| 1 |
01/09/2025 |
ISS/000057/2025-2026 |
Gun Metal Ferrule ,10 MM -In Each |
1249/BWD |
23/04/2025 |
Providing of balance FHTC and other allied works at Rautgram Mouza under the command area of Kaigram Piped Water Supply Scheme (SM/09717) in order to declare Sajalgram under Mamudpur GP-II under Manteshwar Block under Kalna Sub-Division under Burdwan Di |
MONDAL & CO. |
Augmentation of Kaigram PWSS for providing Functional House Hold Tap Connection (FHTC) ( SM/09717 ) |
270 |
| 2 |
04/09/2025 |
ISS/000058/2025-2026 |
Gun Metal Ferrule ,10 MM -In Each |
1245/BWD |
23/04/2025 |
Arrangement of drinking water supply by installation of solar submersible pump including sinking of 200 mm. dia. Tube well 150 Mtr. Deep by direct rotary rig method, Laying dist. System, FHTC and 2 Nos. 5000 Ltr. PVC tank installation with construction of |
A.R. TRADERS |
RETROFITTING OF MANIKHAR PIPED WATER SUPPLY SCHEME PART-C ( SM/16289 ) |
150 |
| 3 |
04/09/2025 |
ISS/000059/2025-2026 |
D.I. Pipe ,K9 ,150 MM -In metre |
4122/BWD |
14/09/2023 |
Augmentation of SUDPUR Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 450 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls w |
INDIAN ENGINEERS CO.-OPERATIVE SOCIETY LTD. |
AUGMENTATION OF SUDPUR PIPED WATER SUPPLY SCHEME ( SM/15573 ) |
66 |
| 4 |
10/09/2025 |
ISS/000060/2025-2026 |
D.I. Pipe ,K9 ,150 MM -In metre |
2233/BWD |
01/08/2025 |
Operation & Maintenance of Distribution System, Rising main, Sluice Valves, including operation of sluice valves of Raipur PWSS of Burdwan-II within Burdwan Sub-Division underBurdwan Division, PHE Dte Period for 1(one)year i.e. 01.08.2025 to 31.07.2026 |
ASHOK KUMAR GHOSH |
Raipur Piped Water Supply Scheme ( SM/05322 ) |
11 |
| 5 |
10/09/2025 |
ISS/000061/2025-2026 |
D.I. Pipe ,K7 ,150 MM -In metre |
3137/BWD |
20/07/2023 |
Augmentation of PURBASTHALI Surface Water Supply Scheme (ZONE-4A) with LDS, Rising Main, FHTC, Construction of 250 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with |
SAKTI ENTERPRISE |
AUGMENTATION OF PURBASTHALI SURFACE WATER BASED PWSS ZONE IV ( SM/16307 ) |
330 |
| 6 |
18/09/2025 |
ISS/000063/2025-2026 |
Gun Metal Ferrule ,10 MM -In Each |
430/BWD |
20/01/2025 |
Restoration of concrete road by Cement concrete (mix 1:1.5:3), Providing balance FHTC, parallel pipeline, drainage system, boundary wall, Bridge, land development, Sluice valve chamber for smooth water supply of FHTC work for ALIPUR PWSS and its adjoining |
DULAL MAJUMDER |
Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Alipur Piped Water Supply Scheme ( SM/07819 ) |
30 |
| 7 |
24/09/2025 |
ISS/000064/2025-2026 |
D.I. Pipe ,K7 ,150 MM -In metre |
3137/BWD |
20/07/2023 |
Augmentation of PURBASTHALI Surface Water Supply Scheme (ZONE-4A) with LDS, Rising Main, FHTC, Construction of 250 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with |
SAKTI ENTERPRISE |
AUGMENTATION OF PURBASTHALI SURFACE WATER BASED PWSS ZONE IV ( SM/16307 ) |
66 |
| 8 |
24/09/2025 |
ISS/000064/2025-2026 |
D.I. Pipe ,K7 ,250 MM -In metre |
3137/BWD |
20/07/2023 |
Augmentation of PURBASTHALI Surface Water Supply Scheme (ZONE-4A) with LDS, Rising Main, FHTC, Construction of 250 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with |
SAKTI ENTERPRISE |
AUGMENTATION OF PURBASTHALI SURFACE WATER BASED PWSS ZONE IV ( SM/16307 ) |
143 |
| 9 |
10/10/2025 |
ISS/000065/2025-2026 |
D.I. Pipe ,K9 ,150 MM -In metre |
4122/BWD |
14/09/2023 |
Augmentation of SUDPUR Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 450 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls w |
INDIAN ENGINEERS CO.-OPERATIVE SOCIETY LTD. |
AUGMENTATION OF SUDPUR PIPED WATER SUPPLY SCHEME ( SM/15573 ) |
27.5 |
| 10 |
15/10/2025 |
ISS/000067/2025-2026 |
D.I. Pipe ,K7 ,200 MM -In metre |
1939/BWD |
11/04/2022 |
Augmentation of MAJHIGRAM SINGOT Piped Water Supply Scheme with LDS, FHTC, Rising Main, Construction of 400 Cum capacity OHR with 20.0 Mtr. Staging height inclusive of soil investigation including repair of pump house at head works & 2ND TW site under Man |
INDIAN ENGINEERS CO.-OPERATIVE SOCIETY LTD. |
Augmentation of ground water based MAJHIGRAM SINGOT PWSS to accommodate FHTC in Mangolkote block under Katwa Sub Division of Burdwan Division in Purba Bardhaman District ( SM/09569 ) |
99 |
| 11 |
15/10/2025 |
ISS/000068/2025-2026 |
Gun Metal Ferrule ,10 MM -In Each |
1939/BWD |
11/04/2022 |
Augmentation of MAJHIGRAM SINGOT Piped Water Supply Scheme with LDS, FHTC, Rising Main, Construction of 400 Cum capacity OHR with 20.0 Mtr. Staging height inclusive of soil investigation including repair of pump house at head works & 2ND TW site under Man |
INDIAN ENGINEERS CO.-OPERATIVE SOCIETY LTD. |
Augmentation of ground water based MAJHIGRAM SINGOT PWSS to accommodate FHTC in Mangolkote block under Katwa Sub Division of Burdwan Division in Purba Bardhaman District ( SM/09569 ) |
14 |
| 12 |
10/11/2025 |
ISS/000070/2025-2026 |
Gun Metal Ferrule ,10 MM -In Each |
1064/DSD |
24/07/2025 |
Land Development work , Remaining FHTC at Balsidanga Piped Water Supply Scheme , P.H.E Dte. Block:-Bhatar Dist: Purba Bardhaman. |
KALYAN CHOWDHURY |
BALSIDANGA PIPED WATER SUPPLY SCHEME ( SM/13904 ) |
15 |
| 13 |
12/11/2025 |
ISS/000071/2025-2026 |
D.I. Pipe ,K9 ,150 MM -In metre |
4388/BWD |
05/10/2023 |
Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and lan |
AKASH CONSTRUCTION |
GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR PIPLON PWSS IN MANTESHWAR BLOCK OF PURBA BURDWAN DISTRICT UNDER BURDWAN DIVISION, P.H.E. DTE. ( SM/13283 ) |
330 |
| 14 |
12/11/2025 |
ISS/000072/2025-2026 |
Gun Metal Ferrule ,10 MM -In Each |
496/BWD |
28/01/2025 |
Constn. of pump house, Plinth Protection for Pump House & OHR, extension of pipeline for providing FHTC at MURULIA village, Adivasi para, approach road for 2nd Pump house of PURBA GOPALPUR PWSS Under Katwa Sub Division, Block- Mongolkote, Burdwan Divisio |
MONDAL ENTERPRISE |
PURBA GOPALPUR PIPED WATER SUPPLY SCHEME ( SM/14448 ) |
25 |
| 15 |
19/11/2025 |
ISS/000074/2025-2026 |
D.I. Pipe ,K7 ,150 MM -In metre |
105/BSD |
16/01/2025 |
Laying of 150mm DI pipeline for interconnection of 4no tw to distribution line & Kalsi mouza 3rd tw to distribution line for Bagila Piped Water Supply Scheme under memari-I Block, District:- Purba-Bardhaman. |
A.R. TRADERS |
Providing Functional House hold Tap Connection (FHTC) by retrofitting within the command area of Bagila piped Water Supply Scheme at Memari-I Block under Burdwan Division, P.H.E. DTE. ( SM/08704 ) |
38.5 |
| 16 |
19/11/2025 |
ISS/000074/2025-2026 |
D.I. Pipe ,K9 ,150 MM -In metre |
105/BSD |
16/01/2025 |
Laying of 150mm DI pipeline for interconnection of 4no tw to distribution line & Kalsi mouza 3rd tw to distribution line for Bagila Piped Water Supply Scheme under memari-I Block, District:- Purba-Bardhaman. |
A.R. TRADERS |
Providing Functional House hold Tap Connection (FHTC) by retrofitting within the command area of Bagila piped Water Supply Scheme at Memari-I Block under Burdwan Division, P.H.E. DTE. ( SM/08704 ) |
33 |
| 17 |
21/11/2025 |
ISS/000076/2025-2026 |
D.I. Pipe ,K7 ,200 MM -In metre |
5205/BWD |
29/11/2023 |
Sinking of Tube Well and laying of rising main and additional work of KUSUMGRAM Piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. (P.P. Site- Kulut for for Safarda, Akbarnagar) |
MANASH GHOSH |
DETAILED PROJECT REPORT FOR AUGMENTATION F GROUND WATER BASED KUSUMGRAM (ZONE I AND ZONE II) PWSS TO ACCOMMODATE FHTC IN MANTESWAR BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT ( SM/10058 ) |
495 |
| 18 |
01/12/2025 |
ISS/000077/2025-2026 |
Gun Metal Ferrule ,10 MM -In Each |
1469/BSD |
23/06/2025 |
Providing 32 Nos. FHTC at Krishnapur village under RAYAN [ PART-IV] DURGADANGA Piped Water Supply Scheme, Block- Burdwan-I within Burdwan Sub Division under Burdwan Division PHE Dte. |
POMPA CONSTRUCTION CO. |
AUGMENTATION RAYAN PART IV (DURGADANGA) PIPED WATER SUPPLY SCHEME ( SM/15556 ) |
29 |
| 19 |
04/12/2025 |
ISS/000078/2025-2026 |
D.I. Pipe ,K9 ,150 MM -In metre |
4388/BWD |
05/10/2023 |
Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and lan |
AKASH CONSTRUCTION |
GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR PIPLON PWSS IN MANTESHWAR BLOCK OF PURBA BURDWAN DISTRICT UNDER BURDWAN DIVISION, P.H.E. DTE. ( SM/13283 ) |
275 |