Pump house and Boundary wall at headwork site, Rising Main and Distribution line with FHTC (Part-1) for BANDAPANI TG AREA PWSS (ZONE-I) under Birpara Sub-Division, Al |
PRAMESH LAMA |
Bandpani Tea Garden Areas Piped Water Supply Scheme. ( SM/11483 ) |
150 |
69 |
29/08/2024 |
ISS/000046/2024-2025 |
1171/ALD |
03/08/2023 |
Constructions of 2(TWO) NOS 150 Cum OHR as per Departmental Design & drawing including laying distribution system with new HDPE pipeline, RISING MAIN, Construction of BOUNDARY WALL, 4(FOUR) NOS ODEX-165 TUBE WELL, 4(FOUR) NOS PUMP HOUSE, Soil Investigati |
M/S RADHASWAMI ENTERPRISE |
RANGAMATI TEA GARDEN PIPED WATER SUPPLY SCHEME ( SM/14213 ) |
300 |
70 |
29/08/2024 |
TRN/000072/2024-2025 |
|
|
|
|
Opening Stock ( SM/10027 ) |
150 |
71 |
29/08/2024 |
TRN/000071/2024-2025 |
|
|
|
|
Piped Water Supply Scheme for Jaigaon Development Area (JDA) Based on Sub-Surface Water Source of River Torsa ( SM/05647 ) |
500 |
72 |
29/08/2024 |
ISS/000057/2024-2025 |
3623/ALD |
30/03/2023 |
Remaining portion of pipeline of JDA Zone-I & Zone-II and special Road repairing of Zone-I and II and Zone-4B, providing pipeline and FHTC of Ramgaon. |
D. K. & SONS |
FHTC under Jaldhara/Jal Sapna including retrofitting of existing distribution system under the command area of Jaigaon & Falakata water supply scheme. ( SM/08080 ) |
500 |
73 |
04/09/2024 |
ISS/000060/2024-2025 |
1954/ALD |
02/07/2024 |
Laying of rising main line with HDPE PN10, horizontal boring by HDD method , bridge and culvert crossing, left out portion of household connection with HDPE pipe, providing balance FHTC, construction of pathway, surface drain and chatal, installation of p |
CHANDAN KIRTONIA |
F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Dhaolajhora T.G Piped Water Supply Scheme ( SM/07191 ) |
300 |
74 |
05/09/2024 |
TRN/000075/2024-2025 |
|
|
|
|
Opening Stock ( SM/10027 ) |
300 |
75 |
27/09/2024 |
TRN/000076/2024-2025 |
|
|
|
|
Opening Stock ( SM/10027 ) |
300 |