Rs. in Crore
Sl No. | District Name | TSM Code | Scheme Name | Scheme Category | Estimated Cost | No of Villages | No of FHTC | SLSSC Date |
---|---|---|---|---|---|---|---|---|
1 | COOCHBEHAR | TSM/006940 | Retrofitting works for providing functional household tap connection(FHTC) eithin the cpmmand area of Chakchaka Water Supply Scheme | Retrofitting | 0.98 | 5 | 959 | 08/01/2021 |
2 | COOCHBEHAR | TSM/006235 | Retrofitting of existing Basraja Pratham Khanda Piped Water Suply Scheme to provide FHTC connection to the people of the command area of the Scheme | Retrofitting | 0.98 | 1 | 1,548 | 25/09/2020 |
3 | COOCHBEHAR | TSM/006228 | Retrofitting of existing Singimari Paschimpar Piped Water Suply Scheme to provide FHTC connection to the people of the command area of Singimari Paschimpar Piped Water Supply Scheme | Retrofitting | 0.99 | 3 | 1,360 | 25/09/2020 |
4 | COOCHBEHAR | TSM/006946 | Retrofitting works for providing functional household tap connection(FHTC) eithin the cpmmand area of chonger khata khagrabari Water Supply Scheme | Retrofitting | 0.87 | 1 | 1,104 | 08/01/2021 |
5 | COOCHBEHAR | TSM/006947 | Retrofitting works for providing functional household tap connection(FHTC) eithin the cpmmand area of Baro pinjarir Jhar Water Supply Scheme | Retrofitting | 0.94 | 1 | 1,625 | 08/01/2021 |
6 | COOCHBEHAR | TSM/006229 | Retrofitting cum Rejuvenation of Matikata Piped Water Suply Scheme | Retrofitting | 0.97 | 5 | 1,389 | 25/09/2020 |
7 | COOCHBEHAR | TSM/006230 | Retrofitting cum Rejuvenation of Kalapani Piped Water Suply Scheme | Retrofitting | 0.96 | 3 | 1,290 | 25/09/2020 |
8 | COOCHBEHAR | TSM/006233 | Retrofitting of existing Krishnapur Piped Water Suply Scheme to provide FHTC connection to the people of the command area of the Scheme | Retrofitting | 0.96 | 3 | 1,382 | 25/09/2020 |
9 | COOCHBEHAR | TSM/006234 | Retrofitting of existing Chikliguri Dwitia Khanda Piped Water Suply Scheme to provide FHTC connection to the people of the command area of the Scheme | Retrofitting | 0.80 | 1 | 618 | 25/09/2020 |
10 | COOCHBEHAR | TSM/006944 | Retrofitting works for providing functional household tap connection(FHTC) eithin the cpmmand area of Bhanga More Water Supply Scheme | Retrofitting | 0.99 | 1 | 977 | 08/01/2021 |
11 | COOCHBEHAR | TSM/006951 | Retrofitting works for providing functional household tap connection(FHTC) eithin the cpmmand area of UTTAR FULKAR DABRI Water Supply Scheme | Retrofitting | 0.99 | 7 | 1,591 | 08/01/2021 |
12 | COOCHBEHAR | TSM/008954 | Rejuvination of Salbari Water Supply Scheme | Augmentation | 1.85 | 3 | 2,470 | 22/11/2021 |
13 | COOCHBEHAR | TSM/010036 | Rejuvenation of KHAPAIDANGA Water Supply Scheme | Augmentation | 1.00 | 1 | 998 | 27/01/2022 |
14 | COOCHBEHAR | TSM/009773 | Augmentation of RAMPUR Piped Water Supply Scheme | Augmentation | 16.96 | 4 | 6,826 | 16/12/2021 |
15 | COOCHBEHAR | TSM/014617 | AUGMENTATION OF BARA KODALI ZONE-II PWSS | Augmentation | 4.88 | 3 | 1,846 | 22/08/2022 |
16 | COOCHBEHAR | TSM/013274 | AUGMENTATION OF GROUND WATER BASED SOULMARI ZONE-I PIPED WATER SUPPLY SCHEME TO ACCOMMODATE FHTC IN DINHATA-II BLOCK WITHIN COOCH BEHAR DISTRICT UNDER COOCH BEHAR DIVISION, P.H.E. DTE. | Augmentation | 5.45 | 3 | 2,419 | 22/08/2022 |
17 | COOCHBEHAR | TSM/010170 | AUGMENTATION OF KHAGRABARI PIPED WATER SUPPLY SCHEME. | Augmentation | 25.28 | 8 | 9,620 | 30/03/2022 |
18 | COOCHBEHAR | TSM/014609 | AUGMENTATION OF GROUND WATER BASE HEMKUMARI ZONE-II ACCOMODATE FHTC IN HALDIBARI BLOCK WITHIN COOCH BEHAR DISTRICT UNDE COOCH BEHAR DIVISION . | Augmentation | 4.88 | 2 | 1,546 | 22/08/2022 |
19 | COOCHBEHAR | TSM/014610 | Augmentation of Ground Water Based Dakshin Basrajbala Zone-II PWSS (Haldibari Block) | Augmentation | 4.49 | 3 | 1,357 | 22/08/2022 |
20 | COOCHBEHAR | TSM/016283 | AUGMENTATION OF GROUND WATER BASED GAJENDRAPUR CHOWRANGEE PWSS HALDIBARI BLOCK WITHIN COOCH BEHAR DISTRICT UNDER COOCH BEHAR DIVISION, P.H.E. DTE. | Augmentation | 9.86 | 1 | 9,385 | 26/09/2022 |
21 | COOCHBEHAR | TSM/018219 | AUGMENTATION OF GROUND WATER BASED MAHISHKUCHI ZONE-I PIPED WATER SUPPLY SCHEME OF TUFANGUNJ-II BLOCK WITHIN COOCHBEHAR DISTRICT | Augmentation | 5.95 | 4 | 1,628 | 16/11/2022 |
22 | COOCHBEHAR | TSM/010042 | Rejuvenation of KUMIRGHAT Water Supply Scheme | Augmentation | 0.82 | 5 | 554 | 27/01/2022 |
23 | COOCHBEHAR | TSM/019998 | AGUMENTATION OF BASRAJA PRATHAM KHANDA PWSS | Augmentation | 5.24 | 1 | 525 | 28/12/2022 |
24 | COOCHBEHAR | TSM/020431 | GROUND WATER BASED PRAN MAJUMDER PIPED WATER SUPPLY AUGMENTATION SCHEME | Augmentation | 5.41 | 10 | 2,533 | 28/12/2022 |
25 | COOCHBEHAR | TSM/015355 | Augmentation of Bajejama Chilakhana ZONE-I PWSS | Augmentation | 3.93 | 3 | 1,186 | 09/09/2022 |
26 | COOCHBEHAR | TSM/009090 | AUGMENTATION OF RAKHALMARI PIPED WATER SUPPLY SCHEME | Augmentation | 4.24 | 1 | 908 | 08/10/2021 |
27 | COOCHBEHAR | TSM/010885 | AUGMENTATION OF KHOLTA PIPED WATER SUPPLY SCHEME | Augmentation | 10.66 | 1 | 3,370 | 30/03/2022 |
28 | COOCHBEHAR | TSM/006232 | Retrofitting of existing Deocharai Piped Water Suply Scheme to provide FHTC connection to the people of the command area of Deocharai Piped Water Supply Scheme | Retrofitting | 0.97 | 1 | 1,193 | 25/09/2020 |
29 | COOCHBEHAR | TSM/006952 | Retrofitting works for providing functional household tap connection(FHTC) eithin the cpmmand area of CHARALJANI Water Supply Scheme | Retrofitting | 0.83 | 6 | 1,212 | 08/01/2021 |
30 | COOCHBEHAR | TSM/008829 | Rejuvination of Takoamari water supply scheme | Augmentation | 1.04 | 1 | 1,188 | 08/10/2021 |
31 | COOCHBEHAR | TSM/009087 | AUGMENTATION OF CHANDAMARI PIPED WATER SUPPLY SCHEME | Augmentation | 5.99 | 1 | 1,813 | 08/10/2021 |
32 | COOCHBEHAR | TSM/008808 | Rejuvination of Sathbhandari water supply scheme | Augmentation | 1.63 | 3 | 1,719 | 22/11/2021 |
33 | COOCHBEHAR | TSM/006227 | Retrofitting cum rejuvenation of Dewanhat Piped Water Suply Scheme under Coochbehar Division PHE Dte. | Retrofitting | 8.48 | 4 | 5,193 | 25/09/2020 |
34 | COOCHBEHAR | TSM/009776 | Rejuvenation of HARI BHANGA Piped Water Supply Scheme | Augmentation | 2.10 | 5 | 3,106 | 16/12/2021 |
35 | COOCHBEHAR | TSM/008560 | Augmentation of Gosanimari piped water supply scheme. | Augmentation | 17.65 | 17 | 8,450 | 08/09/2021 |
36 | COOCHBEHAR | TSM/009086 | AUGMENTATION OF BANESWAR PIPED WATER SUPPLY SCHEME | Augmentation | 18.85 | 6 | 5,106 | 08/10/2021 |
37 | COOCHBEHAR | TSM/010033 | Rejuvenation of PUTIMARI PHULESWARI Water Supply Scheme | Augmentation | 0.71 | 2 | 490 | 27/01/2022 |
38 | COOCHBEHAR | TSM/015356 | Augmentation of bajejama chilakhana zone-II PWSS | Augmentation | 4.62 | 3 | 1,107 | 09/09/2022 |
39 | COOCHBEHAR | TSM/014622 | Augmentation of Ground Water Based Kuchlibari Zone-I PWSS ((Mekhliganj Block) | Augmentation | 4.97 | 15 | 1,558 | 22/08/2022 |
40 | COOCHBEHAR | TSM/016280 | AUGMENTATION OF GROUND WATER BASED NAKKATI PWSS COOCH BEHAR-I BLOCK WITHIN COOCH BEHAR DISTRICT UNDER COOCH BEHAR DIVISION, P.H.E. DTE. | Augmentation | 4.88 | 4 | 3,196 | 26/09/2022 |
41 | COOCHBEHAR | TSM/018080 | AUGMENTATION OF GROUND WATER BASED BAJRAPUR PWSS TUFANGANJ - II BLOCK WITHIN COOCHBEHAR DISTRICT UNDER COOCHBEHAR DIVISION, PHE DTE | Augmentation | 5.43 | 4 | 1,298 | 16/11/2022 |
42 | COOCHBEHAR | TSM/016281 | AUGMENTATION OF GROUND WATER BASED NAJIRAN DEUTIKATA PWSS TAFANGANJ-II BLOCK WITHIN COOCH BEHAR DISTRICT UNDER COOCH BEHAR DIVISION, P.H.E. DTE. | Augmentation | 4.55 | 2 | 2,944 | 16/11/2022 |
43 | COOCHBEHAR | TSM/010882 | Augmentation OF AMBARI PIPED WATER SUPPLY SCHEME | Augmentation | 6.35 | 1 | 2,132 | 22/08/2022 |
44 | COOCHBEHAR | TSM/019912 | AUGMENTATION OF Chhota Godaikhora Pwss | Augmentation | 1.96 | 3 | 1,547 | 16/11/2022 |
45 | COOCHBEHAR | TSM/010886 | REJUVENATION OF BARA ATIABARI PRATHAM KHANDA PIPED WATER SUPPLY SCHEME | Augmentation | 10.76 | 3 | 5,300 | 22/08/2022 |
46 | COOCHBEHAR | TSM/006938 | Retrofitting works for providing functional household tap connection(FHTC) eithin the cpmmand area of Bara Soulmari Water Supply Scheme | Retrofitting | 0.99 | 5 | 1,200 | 08/01/2021 |
47 | COOCHBEHAR | TSM/010255 | Rejuvenation of PAKHIHAGA Water Supply Scheme | Augmentation | 1.28 | 3 | 880 | 16/03/2022 |
48 | COOCHBEHAR | TSM/006931 | Retrofitting works for providing functional household tap connection(FHTC) eithin the cpmmand area of Putimari Phuleswari Water Supply Scheme | Retrofitting | 0.95 | 11 | 1,234 | 08/01/2021 |
49 | COOCHBEHAR | TSM/006226 | Retrofitting cum rejuvenation of Konachatra Piped Water Suply Scheme | Retrofitting | 0.95 | 6 | 803 | 25/09/2020 |
50 | COOCHBEHAR | TSM/006231 | Retrofitting cum Rejuvenation of Khapaidanga Piped Water Suply Scheme | Retrofitting | 0.99 | 1 | 1,466 | 25/09/2020 |
51 | COOCHBEHAR | TSM/008972 | Rejuvenation of Salmara water supply scheme | Augmentation | 5.20 | 9 | 3,389 | 22/11/2021 |
52 | COOCHBEHAR | TSM/010253 | Rejuvenation of RAMTHANGA Water Supply Scheme | Augmentation | 1.70 | 3 | 336 | 16/03/2022 |
53 | COOCHBEHAR | TSM/010254 | Rejuvenation of BARO PINJARERJHAR Water Supply Scheme | Augmentation | 1.18 | 1 | 124 | 16/03/2022 |
54 | COOCHBEHAR | TSM/008558 | Augmentation of Takagach piped water supply scheme. | Augmentation | 6.16 | 1 | 3,734 | 08/09/2021 |
55 | COOCHBEHAR | TSM/015348 | Augmentation of Ground Water Based Sitalkuchi Water Supply Scheme Zone-II to Accommodate FHTC in Sitalkuchi Block. | Augmentation | 9.95 | 6 | 3,356 | 09/09/2022 |
56 | COOCHBEHAR | TSM/013273 | AUGMENTATION OF GROUND WATER BASED BHULKI PIPED WATER SUPPLY SCHEME TO ACCOMMODATE FHTC IN DINHATA-II BLOCK WITHIN COOCH BEHAR DISTRICT UNDER COOCH BEHAR DIVISION, P.H.E. DTE. | Augmentation | 4.36 | 1 | 1,340 | 22/08/2022 |
57 | COOCHBEHAR | TSM/013272 | AUGMENTATION OF GROUND WATER BASED KHATTIMARI ZONE-I PIPED WATER SUPPLY SCHEME TO ACCOMMODATE FHTC IN DINHATA-II BLOCK WITHIN COOCH BEHAR DISTRICT UNDER COOCH BEHAR DIVISION, P.H.E. DTE. | Augmentation | 4.83 | 3 | 1,573 | 22/08/2022 |
58 | COOCHBEHAR | TSM/014619 | AUGMENTATION OF UCHAL PUKHARI ZONE-I PUBLICWATER SUPPLY SCHEME. | Augmentation | 8.36 | 9 | 2,874 | 22/08/2022 |
59 | COOCHBEHAR | TSM/016199 | AUGMENTATION OF GROUND WATER BASED CHARALJANI Piped Water Supply Scheme TUFANGANJ - I BLOCK WITHIN COOCH BEHAR DISTRICT UNDER COOCH BEHAR DIVISION, P.H.E. Dte. | Augmentation | 6.03 | 1 | 1,887 | 26/09/2022 |
60 | COOCHBEHAR | TSM/016200 | AUGMENTATION OF GROUND WATER BASED CHIKLIGURI PIPED WATER SUPPLY SCHEME TUFANGANJ - I BLOCK WITHIN COOCH BEHAR DISTRICT UNDER COOCH BEHAR DIVISION, P.H.E. Dte. | Augmentation | 1.57 | 1 | 168 | 26/09/2022 |
61 | COOCHBEHAR | TSM/018340 | AUGUMENTATION OF GROUND WATER BASED MARANADIRKUTHI PWSS COOCHBEHAR II BLOCK WITHIN COOCHBEHAR DISTRICT UNDER COOCHBEHAR DIVISION , PHE DTE | Augmentation | 3.17 | 5 | 2,929 | 16/11/2022 |
62 | COOCHBEHAR | TSM/018233 | AUGMENTATION OF GROUND WATER BASED MAHISHKUCHI ZONE-II PIPED WATER SUPPLY SCHEME OF TUFANGUNJ-II BLOCK WITHIN COOCHBEHAR DISTRICT | Augmentation | 3.29 | 1 | 416 | 28/12/2022 |
63 | COOCHBEHAR | TSM/018467 | AUGMENTATION OF GROUND WATER BASED CHHAT RAMPUR PWSS TUFANGANJ I BLOCK WITHIN COOCHBEHAR DISTRICT UNDER COOCHBEHAR DIVISION , PHE DTE | Augmentation | 4.94 | 4 | 1,097 | 28/12/2022 |
64 | COOCHBEHAR | TSM/018084 | AUGMENTATION OF GROUND WATER BASED GHARGHARIA ZONE -II PWSS COOCHBEHAR I BLOCK WITHIN COOCHBEHAR DISTRICT UNDER COOCHBEHAR DIVISION, PHE DTE | Augmentation | 2.40 | 4 | 276 | 28/12/2022 |
65 | COOCHBEHAR | TSM/014612 | AUGMENTATION OF GROUND WATER HEMKUMARI ZONE-I ACCOMODATE FHTC IN HALDIBARI BLOCK WITHIN COOCH BEHAR DISTRICT UNDE COOCH BEHAR DIVISION | Augmentation | 4.88 | 2 | 2,480 | 22/08/2022 |
66 | COOCHBEHAR | TSM/010884 | REJUVENATION OF SATKURA PIPED WATER SUPPLY SCHEME | Augmentation | 5.36 | 3 | 2,258 | 22/08/2022 |
67 | COOCHBEHAR | TSM/006225 | Retrofitting cum rejuvenation of Alokjhari Piped Water Suply Scheme | Retrofitting | 0.87 | 4 | 1,087 | 25/09/2020 |
68 | COOCHBEHAR | TSM/006236 | Retrofitting of existing Bilsi Piped Water Suply Scheme to provide FHTC connection to the people of the command area of the Scheme | Retrofitting | 0.99 | 5 | 1,412 | 25/09/2020 |
69 | COOCHBEHAR | TSM/006239 | Retrofitting of existing Bhandijalas Piped Water Suply Scheme to provide FHTC connection to the people of the command area of the Scheme | Retrofitting | 0.96 | 1 | 1,231 | 25/09/2020 |
70 | COOCHBEHAR | TSM/009085 | AUGMENTATION OF DHALPAL PIPED WATER SUPPLY SCHEME | Augmentation | 6.55 | 1 | 1,920 | 08/10/2021 |
71 | COOCHBEHAR | TSM/008970 | Augmentation of dhaluabari water supply scheme | Augmentation | 6.37 | 5 | 2,018 | 22/11/2021 |
72 | COOCHBEHAR | TSM/008965 | Augumentation of Nalangibari Water Supply scheme | Augmentation | 4.35 | 9 | 3,796 | 22/11/2021 |
73 | COOCHBEHAR | TSM/009750 | Augmentation works for Providing Functional House Hold Tap Connection (FJTC) within command area of Baro Dhaperchatra Piped water supply Scheme. | Augmentation | 3.05 | 3 | 1,880 | 16/12/2021 |
74 | COOCHBEHAR | TSM/009753 | Augmentation works for Providing Functional House Hold Tap Connection ( FHTC) within Commandarea of ANDARAN NIJTARAF Piped water supply schemes. | Augmentation | 7.70 | 2 | 3,559 | 16/12/2021 |
75 | COOCHBEHAR | TSM/010250 | Rejuvenation of LOTAPOTA Water Supply Scheme | Augmentation | 0.94 | 3 | 631 | 16/03/2022 |
76 | COOCHBEHAR | TSM/009056 | AUGMENTATION OF ANDARAN PHULBARI PIPED WATER SUPPLY SCHEME | Augmentation | 12.07 | 1 | 4,790 | 22/11/2021 |
77 | COOCHBEHAR | TSM/009780 | Rejuvenation of LAUCHAPRA Piped Water Supply Scheme | Augmentation | 5.92 | 14 | 4,465 | 16/12/2021 |
78 | COOCHBEHAR | TSM/009091 | AUGMENTATION OF CHHOTA SAKDAL PIPED WATER SUPPLY SCHEME | Augmentation | 4.96 | 2 | 1,107 | 08/10/2021 |
79 | COOCHBEHAR | TSM/008563 | Augmentation of Sitai piped water supply scheme. | Augmentation | 17.35 | 8 | 7,771 | 08/09/2021 |
80 | COOCHBEHAR | TSM/008564 | Augmentation of Chilakhana piped water supply scheme. | Augmentation | 11.28 | 4 | 6,406 | 08/09/2021 |
81 | COOCHBEHAR | TSM/010039 | Rejuvenation of CHHAGALBER Water Supply Scheme | Augmentation | 1.11 | 7 | 1,316 | 27/01/2022 |
82 | COOCHBEHAR | TSM/013269 | AUGMENTATION OF GROUND WATER BASED BARAKODALI ZONE-I PIPED WATER SUPPLY SCHEME TO ACCOMMODATE FHTC IN TUFANGANJ-II BLOCK WITHIN COOCH BEHAR DISTRICT UNDER COOCH BEHAR DIVISION, P.H.E. DTE. | Augmentation | 5.17 | 2 | 2,538 | 22/08/2022 |
83 | COOCHBEHAR | TSM/013275 | AUGMENTATION OF GROUND WATER BASED BASKOTAL PIPED WATER SUPPLY SCHEME TO ACCOMMODATE FHTC IN DINHATA-II BLOCK WITHIN COOCH BEHAR DISTRICT UNDER COOCH BEHAR DIVISION, P.H.E. DTE. | Augmentation | 2.94 | 1 | 646 | 22/08/2022 |
84 | COOCHBEHAR | TSM/016279 | AUGMENTATION OF GROUND WATER BASED BARAIBARI PWSS COOCH BEHAR-II BLOCK WITHIN COOCH BEHAR DISTRICT UNDER COOCH BEHAR DIVISION, P.H.E. DTE. | Augmentation | 4.74 | 6 | 2,784 | 26/09/2022 |
85 | COOCHBEHAR | TSM/015359 | Augmentation of Santoshpur zone-II PWSS Accommodate FHTC in TFG-I Block . | Augmentation | 4.41 | 2 | 1,032 | 09/09/2022 |
86 | COOCHBEHAR | TSM/016304 | AUGMENTATION OF GROUND WATER BASED ALOKJHARI PWSS DINHATA -I BLOCK WITHIN COOCHBEHAR DISTRICT UNDER COOCHBEHAR DIVISION | Augmentation | 3.44 | 4 | 2,627 | 26/09/2022 |
87 | COOCHBEHAR | TSM/019963 | Augmentation of Natabari Pwss | Augmentation | 6.78 | 7 | 2,112 | 16/11/2022 |
88 | COOCHBEHAR | TSM/017369 | AUGMENTATION OF GROUND WATER BASED DALUA DASGIR PWSS COOCHBEHAR - I BLOCK WITHIN COOCHBEHAR DISTRICT UNDER COOCHBEHAR DIVISION, PHE DTE | Augmentation | 4.88 | 3 | 1,085 | 28/12/2022 |
89 | COOCHBEHAR | TSM/018355 | AUGUMENTATION OF GROUND WATER BASED BARAI BARI PWSS MATHABHANGA II BLOCK WITHIN COOCHBEHAR DISTRICT UNDER COOCHBEHAR DIVISION , PHE DTE | Augmentation | 5.21 | 1 | 1,243 | 28/12/2022 |
90 | COOCHBEHAR | TSM/016051 | AUGMENTATION OF GROUND WATER BASED HEMKUMARI PIPED WATER SUPPLY SCHEME ZONE-I (PART-B) ACCOMODATE FHTC IN HALDIBARI BLOCK WITHIN COOCH BEHAR DISTRICT UNDE COOCH BEHAR DIVISION, PHED. | Augmentation | 1.42 | 2 | 934 | 16/11/2022 |
91 | COOCHBEHAR | TSM/010037 | Rejuvenation of BHANDIJALAS Water Supply Scheme | Augmentation | 0.60 | 1 | 109 | 27/01/2022 |
92 | COOCHBEHAR | TSM/006953 | Retrofitting works for providing functional household tap connection(FHTC) eithin the cpmmand area of BOGDABARI KESAIBARI Water Supply Scheme | Retrofitting | 1.00 | 8 | 1,104 | 08/01/2021 |
93 | COOCHBEHAR | TSM/006932 | Retrofitting works for providing functional household tap connection(FHTC) eithin the cpmmand area of Marichbari Water Supply Scheme | Retrofitting | 1.00 | 3 | 1,285 | 08/01/2021 |
94 | COOCHBEHAR | TSM/006945 | Retrofitting works for providing functional household tap connection(FHTC) eithin the cpmmand area of Jamaldah hat Water Supply Scheme | Retrofitting | 2.07 | 15 | 2,600 | 08/01/2021 |
95 | COOCHBEHAR | TSM/006935 | Retrofitting works for providing functional household tap connection(FHTC) eithin the cpmmand area of Putimari Water Supply Schem | Retrofitting | 0.98 | 2 | 1,194 | 08/01/2021 |
96 | COOCHBEHAR | TSM/006949 | Retrofitting works for providing functional household tap connection(FHTC) eithin the cpmmand area of Pakhihaga Water Supply Scheme | Retrofitting | 1.00 | 3 | 1,319 | 08/01/2021 |
97 | COOCHBEHAR | TSM/008958 | REJUVINATION OF RAJPUR WATER SUPPLY SCHEME | Augmentation | 1.49 | 7 | 1,815 | 08/10/2021 |
98 | COOCHBEHAR | TSM/008833 | REJUVINATION OF CHAMTA WATER SUPPLY SCHEME | Augmentation | 1.84 | 1 | 2,251 | 08/10/2021 |
99 | COOCHBEHAR | TSM/006933 | Retrofitting works for providing functional household tap connection(FHTC) eithin the cpmmand area of Natabari Water Supply Scheme | Retrofitting | 7.43 | 7 | 4,449 | 08/01/2021 |
100 | COOCHBEHAR | TSM/008969 | Augmentation of Dakshin Bajejama Water Supply Scheme. | Augmentation | 3.37 | 4 | 2,091 | 22/11/2021 |
101 | COOCHBEHAR | TSM/008834 | REJUVINATION OF KISMAT DASGRAM WATER SUPPLY SCHEME | Augmentation | 1.92 | 2 | 2,489 | 22/11/2021 |
102 | COOCHBEHAR | TSM/009132 | AUGMENTATION OF KAMINIRGHAT PIPED WATER SUPPLY SCHEME | Augmentation | 7.43 | 3 | 2,372 | 22/11/2021 |
103 | COOCHBEHAR | TSM/008831 | Rejuvination of Chhatoa water supply scheme | Augmentation | 1.40 | 3 | 1,724 | 22/11/2021 |
104 | COOCHBEHAR | TSM/010040 | Rejuvenation of BOGDABARI KESAIBARI Water Supply Scheme | Augmentation | 1.00 | 5 | 765 | 27/01/2022 |
105 | COOCHBEHAR | TSM/009868 | AUGMENTATION FOR PURBBA DHULIA BALDIHATI PIPED WATER SUPPLY SCHEME | Augmentation | 11.21 | 11 | 3,031 | 16/03/2022 |
106 | COOCHBEHAR | TSM/014618 | AUGMENTATION OF GROUND WATER BASED UPENCHAUKIKUCHLIBARI PIPED WATER SUPPLY SCHEME | Augmentation | 4.37 | 9 | 1,604 | 22/08/2022 |
107 | COOCHBEHAR | TSM/006237 | Retrofitting of existing Nakkatigachhi & Adjoining Mouzas Piped Water Suply Scheme to provide FHTC connection to the people of the command area of the Scheme | Retrofitting | 0.99 | 3 | 1,596 | 25/09/2020 |
108 | COOCHBEHAR | TSM/014607 | Augmentation of Ground water based Soulmari Zone-II Piped Water Supply Scheme(Dinhata-II) | Augmentation | 6.23 | 7 | 2,444 | 22/08/2022 |
109 | COOCHBEHAR | TSM/016314 | AUGMENTATION OF GROUND WATER BASED BARA PHALIMARI PWSS DINHATA -I BLOCK WITHIN COOCHBEHAR DISTRICT UNDER COOCHBEHAR DIVISION, PHE DTE | Augmentation | 4.62 | 5 | 2,968 | 26/09/2022 |
110 | COOCHBEHAR | TSM/010601 | AUGMENTATION OF KALARAYERKUTHI PIPED WATER SUPPLY SCHEME | Augmentation | 18.95 | 4 | 6,863 | 30/03/2022 |
111 | COOCHBEHAR | TSM/020152 | AUGMENTATION OF KRISHNAPUR PIPED WATER SUPPLY SCHEME | Augmentation | 2.71 | 3 | 250 | 16/11/2022 |
112 | COOCHBEHAR | TSM/018082 | AUGMENTATION OF GROUND WATER BASED SHILGHAGRI PWSS TUFANGANJ - II BLOCK WITHIN COOCHBEHAR DISTRICT UNDER COOCHBEHAR DIVISION, PHE DTE | Augmentation | 2.85 | 1 | 489 | 28/12/2022 |
113 | COOCHBEHAR | TSM/009896 | Augmentation of GHUGHUMARI Piped Water Supply Scheme | Augmentation | 15.48 | 8 | 6,473 | 16/12/2021 |
114 | COOCHBEHAR | TSM/018337 | AUGUMENTATION OF GROUND WATER BASED CHAKCHAKA ZONE I PWSS COOCHBEHAR II BLOCK WITHIN COOCHBEHAR DISTRICT UNDER COOCHBEHAR DIVISION , PHE DTE | Augmentation | 8.86 | 5 | 3,977 | 16/11/2022 |
115 | COOCHBEHAR | TSM/016282 | AUGMENTATION OF GROUND WATER BASED GOPALPUR PWSS COOCH BEHAR-II BLOCK WITHIN COOCH BEHAR DISTRICT UNDER COOCH BEHAR DIVISION, P.H.E. DTE. | Augmentation | 9.61 | 3 | 3,871 | 16/11/2022 |
116 | COOCHBEHAR | TSM/016278 | AUGMENTATION OF GROUND WATER BASED NAJIRGANJ PWSS DINHATA-II BLOCK WITHIN COOCH BEHAR DISTRICT UNDER COOCH BEHAR DIVISION, P.H.E. DTE. | Augmentation | 5.26 | 7 | 1,226 | 16/11/2022 |
117 | COOCHBEHAR | TSM/006936 | Retrofitting works for providing functional household tap connection(FHTC) eithin the cpmmand area of Ekmukha Water Supply Scheme | Retrofitting | 0.99 | 7 | 1,357 | 08/01/2021 |
118 | COOCHBEHAR | TSM/006941 | Retrofitting works for providing functional household tap connection(FHTC) eithin the cpmmand area of Gopalpur Water Supply Scheme | Retrofitting | 0.98 | 3 | 1,000 | 08/01/2021 |
119 | COOCHBEHAR | TSM/010249 | Rejuvenation of UTTAR FULKARDABRI Water Supply Scheme | Augmentation | 1.54 | 15 | 227 | 16/03/2022 |
120 | COOCHBEHAR | TSM/010256 | Rejuvenation of JAMALDAH HAT Water Supply Scheme | Augmentation | 1.69 | 22 | 171 | 16/03/2022 |
121 | COOCHBEHAR | TSM/009752 | Augmentation of PURBA FULKARDABRI Piped water supply schemes. | Augmentation | 4.85 | 3 | 2,368 | 16/12/2021 |
122 | COOCHBEHAR | TSM/009754 | Augmentation of NIJTARAF Piped water supply schemes | Augmentation | 4.21 | 15 | 2,073 | 16/12/2021 |
123 | COOCHBEHAR | TSM/009751 | Augmentation of SALMARA PRATHAM KHANDA Piped water supply schemes. | Augmentation | 4.39 | 8 | 2,432 | 16/12/2021 |
124 | COOCHBEHAR | TSM/009092 | AUGMENTATION OF BAKSIRHAT PIPED WATER SUPPLY SCHEME | Augmentation | 20.35 | 6 | 8,205 | 22/11/2021 |
125 | COOCHBEHAR | TSM/009895 | Augmentation of BARA KAIMARI Piped Water Supply Scheme | Augmentation | 5.64 | 4 | 1,671 | 16/12/2021 |
126 | COOCHBEHAR | TSM/010038 | Rejuvenation of SINGIMARI PASCHIMPAR Water Supply Scheme | Augmentation | 1.35 | 3 | 1,360 | 27/01/2022 |
127 | COOCHBEHAR | TSM/010034 | Rejuvenation of PANISALA Water Supply Scheme | Augmentation | 1.04 | 3 | 1,187 | 27/01/2022 |
128 | COOCHBEHAR | TSM/010041 | Rejuvenation of MARICHBARI Water Supply Scheme | Augmentation | 0.97 | 2 | 885 | 27/01/2022 |
129 | COOCHBEHAR | TSM/010175 | AUGMENTATION OF NIGAMNAGAR PIPED WATER SUPPLY SCHEME COB Division PHED. | Augmentation | 25.12 | 5 | 6,886 | 16/03/2022 |
130 | COOCHBEHAR | TSM/016277 | AUGMENTATION OF GROUND WATER BASED BHURKUSH PWSS TAFANGANJ-I BLOCK WITHIN COOCH BEHAR DISTRICT UNDER COOCH BEHAR DIVISION, P.H.E. DTE. | Augmentation | 2.77 | 5 | 1,416 | 26/09/2022 |
131 | COOCHBEHAR | TSM/009898 | Augmentation of MARADANGA Piped Water Supply Scheme | Augmentation | 16.41 | 8 | 5,550 | 16/12/2021 |
132 | COOCHBEHAR | TSM/015357 | Augmentatin of Bajejama Chilakhana Zone-III PWSS Accomodate FHTC in TFG-I BLOCK | Augmentation | 4.96 | 1 | 1,486 | 09/09/2022 |
133 | COOCHBEHAR | TSM/015368 | AUGMENTATION OF GROUND WATER BASED SITALKUCHI WATER SUPPLY SCHEME ZONE-III TO ACCOMMODATE FHTC IN SITALKUCHI BLOCK | Augmentation | 8.51 | 4 | 2,671 | 09/09/2022 |
134 | COOCHBEHAR | TSM/015358 | Augmentation of Santoshpur Zone-I PWSS Accommodate FHTC in TFG-I Block under Cooch Behar Division. | Augmentation | 4.68 | 5 | 1,628 | 09/09/2022 |
135 | COOCHBEHAR | TSM/014613 | AUGMENTATION OF GROUND WATER JIRANPUR ZONE-I (B) ACCOMODATE FHTC IN HALDIBARI BLOCK WITHIN COOCH BEHAR DISTRICT UNDE COOCH BEHAR DIVISION | Augmentation | 4.62 | 4 | 1,294 | 22/08/2022 |
136 | COOCHBEHAR | TSM/014614 | Augmentation of Ground Water Based Khattimari Zone-II PWSS (Dinhata-II) | Augmentation | 5.77 | 4 | 1,750 | 22/08/2022 |
137 | COOCHBEHAR | TSM/014665 | Augmentation of Ground Water Based UCHALPUKURI ZONE-II Piped Water Supply Scheme to Accommodate FHTC in Mekhliganj Block within Cooch Behar District under Cooch Behar Division, P.H.E. Dte. | Augmentation | 9.48 | 6 | 3,575 | 22/08/2022 |
138 | COOCHBEHAR | TSM/017362 | AUGMENTATION OF GROUND WATER BASED BHERBHERI PWSS MATHABHANGA - II BLOCK WITHIN COOCHBEHAR DISTRICT | Augmentation | 5.75 | 3 | 1,687 | 16/11/2022 |
139 | COOCHBEHAR | TSM/018196 | AUGMENTATION OF GROUND WATER BASED KONACHATRA ZONE-II PIPED WATER SUPPLY SCHEME OF SITAI BLOCK WITHIN COOCHBEHAR DISTRICT | Augmentation | 5.80 | 3 | 2,154 | 16/11/2022 |
140 | COOCHBEHAR | TSM/018176 | AUGMENTATION OF GROUND WATER BASED KONACHATRA ZONE-I PIPED WATER SUPPLY SCHEME OF SITAI BLOCK WITHIN COOCHBEHAR DISTRICT | Augmentation | 9.40 | 4 | 3,629 | 16/11/2022 |
141 | COOCHBEHAR | TSM/015367 | AUGMENTATION OF GROUND WATER BASED SITALKUCHI WATER SUPPLY SCHEME ZONE-IV TO ACCOMMODATE FHTC IN SITALKUCHI BLOCK | Augmentation | 9.97 | 2 | 3,222 | 09/09/2022 |
142 | COOCHBEHAR | TSM/015360 | Augmentation of Ground water based Shikarpur PWSS to accommodate FHTC in Tufanganj-I Block | Augmentation | 7.04 | 2 | 2,774 | 09/09/2022 |
143 | COOCHBEHAR | TSM/006943 | Retrofitting works for providing functional household tap connection(FHTC) eithin the cpmmand area of Najirganj Water Supply Scheme | Retrofitting | 1.00 | 7 | 1,150 | 08/01/2021 |
144 | COOCHBEHAR | TSM/006238 | Retrofitting of existing Bhurkush Piped Water Suply Scheme to provide FHTC connection to the people of the command area of the Scheme | Retrofitting | 0.95 | 5 | 1,231 | 25/09/2020 |
145 | COOCHBEHAR | TSM/006937 | Retrofitting works for providing functional household tap connection(FHTC) eithin the cpmmand area of Kharimala Khagrabari(CT) Water Supply Scheme | Retrofitting | 0.91 | 1 | 1,596 | 08/01/2021 |
146 | COOCHBEHAR | TSM/006934 | Retrofitting works for providing functional household tap connection(FHTC) eithin the cpmmand area of Najiran Deutikhata Water Supply Scheme | Retrofitting | 0.91 | 4 | 1,307 | 08/01/2021 |
147 | COOCHBEHAR | TSM/006948 | Retrofitting works for providing functional household tap connection(FHTC) eithin the cpmmand area of Chhat khater Bari Water Supply Scheme | Retrofitting | 0.77 | 1 | 666 | 08/01/2021 |
148 | COOCHBEHAR | TSM/006942 | Retrofitting works for providing functional household tap connection(FHTC) eithin the cpmmand area of Chhagalber Water Supply Scheme | Retrofitting | 0.98 | 2 | 1,250 | 08/01/2021 |
149 | COOCHBEHAR | TSM/008565 | Augmentation of Rasikbil piped water supply scheme. | Augmentation | 8.84 | 4 | 3,191 | 08/09/2021 |
150 | COOCHBEHAR | TSM/009897 | Augmentation works for providing Functional House hold Tap Connection Within the Command Area of MADHYA HUDUMDANGA Piped Water Supply Scheme | Augmentation | 6.20 | 6 | 3,342 | 16/12/2021 |
151 | COOCHBEHAR | TSM/008968 | Augmentation of Kauardara Water Supply Scheme | Augmentation | 4.17 | 3 | 2,926 | 22/11/2021 |
152 | COOCHBEHAR | TSM/010252 | Rejuvenation of CHUNGERKHATA KHAGRIBARI Water Supply Scheme | Augmentation | 1.00 | 1 | 215 | 16/03/2022 |
153 | COOCHBEHAR | TSM/010251 | Rejuvenation of BHANGA MORE Water Supply Scheme | Augmentation | 1.80 | 1 | 652 | 16/03/2022 |
154 | COOCHBEHAR | TSM/010043 | Rejuvenation of KALAPANI Water Supply Scheme | Augmentation | 0.57 | 2 | 180 | 27/01/2022 |
155 | COOCHBEHAR | TSM/008562 | Augmentation of Singimari Bhetaguri piped water supply scheme. | Augmentation | 13.73 | 7 | 5,509 | 08/09/2021 |
156 | COOCHBEHAR | TSM/010877 | AUGMENTATION OF CHEKIACHARA PIPED WATER SUPPLY SCHEME | Augmentation | 16.89 | 13 | 6,354 | 30/03/2022 |
157 | COOCHBEHAR | TSM/014611 | Augmentation of Ground Water Based Chilkirhat PWSS (Cooch Behar-I Block) under Cooch Behar Division, P.H.E .Dte. | Augmentation | 6.47 | 1 | 1,756 | 22/08/2022 |
158 | COOCHBEHAR | TSM/014608 | Augmentation of Ground Water Based Dakshin Basrajbala Zone-I PWSS (HALDIBARI Block) | Augmentation | 4.76 | 7 | 1,542 | 22/08/2022 |
159 | COOCHBEHAR | TSM/015369 | AUGMENTATION OF GROUND WATER BASED SITALKUCHI WATER SUPPLY SCHEME ZONE-I TO ACCOMMODATE FHTC IN SITALKUCHI BLOCK | Augmentation | 10.00 | 1 | 3,932 | 09/09/2022 |
160 | COOCHBEHAR | TSM/019961 | AUGMENTATION OF BILSI PIPED WATER SUPPLY SCHEME | Augmentation | 1.20 | 9 | 179 | 28/12/2022 |
161 | COOCHBEHAR | TSM/018081 | AUGMENTATION OF GROUND WATER BASED MUKUL DANGA PWSS MATHABHANGA - II BLOCK WITHIN COOCHBEHAR DISTRICT UNDER COOCHBEHAR DIVISION, PHE DTE | Augmentation | 5.54 | 2 | 1,474 | 16/11/2022 |
162 | COOCHBEHAR | TSM/017373 | AUGMENTATION OF GROUND WATER BASED DHALDIBARI PIPED WATER SUPPLY SCHEME OF TUFANGANJ - II BLOCK WITHIN COOCHBEHAR DISTRICT | Augmentation | 5.52 | 1 | 1,273 | 28/12/2022 |
163 | COOCHBEHAR | TSM/019901 | Augmentation of Tutiarkuthi Piped Water Supply Scheme. | Augmentation | 6.17 | 9 | 4,749 | 16/11/2022 |
164 | COOCHBEHAR | TSM/019962 | AUGMENTATION OF BARA GADAIKHORA PIPED WATER SUPPLY SCHEME | Augmentation | 3.14 | 4 | 2,127 | 16/11/2022 |
165 | COOCHBEHAR | TSM/019938 | AUGMENTATION OF KHARIKABARI PIPED WATER SUPPLY SCHEME | Augmentation | 4.57 | 6 | 2,935 | 16/11/2022 |
166 | COOCHBEHAR | TSM/017374 | AUGMENTATION OF GROUND WATER BASED MANTANI PWSS TUFANGANJ - II BLOCK WITHIN COOCHBEHAR DISTRICT UNDER COOCHBEHAR DIVISION, PHE DTE | Augmentation | 3.22 | 2 | 553 | 28/12/2022 |
167 | COOCHBEHAR | TSM/018468 | AUGMENTATION OF GROUND WATER BASED PHULBARI PART A PWSS | Augmentation | 5.65 | 1 | 1,883 | 28/12/2022 |
168 | COOCHBEHAR | TSM/018083 | AUGMENTATION OF GROUND WATER BASED GHARGHARIA ZONE -I PWSS COOCHBEHAR I BLOCK WITHIN COOCHBEHAR DISTRICT UNDER COOCHBEHAR DIVISION, PHE DTE | Augmentation | 3.06 | 2 | 494 | 28/12/2022 |
169 | COOCHBEHAR | TSM/019999 | Augmentation of Panisala PWSS. | Augmentation | 1.33 | 3 | 230 | 28/12/2022 |
170 | COOCHBEHAR | TSM/019951 | AUGMENTATION OF BALABHUT PIPED WATER SUPPLY SCHEME | Augmentation | 2.18 | 3 | 1,723 | 16/11/2022 |
171 | COOCHBEHAR | TSM/006929 | Retrofitting works for providing functional household tap connection(FHTC) eithin the cpmmand area of Kumirghat Water Supply Scheme | Retrofitting | 0.88 | 5 | 1,081 | 08/01/2021 |
172 | COOCHBEHAR | TSM/006939 | Retrofitting works for providing functional household tap connection(FHTC) eithin the cpmmand area of Balakandi Water Supply Scheme | Retrofitting | 0.59 | 2 | 544 | 08/01/2021 |
173 | COOCHBEHAR | TSM/008957 | Augumentation of Petla Water Supply Scheme. | Augmentation | 3.62 | 1 | 1,365 | 08/10/2021 |
174 | COOCHBEHAR | TSM/009089 | AUGMENTATION OF DAUAGURI PIPED WATER SUPPLY SCHEME | Augmentation | 4.13 | 1 | 1,468 | 08/10/2021 |
175 | COOCHBEHAR | TSM/009088 | AUGMENTATION OF GURIAHATI PIPED WATER SUPPLY SCHEME | Augmentation | 3.75 | 1 | 985 | 08/10/2021 |
176 | COOCHBEHAR | TSM/008971 | Rejuvenation of Payamari Water Supply Scheme | Augmentation | 3.59 | 1 | 2,558 | 22/11/2021 |
177 | COOCHBEHAR | TSM/009756 | Augmentation works for Providing Functional House Hold Tap Connection ( FHTC) within Commandarea of SOULMARI Piped water supply schemes. | Augmentation | 3.66 | 4 | 1,775 | 16/12/2021 |
178 | COOCHBEHAR | TSM/009894 | Augmentation works for providing functional household tap connection within command area of NAGAR CHANGRABANDA Piped Water Supply Scheme | Augmentation | 8.83 | 2 | 3,351 | 16/12/2021 |
179 | COOCHBEHAR | TSM/006930 | Retrofitting Cum Rejuvenation of existing ground water baed Balarampur piped water supply scheme | Retrofitting | 17.20 | 3 | 8,517 | 08/01/2021 |
180 | COOCHBEHAR | TSM/009774 | Augmentation of CHAT RAMPUR DWITIYA KHANDA Piped Water Supply Scheme | Augmentation | 5.25 | 2 | 1,467 | 16/12/2021 |
181 | COOCHBEHAR | TSM/009781 | Rejuvenation of NAGARERBARI Piped Water Supply Scheme | Augmentation | 5.10 | 9 | 7,552 | 16/12/2021 |
182 | COOCHBEHAR | TSM/009775 | Augmentation of JHAUKUTHI Piped Water Supply Scheme | Augmentation | 3.28 | 1 | 962 | 16/12/2021 |
183 | COOCHBEHAR | TSM/010124 | AUGMENTATION OF GHOKSADANGA PIPED WATER SUPPLY SCHEME | Augmentation | 20.78 | 6 | 6,697 | 16/03/2022 |
184 | COOCHBEHAR | TSM/006950 | Retrofitting works for providing functional household tap connection(FHTC) eithin the cpmmand area of Ramthanga Water Supply Scheme | Retrofitting | 0.98 | 3 | 2,202 | 08/01/2021 |
185 | COOCHBEHAR | TSM/010971 | AUGMENTATION OF NAHARHAT BANDAR PIPED WATER SUPPLY SCHEME | Augmentation | 5.06 | 1 | 1,374 | 30/03/2022 |
186 | COOCHBEHAR | TSM/010035 | Rejuvenation of DEOCHARAI Water Supply Scheme | Augmentation | 0.73 | 1 | 490 | 27/01/2022 |
187 | COOCHBEHAR | TSM/014621 | AUGMENTATION OF GROUND WATER BASED KUCHLIBARI ZONE-II PWSS | Augmentation | 6.30 | 12 | 2,265 | 22/08/2022 |
188 | COOCHBEHAR | TSM/015366 | Augmentation of Ground water based Sitalkuchi water supply scheme Zone- V to accommodate FHTC in Sitalkuchi Block | Augmentation | 8.99 | 5 | 3,408 | 09/09/2022 |
189 | COOCHBEHAR | TSM/014615 | AUGMENTATION OF HEMKUMARI PWSS ZONE-III | Augmentation | 6.15 | 2 | 2,117 | 22/08/2022 |
190 | COOCHBEHAR | TSM/014616 | AUGMENTATION OF JIRANPUR ZONE-I (A) PWSS. | Augmentation | 4.74 | 2 | 1,597 | 22/08/2022 |
191 | COOCHBEHAR | TSM/014623 | Augmentation of Ground Water Based Putia Bara Masia Zone-I PWSS (Sitalkuchi Block) | Augmentation | 7.98 | 4 | 3,874 | 22/08/2022 |
192 | COOCHBEHAR | TSM/014620 | Augmentation of Ground Water Based Putia Bara Masia Zone-II (Sitalkuchi Block) | Augmentation | 9.33 | 2 | 3,410 | 22/08/2022 |
193 | COOCHBEHAR | TSM/018336 | AUGUMENTATION OF GROUND WATER BASED HARINCHAOWRA PWSS COOCHBEHAR 1 BLOCK WITHIN COOCHBEHAR DISTRICT UNDER COOCHBEHAR DIVISION, PHE DTE | Augmentation | 4.45 | 2 | 1,225 | 16/11/2022 |
194 | COOCHBEHAR | TSM/017376 | AUGMENTATION OF GROUND WATER BASED BARASOLMARI-SINGIJANI PWSS MATHABHANGA - II BLOCK WITHIN COOCHBEHAR DISTRICT | Augmentation | 5.39 | 1 | 1,539 | 28/12/2022 |
195 | COOCHBEHAR | TSM/016198 | AUGMENTATION OF GROUND WATER BASED NAKKATIGACHHI PIPED WATER SUPPLY SCHEME TUFANGANJ - I BLOCK WITHIN COOCHBEHAR DISTRICT UNDER COOCH BEHAR DIVISION, P.H.E. Dte. | Augmentation | 4.15 | 3 | 1,298 | 16/11/2022 |
196 | COOCHBEHAR | TSM/018339 | AUGUMENTATION OF GROUND WATER BASED CHAKCHAKA ZONE II PWSS COOCHBEHAR II BLOCK WITHIN COOCHBEHAR DISTRICT UNDER COOCHBEHAR DIVISION , PHE DTE | Augmentation | 3.30 | 4 | 788 | 16/11/2022 |
197 | COOCHBEHAR | TSM/019982 | Augmentation of Guriahati Pwss | Augmentation | 14.42 | 1 | 5,986 | 16/11/2022 |
198 | COOCHBEHAR | TSM/010440 | AUGMENTATION OF SIKARPUR PIPED WATER SUPPLY SCHEME | Augmentation | 16.94 | 10 | 5,630 | 30/03/2022 |
Grand Total | 1,018.13 | 818 | 4,54,737 | # |