| 1 |
NADIA |
TSM/006822 |
Providing FHTC (Functional Household Tap Connection) under Jaldhara / Jal Swapna for Zone-VIII, (Tarinipur), Part-II at Chakdah Block by retrofitting of Surface Water based PWSS for Haringhata & Chakdah (Part) Water Supply Scheme |
Retrofitting |
0.72 |
0.72 |
3 |
1,197 |
31/10/2023 |
| 2 |
NADIA |
TSM/020233 |
AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR ITLA(PHASE-II) IN KRISHNAGAR-I BLOCK OF NADIA DISTRICT UNDER NADIA DIVISION, PHE DTE. |
Augmentation |
1.36 |
1.36 |
2 |
0 |
04/05/2023 |
| 3 |
NADIA |
TSM/020318 |
AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR Teinpur zone II PWSS (PHASE-II) IN Karimpur II BLOCK OF NADIA DISTRICT UNDER NADIA DIVISION, PHE DTE. |
Augmentation |
0.33 |
0.33 |
4 |
0 |
23/02/2023 |
| 4 |
NADIA |
TSM/009355 |
EXTENSION OF INTAKE STRUCTURE UNDER SURFACE WATER BASED WATER SUPPLY SCHEME FOR ARSENIC AFFECTED AREAS OF NADIA DISTRICT (NORTHERN SECTOR) PART-II |
Augmentation |
20.40 |
20.40 |
99 |
0 |
08/05/2025 |
| 5 |
NADIA |
TSM/019946 |
AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR BADKULLA ZONE-I (PHASE-II) IN HANSKHALI BLOCK OF NADIA DISTRICT UNDER NADIA DIVISION, PHE DTE. |
Augmentation |
0.82 |
0.82 |
2 |
0 |
24/02/2023 |
| 6 |
NADIA |
TSM/019770 |
AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR BANPUR (PHASE-II) IN KRISHNAGANJ BLOCK OF NADIA DISTRICT UNDER NADIA DIVISION, PHE DTE. |
Augmentation |
1.23 |
1.23 |
5 |
0 |
05/10/2023 |
| 7 |
NADIA |
TSM/020321 |
AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR MADHUGARI PWSS (PHASE-III) IN Karimpur I BLOCK OF NADIA DISTRICT UNDER NADIA DIVISION, PHE DTE.
|
Augmentation |
0.59 |
0.59 |
3 |
0 |
23/02/2023 |
| 8 |
NADIA |
TSM/019625 |
Augmentation of Ground Water Based Piped Water Supply Scheme for Gobindapur Zone II Water Supply Scheme, Part-II under Jal Jeevan Mission(JJM) at Santipur Block, Nadia under Nadia Arsenic Division-I. P.H.E.Dte. |
Augmentation |
2.54 |
2.54 |
6 |
0 |
12/03/2024 |
| 9 |
NADIA |
TSM/019772 |
AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR GAZNA (PHASE-II) IN HANSKHALI BLOCK OF NADIA DISTRICT UNDER NADIA DIVISION, PHE DTE. |
Augmentation |
1.08 |
1.08 |
3 |
0 |
30/09/2024 |
| 10 |
NADIA |
TSM/019944 |
AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR HUDA CHAPRA (PHASE-II) IN HANSKHALI BLOCK OF NADIA DISTRICT UNDER NADIA DIVISION, PHE DTE. |
Augmentation |
0.70 |
0.70 |
4 |
0 |
24/02/2023 |
| 11 |
NADIA |
TSM/019502 |
Augmentation of Ground Water Based Piped Water Supply Scheme for Beharia Water Supply Scheme Part-IV under Jal Jeevan Mission (JJM) at Santipur Block, Nadia under Nadia Arsenic Division-I, P.H.E. Dte. |
Augmentation |
2.14 |
2.14 |
8 |
0 |
11/04/2025 |
| 12 |
NADIA |
TSM/019759 |
AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR FATEPUR (PHASE-II) IN HANSKHALI BLOCK OF NADIA DISTRICT UNDER NADIA DIVISION, PHE DTE. |
Augmentation |
1.05 |
1.05 |
5 |
0 |
05/10/2023 |
| 13 |
NADIA |
TSM/019760 |
AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR PURBA KHAMARSIMULIA (PHASE-II) IN HANSKHALI BLOCK OF NADIA DISTRICT UNDER NADIA DIVISION, PHE DTE. |
Augmentation |
1.15 |
1.15 |
8 |
0 |
05/10/2023 |
| 14 |
NADIA |
TSM/019752 |
AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR MONIPOTA (PHASE-II) IN KRISHNAGAR-I BLOCK OF NADIA DISTRICT UNDER NADIA DIVISION, PHE DTE. |
Augmentation |
1.03 |
1.03 |
6 |
0 |
05/10/2023 |
| 15 |
NADIA |
TSM/019736 |
AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR JOANIA (PHASE-II) IN KRISHNAGAR-I BLOCK OF NADIA DISTRICT UNDER NADIA DIVISION, PHE DTE. |
Augmentation |
1.58 |
1.58 |
6 |
0 |
05/10/2023 |
| 16 |
NADIA |
TSM/020083 |
AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR BADKULLA ZONE-II (PHASE-II) IN HANSKHALI BLOCK OF NADIA DISTRICT UNDER NADIA DIVISION, PHE DTE. |
Augmentation |
0.38 |
0.38 |
1 |
0 |
24/02/2023 |
| 17 |
NADIA |
TSM/020316 |
AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR Ber Ramchandrapur Zone II PWSS (PHASE-II) IN Karimpur I BLOCK OF NADIA DISTRICT UNDER NADIA DIVISION, PHE DTE.
|
Augmentation |
0.59 |
0.59 |
3 |
0 |
23/04/2025 |
| 18 |
NADIA |
TSM/020306 |
AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR Subarnabihar ZONE-I (PHASE-II) IN KRISHNAGAR-I BLOCK OF NADIA DISTRICT UNDER NADIA DIVISION, PHE DTE. |
Augmentation |
3.12 |
3.12 |
6 |
0 |
17/12/2024 |
| 19 |
NADIA |
TSM/020312 |
AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR Teinpur zone IV PWSS (PHASE-II) IN Karimpur II BLOCK OF NADIA DISTRICT UNDER NADIA DIVISION, PHE DTE.
|
Augmentation |
1.44 |
1.44 |
4 |
0 |
03/03/2023 |
| 20 |
NADIA |
TSM/020235 |
AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR PANSILA(PHASE-II) IN NABADWIP BLOCK OF NADIA DISTRICT UNDER NADIA DIVISION, PHE DTE. |
Augmentation |
1.66 |
1.66 |
4 |
0 |
04/05/2023 |
| 21 |
NADIA |
TSM/006305 |
Providing Functional House Tap Connection from Fatepur Water Supply Scheme under Jal Swapno Program in Nadia District |
Retrofitting |
1.00 |
1.00 |
4 |
1,587 |
21/03/2023 |
| 22 |
NADIA |
TSM/020088 |
AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR MADHPUR (PHASE-II) IN KARIMPUR-II BLOCK OF NADIA DISTRICT UNDER NADIA DIVISION, PHE DTE.
|
Augmentation |
0.42 |
0.42 |
5 |
0 |
04/03/2023 |
| 23 |
NADIA |
TSM/020308 |
AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR Senpur (PHASE-II) IN KRISHNAGAR-I BLOCK OF NADIA DISTRICT UNDER NADIA DIVISION, PHE DTE. |
Augmentation |
3.39 |
3.39 |
6 |
0 |
03/03/2023 |
| 24 |
NADIA |
TSM/006331 |
Providing FHTC at Surface Water Based Water Supply Scheme (Northern Sector), Part-I, Zone-I within Kaliganj Block (Phase-B). |
Retrofitting |
1.00 |
1.00 |
8 |
2,060 |
05/06/2023 |
| 25 |
NADIA |
TSM/008240 |
Retrofitting of Patharghata water supply scheme (Phase-II) under Tehatta-I Block by providing Functional House Tap Conection under Jal Sapno Mission in Nadia District, under Nadia Arsenic Civil Division-II, P.H.E. Dte |
Retrofitting |
2.53 |
2.53 |
1 |
6,112 |
22/07/2024 |
| 26 |
NADIA |
TSM/020087 |
AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR TOPLA (PHASE-II) IN KARIMPUR-II BLOCK OF NADIA DISTRICT UNDER NADIA DIVISION, PHE DTE.
|
Augmentation |
0.45 |
0.45 |
4 |
0 |
30/05/2023 |
| 27 |
NADIA |
TSM/019771 |
AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR DAKSHINPARA ZONE-II (PHASE-II) IN HANSKHALI BLOCK OF NADIA DISTRICT UNDER NADIA DIVISION, PHE DTE. |
Augmentation |
0.94 |
0.94 |
2 |
0 |
05/10/2023 |
| 28 |
NADIA |
TSM/019769 |
AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR DAKSHINPARA ZONE-I (PHASE-II) IN HANSKHALI BLOCK OF NADIA DISTRICT UNDER NADIA DIVISION, PHE DTE. |
Augmentation |
1.06 |
1.06 |
1 |
0 |
05/10/2023 |
| 29 |
NADIA |
TSM/020240 |
AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR GHORALIA ZONE-II (PHASE-II) IN SANTIPUR BLOCK OF NADIA DISTRICT UNDER NADIA DIVISION, PHE DTE. |
Augmentation |
1.69 |
1.69 |
1 |
0 |
03/03/2023 |
| 30 |
NADIA |
TSM/020315 |
AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR Teinpur zone I PWSS (PHASE-II) IN Karimpur II BLOCK OF NADIA DISTRICT UNDER NADIA DIVISION, PHE DTE. |
Augmentation |
1.67 |
1.67 |
2 |
0 |
24/01/2025 |
| 31 |
NADIA |
TSM/020310 |
AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR Muktadaha zone I (PHASE-II) IN Karimpur I BLOCK OF NADIA DISTRICT UNDER NADIA DIVISION, PHE DTE. |
Augmentation |
2.95 |
2.95 |
8 |
0 |
08/05/2025 |
| 32 |
NADIA |
TSM/020474 |
Providing Pumping Machinery and Electrical Equipment for GLR and Boosting Stations at Different OHR sites in Ranaghat-II Block in Connection with Integrated Surface Water Based PWSS For Ranaghat-I & Ranaghat-II, in the District of Nadia, P.H.E. Dte. |
Augmentation |
15.34 |
15.34 |
185 |
0 |
29/11/2023 |
| 33 |
NADIA |
TSM/019749 |
AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR KAMALPUR ZONE-II (PHASE-II) IN RANAGHAT - II BLOCK OF NADIA DISTRICT UNDER NADIA DIVISION, PHE DTE.
|
Augmentation |
0.99 |
0.99 |
3 |
0 |
01/03/2023 |
| 34 |
NADIA |
TSM/019741 |
AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR KAMALPUR ZONE-I (PHASE-II) IN RANAGHAT - II BLOCK OF NADIA DISTRICT UNDER NADIA DIVISION, PHE DTE. |
Augmentation |
2.98 |
2.98 |
9 |
0 |
04/05/2023 |
| 35 |
NADIA |
TSM/020304 |
AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR SONDA ZONE-I IN KRISHNAGAR BLOCK OF NADIA DISTRICT UNDER NADIA DIVISION, PHE DTE. |
Augmentation |
1.34 |
1.34 |
1 |
0 |
04/05/2023 |
| 36 |
NADIA |
TSM/020314 |
AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR Teinpur zone III PWSS (PHASE-II) IN Karimpur II BLOCK OF NADIA DISTRICT UNDER NADIA DIVISION, PHE DTE. |
Augmentation |
2.03 |
2.03 |
3 |
0 |
16/01/2025 |
| 37 |
NADIA |
TSM/020236 |
AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR DAKSHIN JHITKAPOTA ZONE-I (PHASE-II) IN KRISHNAGAR-I BLOCK OF NADIA DISTRICT UNDER NADIA DIVISION, PHE DTE. |
Augmentation |
2.37 |
2.37 |
4 |
0 |
27/09/2023 |
| 38 |
NADIA |
TSM/020234 |
AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR BHANDAR KHOLA (PHASE-II) IN KRISHNAGAR-I BLOCK OF NADIA DISTRICT UNDER NADIA DIVISION, PHE DTE. |
Augmentation |
1.38 |
1.38 |
3 |
0 |
04/05/2023 |
| 39 |
NADIA |
TSM/020238 |
AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR PASCHIM BHATJUNGLA ZONE-I (PHASE-II) IN KRISHNAGAR-I BLOCK OF NADIA DISTRICT UNDER NADIA DIVISION, PHE DTE. |
Augmentation |
2.61 |
2.61 |
3 |
0 |
03/03/2023 |
| 40 |
NADIA |
TSM/010351 |
AUGMENTATION OF GROUND WATER BASED TEINPUR (ZONE-I) PIPED WATER SUPPLY SCHEME TO ACCOMMODATE FHTC IN KARIMPUR-II BLOCK WITH IN NADIA DISTRICT UNDER NADIA DIVISION, PHE DTE |
Augmentation |
1.36 |
1.36 |
2 |
199 |
26/12/2023 |
| 41 |
NADIA |
TSM/006827 |
Providing FHTC (Functional Household Tap Connection) under Jaldhara / Jal Swapna for Zone-XIII, (Digha), Part-I at Haringhata Block by retrofitting of Surface Water based PWSS for Haringhata & Chakdah (Part) Water Supply Scheme |
Retrofitting |
0.92 |
0.92 |
1 |
1,729 |
03/01/2024 |
| 42 |
NADIA |
TSM/007114 |
Retrofitting of Krishnagar water supply scheme under Tehatta-II Block by providing Functional House Tap Conection under Jal Sapno Mission in Nadia District |
Retrofitting |
0.77 |
0.77 |
1 |
824 |
16/01/2024 |
| 43 |
NADIA |
TSM/019493 |
Augmentation of Ground Water Based Piped Water Supply Scheme for Nrisinghapur Water Supply Scheme Part-II under Jal Jeevan Mission (JJM) at Santipur block, Nadia under Nadia Arsenic Division-I, P.H.E. Dte. |
Augmentation |
2.44 |
2.44 |
8 |
0 |
22/11/2024 |
| 44 |
NADIA |
TSM/019753 |
AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR MAHISHNENGRA ZONE-I (PHASE-II) IN KRISHNAGAR-I BLOCK OF NADIA DISTRICT UNDER NADIA DIVISION, PHE DTE. |
Augmentation |
1.46 |
1.46 |
4 |
0 |
21/01/2025 |
| 45 |
NADIA |
TSM/020085 |
AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR BAGULA ZONE-II (PHASE-II) IN HANSKHALI BLOCK OF NADIA DISTRICT UNDER NADIA DIVISION, PHE DTE. |
Augmentation |
0.52 |
0.52 |
1 |
0 |
30/09/2024 |
| 46 |
NADIA |
TSM/019620 |
Augmentation of Ground Water Based Piped Water Supply Scheme for Gayeshpur Zone II Water Supply Scheme, Part-IV under Jal Jeevan Mission(JJM) at Santipur Block, Nadia under Nadia Arsenic Division-I. P.H.E.Dte. |
Augmentation |
1.94 |
1.94 |
1 |
0 |
15/03/2023 |
| 47 |
NADIA |
TSM/020232 |
AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR KULGACHHI (PHASE-II) IN KRISHNAGAR-I BLOCK OF NADIA DISTRICT UNDER NADIA DIVISION, PHE DTE. |
Augmentation |
1.29 |
1.29 |
4 |
0 |
04/03/2023 |
| 48 |
NADIA |
TSM/020239 |
AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR GHORALIA ZONE-I (PHASE-II) IN SANTIPUR BLOCK OF NADIA DISTRICT UNDER NADIA DIVISION, PHE DTE. |
Augmentation |
1.87 |
1.87 |
9 |
0 |
13/12/2023 |
| 49 |
NADIA |
TSM/020303 |
AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR BANKAR DHOPADI IN NABADWIP BLOCK OF NADIA DISTRICT UNDER NADIA DIVISION, PHE DTE.
|
Augmentation |
1.47 |
1.47 |
1 |
0 |
04/05/2023 |
| 50 |
NADIA |
TSM/020320 |
AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR Fazilnagar PWSS (PHASE-II) IN Karimpur II BLOCK OF NADIA DISTRICT UNDER NADIA DIVISION, PHE DTE. |
Augmentation |
2.18 |
2.18 |
4 |
0 |
04/12/2024 |
| 51 |
NADIA |
TSM/020084 |
AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR BAGULA ZONE-I (PHASE-II) IN HANSKHALI BLOCK OF NADIA DISTRICT UNDER NADIA DIVISION, PHE DTE. |
Augmentation |
0.76 |
0.76 |
1 |
0 |
24/02/2023 |
| 52 |
NADIA |
TSM/019497 |
Augmentation of Ground Water Based Water Supply Scheme for Boalia Water Supply Scheme Part-IV under Jal Jeevan Mission (JJM) at Santipur Block, Nadia under Nadia Arsenic Division-I, P.H.E. Dte. |
Augmentation |
2.43 |
2.43 |
8 |
0 |
15/03/2023 |
| 53 |
NADIA |
TSM/019501 |
Augmentation of Ground Water Based Piped Water Supply Scheme for Saguna Water Supply Scheme Part-IV under Jal Jeevan Mission (JJM) at Santipur Block, Nadia under Nadia Arsenic Division-I, P.H.E. Dte. |
Augmentation |
2.15 |
2.15 |
3 |
0 |
30/08/2024 |
| 54 |
NADIA |
TSM/019945 |
AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR PAIRADANGA (PHASE-II) IN HANSKHALI BLOCK OF NADIA DISTRICT UNDER NADIA DIVISION, PHE DTE. |
Augmentation |
0.98 |
0.98 |
2 |
0 |
24/02/2023 |
| 55 |
NADIA |
TSM/019943 |
AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR NUTANGRAM (PHASE-II) IN HANSKHALI BLOCK OF NADIA DISTRICT UNDER NADIA DIVISION, PHE DTE.
|
Augmentation |
0.41 |
0.41 |
2 |
0 |
24/02/2023 |
| 56 |
NADIA |
TSM/020086 |
AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR UDAYPUR (PHASE-II) IN SANTIPUR BLOCK OF NADIA DISTRICT UNDER NADIA DIVISION, PHE DTE. |
Augmentation |
0.76 |
0.76 |
2 |
0 |
24/02/2023 |
| 57 |
NADIA |
TSM/015630 |
AUGMENTATION OF INTAKE, WTP & RISING MAIN FOR SURFACE WATER-BASED PIPED WATER SUPPLY SCHEME FOR ARSENIC-AFFECTED AREAS NORTHERN SECTOR (PART II) OF NADIA DISTRICT TO ACCOMMODATE FHTC UNDER NADIA DIVISION
|
Augmentation |
84.80 |
84.80 |
103 |
0 |
08/05/2025 |