1 |
22/04/2024 |
TRN/000010/2024-2025 |
|
|
|
|
Opening Stock ( SM/10027 ) |
198 |
2 |
22/04/2024 |
ISS/000004/2024-2025 |
2861/ALD |
17/01/2023 |
Cons. of Rig bored TW(2nos) by Reverse Rotary method of drilling at HW and 2nd site, cons of 200 cum OHR at HW including soil testing, cons. of P/H and B/W at HW,2nd site, Laying of rising main, distribution line and providing FHTC as per Departmental D |
DILIP MAHATO |
ETHELBARI TEA GARDEN AREA PIPED WATER SUPPLY SCHEME ( SM/13449 ) |
198 |
3 |
02/05/2024 |
TRN/000012/2024-2025 |
|
|
|
|
Opening Stock ( SM/10027 ) |
990 |
4 |
02/05/2024 |
ISS/000006/2024-2025 |
1114/ALD |
28/07/2023 |
Construction of tube wells (2 nos.) by Reverse rotary method of drilling at HW site and 2nd TW site , soil investigation at OHR site, constructions of 400 Cum OHR at HW , construction of pump house and boundary wall at H/W and 2nd site, laying of rising |
M/S ELITE CONSTRUCTION |
BENGKANDI PIPED WATER SUPPLY SCHEME ( SM/16820 ) |
990 |
5 |
10/05/2024 |
TRN/000016/2024-2025 |
|
|
|
|
Opening Stock ( SM/10027 ) |
150 |
6 |
10/05/2024 |
ISS/000010/2024-2025 |
2636/ALD |
21/12/2022 |
Construction of Pump House, Boundary Wall, Tube well Boring by Reverse Rotary Method of drilling including Rising Main at H/W site and 2nd site along with repairing of office godown for Bhatibari Zone-I PWSS Under Alipurduar Division PHE DTE |
DULAL DAS |
AUGMENTATION OF BHATIBARI PIPED WATER SUPPLY SCHEME ( SM/14096 ) |
150 |
7 |
13/05/2024 |
ISS/000012/2024-2025 |
2863/ALD |
17/01/2023 |
Constructions of P/H and T/W Boring by ODEX-165 Method of drilling at HW and 2nd site , LDS with UPVC P/L inclu. rising main and delivery connection, Cons. of 200 Cum OHR as per Departmental Design & drawing alongwith soil investigation, providing FHTC a |
HARIDAS GHOSH |
MARAKHATA PIPED WATER SUPPLY SCHEME. ( SM/13304 ) |
550 |
8 |
13/05/2024 |
ISS/000014/2024-2025 |
3574/ALD |
27/03/2023 |
Cons. of Pump House & Tube well Boring by ODEX-165 Method drilling at HW Site & 2nd Site, laying distribution system with UPVC pipeline including rising main & delivery connection, Cons. of 150cum OHR as per departmental Design & drawing along with soil |
TAPASH KUMAR BHOWMICK |
TURTURI PIPED WATER SUPPLY SCHEME. ( SM/14219 ) |
80 |
9 |
16/05/2024 |
TRN/000018/2024-2025 |
|
|
|
|
Opening Stock ( SM/10027 ) |
550 |
10 |
16/05/2024 |
TRN/000019/2024-2025 |
|
|
|
|
Opening Stock ( SM/10027 ) |
20 |
11 |
16/05/2024 |
TRN/000020/2024-2025 |
|
|
|
|
Opening Stock ( SM/10027 ) |
80 |
12 |
16/05/2024 |
ISS/000013/2024-2025 |
2855/ALD |
17/01/2023 |
Cons. of pump house and Sinking of 250 mm x 200 mm X 150 mtr. Big dia. TW at HW site and 2nd site, LDS with UPVC pipeline, Cons. of 200 Cum OHR as per Departmental Design and drawing inclu. Soil testing, providing FHTC and others allied works for Brajerku |
TAPASH KUMAR BHOWMICK |
BRAJERKUTHI PIPED WATER SUPPLY SCHEME ( SM/13300 ) |
20 |
13 |
16/05/2024 |
TRN/000021/2024-2025 |
|
|
|
|
Opening Stock ( SM/10027 ) |
66 |
14 |
16/05/2024 |
ISS/000015/2024-2025 |
209/ALD |
16/01/2024 |
Laying of HDPE/DI Pipeline for filling up the gap & bridge / culvert crossing, specials repair with trial run of pipeline and allied works at Sankosh TG PWSS under Alipurduar Division, PHE Dte. |
SOUVIK ROY PALADHI |
SANKOSH TG AREA PIPED WATER SUPPLY SCHEME ( SM/11485 ) |
66 |
15 |
17/05/2024 |
TRN/000024/2024-2025 |
|
|
|
|
Opening Stock ( SM/10027 ) |
286 |
16 |
22/05/2024 |
TRN/000025/2024-2025 |
|
|
|
|
Opening Stock ( SM/10027 ) |
99 |
17 |
27/05/2024 |
TRN/000026/2024-2025 |
|
|
|
|
Opening Stock ( SM/10027 ) |
27.5 |