G6- Division wise Store Data (Issue)

Clear
Alipurduar Division
Item :D.I. Pipe (MI/01854) , Dia(mm):200, Class :K7
Sl. No. Transaction Date HR Number Wo Number WO Date Work Name Agency Scheme Issue
1 22/04/2024 TRN/000010/2024-2025 Opening Stock ( SM/10027 ) 198
2 22/04/2024 ISS/000004/2024-2025 2861/ALD 17/01/2023 Cons. of Rig bored TW(2nos) by Reverse Rotary method of drilling at HW and 2nd site, cons of 200 cum OHR at HW including soil testing, cons. of P/H and B/W at HW,2nd site, Laying of rising main, distribution line and providing FHTC as per Departmental D DILIP MAHATO ETHELBARI TEA GARDEN AREA PIPED WATER SUPPLY SCHEME ( SM/13449 ) 198
3 02/05/2024 TRN/000012/2024-2025 Opening Stock ( SM/10027 ) 990
4 02/05/2024 ISS/000006/2024-2025 1114/ALD 28/07/2023 Construction of tube wells (2 nos.) by Reverse rotary method of drilling at HW site and 2nd TW site , soil investigation at OHR site, constructions of 400 Cum OHR at HW , construction of pump house and boundary wall at H/W and 2nd site, laying of rising M/S ELITE CONSTRUCTION BENGKANDI PIPED WATER SUPPLY SCHEME ( SM/16820 ) 990
5 10/05/2024 TRN/000016/2024-2025 Opening Stock ( SM/10027 ) 150
6 10/05/2024 ISS/000010/2024-2025 2636/ALD 21/12/2022 Construction of Pump House, Boundary Wall, Tube well Boring by Reverse Rotary Method of drilling including Rising Main at H/W site and 2nd site along with repairing of office godown for Bhatibari Zone-I PWSS Under Alipurduar Division PHE DTE DULAL DAS AUGMENTATION OF BHATIBARI PIPED WATER SUPPLY SCHEME ( SM/14096 ) 150
7 13/05/2024 ISS/000012/2024-2025 2863/ALD 17/01/2023 Constructions of P/H and T/W Boring by ODEX-165 Method of drilling at HW and 2nd site , LDS with UPVC P/L inclu. rising main and delivery connection, Cons. of 200 Cum OHR as per Departmental Design & drawing alongwith soil investigation, providing FHTC a HARIDAS GHOSH MARAKHATA PIPED WATER SUPPLY SCHEME. ( SM/13304 ) 550
8 13/05/2024 ISS/000014/2024-2025 3574/ALD 27/03/2023 Cons. of Pump House & Tube well Boring by ODEX-165 Method drilling at HW Site & 2nd Site, laying distribution system with UPVC pipeline including rising main & delivery connection, Cons. of 150cum OHR as per departmental Design & drawing along with soil TAPASH KUMAR BHOWMICK TURTURI PIPED WATER SUPPLY SCHEME. ( SM/14219 ) 80
9 16/05/2024 TRN/000018/2024-2025 Opening Stock ( SM/10027 ) 550
10 16/05/2024 TRN/000019/2024-2025 Opening Stock ( SM/10027 ) 20
11 16/05/2024 TRN/000020/2024-2025 Opening Stock ( SM/10027 ) 80
12 16/05/2024 ISS/000013/2024-2025 2855/ALD 17/01/2023 Cons. of pump house and Sinking of 250 mm x 200 mm X 150 mtr. Big dia. TW at HW site and 2nd site, LDS with UPVC pipeline, Cons. of 200 Cum OHR as per Departmental Design and drawing inclu. Soil testing, providing FHTC and others allied works for Brajerku TAPASH KUMAR BHOWMICK BRAJERKUTHI PIPED WATER SUPPLY SCHEME ( SM/13300 ) 20
13 16/05/2024 TRN/000021/2024-2025 Opening Stock ( SM/10027 ) 66
14 16/05/2024 ISS/000015/2024-2025 209/ALD 16/01/2024 Laying of HDPE/DI Pipeline for filling up the gap & bridge / culvert crossing, specials repair with trial run of pipeline and allied works at Sankosh TG PWSS under Alipurduar Division, PHE Dte. SOUVIK ROY PALADHI SANKOSH TG AREA PIPED WATER SUPPLY SCHEME ( SM/11485 ) 66
15 17/05/2024 TRN/000024/2024-2025 Opening Stock ( SM/10027 ) 286
16 22/05/2024 TRN/000025/2024-2025 Opening Stock ( SM/10027 ) 99
17 27/05/2024 TRN/000026/2024-2025 Opening Stock ( SM/10027 ) 27.5