A3- Land Parcel Status

Clear
SL No District Scheme Name Scheme Category Block Village Location Purpose Type J.L. No. Khatian No. Plot No. Area
(in decimal)
Status Remarks
1 BIRBHUM Haridaspur Piped Water Supply Scheme.(TSM/016071,SM/14028) New Mohammad Bazar Haridaspur Haridaspur Pump House Vested 5 1 2204 8 Possessed DEMARCATION PENDING
2 BIRBHUM Retrofitting works for providing Functional Household Tap Connection (FHTC) within the command area of Narayanghati Phase-II Water Supply Scheme.(TSM/014645,SM/13371) Retrofitting Mayureswar - II Hatinagar OHR Donated 91 340 0 24 Possessed
3 BIRBHUM LAYEKPUR PIPED WATER SUPPLY SCHEME(TSM/016003,SM/18361) New Labpur Layekpur 23.88151, 87.777284 Pump House Vested 7 1 1427 4 Possessed (TW-2) Identified but demarcation of specific pin point site required.
4 BIRBHUM SHRICHANDRAPUR PIPED WATER SUPPLY SCHEME(TSM/015539,SM/13516) New Illambazar Shrichandrapur 23.6068, 87.6034 Pump House Vested 135 1 411 4 Possessed (TW-2) Identified but demarcation of specific pinpoint site required.
5 BIRBHUM Podda Piped Water Supply Scheme(TSM/015557,SM/13714) New Rampurhat - II Podda Pump House Vested 197 1 1213 6 Possessed
6 BIRBHUM Mahesha Piped water supply scheme of Mayureswar-II block in birbhum district(TSM/016204,SM/18510) New Mayureswar - II Daspalsa Pump House Vested 131 1 858 5 Possessed
7 BIRBHUM SHRICHANDRAPUR PIPED WATER SUPPLY SCHEME(TSM/015539,SM/13516) New Illambazar Shrichandrapur 23.609029, 87.607732 Pump House Donated 135 79 1088 3 Possessed (TW-1) Identified but demarcation of specific pinpoint site required.
8 BIRBHUM MADDA PIPED WATER SUPPLY SCHEME(TSM/016100,SM/15255) New Nanoor Madda 23.622412, 87.881428 Pump House Vested 108 1 550 4 Possessed (TW-2) Identified but demarcation of specific pinpoint site required.
9 BIRBHUM ANDHARGRAM PIPED WATER SUPPLY SCHEME.(TSM/011621,SM/12676) New Mohammad Bazar Sehara Sehara Pump House Private 108 77 190 8 Possessed Donor is ready to donate the land, NOC is in Process
10 BIRBHUM Dhalla Piped Water Supply Scheme(TSM/015726,SM/15256) New Rampurhat - II Dakshin Narayanpur Pump House Vested 206 1 2263 4 Possessed
11 BIRBHUM Asenga Piped Water Supply Scheme.(TSM/014568,SM/12680) New Mohammad Bazar Sugunpur Sugunpur Pump House Private 157 122 509 41 Possessed NOC received from Donor
12 BIRBHUM Dhalla Piped Water Supply Scheme(TSM/015726,SM/15256) New Rampurhat - II Dhalla OHR Vested 205 1 346 40 Possessed
13 BIRBHUM Albandha Piped Water Supply Scheme.(TSM/015177,SM/14533) New Bolpur Sriniketan Laldaha Nearby Laldaha Mukho Agnitala Pump House Vested 76 1 454 4 Possessed TW-2 Lat - 23.731831° Long - 87.724519°
14 BIRBHUM SHEKHAMPUR PIPED WATER SUPPLY SCHEME(TSM/017121,SM/14956) New Labpur Shekhampur 23.813988, 87.7779482 OHR Vested 84 1 2794 30 Possessed Identified but demarcation of specific pin point site required.
15 BIRBHUM Sultanpur Piped Water Supply Scheme Under Mayureswar -II Block Within Birbhum Division(TSM/015737,SM/14160) New Mayureswar - II Kushtikuri Kushtikuri Pump House Vested 178 1 0 3 Possessed
16 BIRBHUM RAYEN PIPED WATER SUPPLY SCHEME(TSM/017123,SM/14957) New Nanoor Rayen 23.68796, 87.82504 Pump House Donated 49 454 3330 4 Possessed (TW-2) Identified but demarcation of specific pinpoint site required.
17 BIRBHUM Satpalsa Piped Water Supply Scheme Under Mayureswar-II Block Within Birbhum Division(TSM/015731,SM/13982) New Mayureswar - II Sibdahara Sibdahara OHR Vested 194 1 0 24 Possessed
18 BIRBHUM Retrofitting works for providing functional household tap connection (FHTC) under Belera PWSS within Mayureswar-II Block District Birbhum under Birbhum Division, PHE Dte.(TSM/008514,SM/09371) Retrofitting Mayureswar - II Kuliara OHR Vested 222 1 584 16 Possessed
19 BIRBHUM KURUMBA PIPED WATER SUPPLY SCHEME(TSM/016231,SM/14743) New Labpur Kurumba 23.7570915, 87.7795841 OHR Vested 58 1 5765 30 Possessed Identified but demarcation of specific pin point site required.
20 BIRBHUM PAPURI PIPED WATER SUPPLY SCHEME(TSM/015547,SM/14691) New Nanoor Papuri 23.656282, 87.815106 Pump House Vested 52 1 2246 4 Possessed (TW-2) Identified but demarcation of specific pinpoint site required.
21 BIRBHUM Augmentation of Sub surface water based Narayanpur (Zone-I & II) piped water supply scheme under Birbhum Division, Rampurhat -I Block, district - Birbhum within Birbhum Division. PHE. Dte.(TSM/014955,SM/14744) Augmentation Rampurhat - I Balia Mrityunjoypur Pump House Vested 4 1 2 13 Possessed
22 BIRBHUM Kankalitala piped water supply scheme.(TSM/015186,SM/18518) New Bolpur Sriniketan Bagdaura Near Bagdaura Play Ground OHR Vested 87 1 621 33 Possessed OHR (Z-I) Lat - 23.73934° Long - 87.74900°
23 BIRBHUM Mostala Piped Water Supply Scheme.(TSM/015094,SM/18519) New Bolpur Sriniketan Bejra Near Bejra MSK (Bejra Play Ground) OHR Vested 168 1 1161 30 Possessed OHR (Z-I) Lat - 23.583686° Long - 87.822272°
24 BIRBHUM Retrofitting works for providing Functional Household Tap Connection (FHTC) within the command area of Basudebpur Phase-II Water Supply Scheme.(TSM/014573,SM/12662) Retrofitting Mayureswar - II Gopinathpur OHR Vested 127 1 0 26 Possessed
25 BIRBHUM Retrofitting works for providing Functional Household Tap Connection (FHTC) within the command area of Raypur Phase-II Water Supply Scheme(TSM/014565,SM/12663) Retrofitting Mohammad Bazar Deucha CWR Vested 67 1 539 156 Possessed Raypur PWSS Zone II
26 BIRBHUM Kankalitala piped water supply scheme.(TSM/015186,SM/18518) New Bolpur Sriniketan Bisheghata Near Bisheghata Play Ground Pump House Donated 88 47 165 4 Possessed TW-2 Lat - 23.743485° Long- 87.736827°
27 BIRBHUM Kankalitala piped water supply scheme.(TSM/015186,SM/18518) New Bolpur Sriniketan Bisheghata Near Bisheghata Play Ground Pump House Donated 88 47 165 4 Possessed TW-1 Lat - 23.743485° Long- 87.736827°
28 BIRBHUM Dakshin Gram Piped Water Supply Scheme under Mayureswar-I Block within Birbhum Division(TSM/015454,SM/18521) New Mayureswar - I Nandigram Nandigram Pump House Vested 152 1 0 54 Possessed
29 BIRBHUM GOALDIHI PIPED WATER SUPPLY SCHEME(TSM/016090,SM/15528) New Nanoor Goaldihi 23.63483, 87.904032 Pump House Vested 91 1 2554 3 Possessed (TW-1) Identified and verified.
30 BIRBHUM Budhigram Piped Water Supply Scheme(TSM/015741,SM/16762) New Rampurhat - II Budhigram OHR Vested 210 1 516 30 Possessed
31 BIRBHUM Salan Piped Water Supply Scheme.(TSM/015574,SM/14207) New Bolpur Sriniketan Salan OHR Donated 8 1476 1536 30 Possessed OHR Lat - 23.73224° Long - 87.60353°
32 BIRBHUM Retrofitting works for providing Functional Household Tap Connection (FHTC) under Puranagram (Phase-I)PWSS within Rampurhat-I Block, Dist.- Birbhum(TSM/007022,SM/08171) Retrofitting Mohammad Bazar Puranagram OHR Vested 147 1 6 45 Possessed
33 BIRBHUM Moubelia Piped Water Supply Scheme.(TSM/016241,SM/14899) New Mohammad Bazar Moubelia Moubelia Pump House Vested 7 1 1087 10 Possessed DEMARCATION & BLRO REPORT IS PENDING
34 BIRBHUM Moubelia Piped Water Supply Scheme.(TSM/016241,SM/14899) New Mohammad Bazar Moubelia Moubelia OHR Vested 7 1 759 40 Possessed Demarcation by BLRO is Complete
35 BIRBHUM KADOA PIPED WAYER SUPPLY SCHEME(TSM/017099,SM/14668) New Labpur Kadoa 23.770221, 87.8019992 Pump House Vested 81 1 924 4 Possessed (TW-2) Identified but demarcation of specific pin point site required.
36 BIRBHUM Retrofitting works for providing Functional Household Tap Connection (FHTC) within the command area of Jhikadda Phase-II Water Supply Scheme.(TSM/014656,SM/12667) Retrofitting Mayureswar - I Layekpur Pump House Vested 96 1 950 16 Possessed
37 BIRBHUM BALIARA PIPED WATER SUPPLY SCHEME(TSM/017430,SM/14847) New Nanoor Karea 23.730994, 87.885165 OHR Vested 19 1 716 30 Possessed Identified but demarcation of specific pinpoint site required.
38 BIRBHUM Augmentation of ground water based piped water supply scheme for Hazarpur (Zone-I & Zone-II), Block-Rampurhat-II, Dist- Birbhum within Birbhum Division PHE Dte.(TSM/015001,SM/14960) Augmentation Rampurhat - II Hazarpur Pump House Vested 93 1 262 3 Possessed Zone II
39 BIRBHUM SAJNOR PIPED WATER SUPPLY SCHEME(TSM/016227,SM/14678) New Nanoor Sajnor 23.64276, 87.932104 Pump House Vested 98 1 1033 3 Possessed (TW-1) Identified but demarcation of specific pinpoint site required.
40 BIRBHUM Retrofitting works for providing Functional Household Tap Connection (FHTC) within the command area of Beja Phase-II Water Supply Scheme.(TSM/014636,SM/12657) Retrofitting Mayureswar - II Teratari OHR Vested 201 1 129 3 Possessed
41 BIRBHUM BHETER PIPED WATER SUPPLY SCHEME(TSM/016086,SM/14848) New Nanoor Palita 23.635825, 87.876699 Pump House Vested 89 1 700 4 Possessed (TW-2) Identified but demarcation of specific pinpoint site required.
42 BIRBHUM Retrofitting works for providing Functional Household Tap Connection (FHTC) within the command area of Belera Phase-II Water Supply Scheme.(TSM/014631,SM/12660) Retrofitting Mayureswar - II Kuliara Pump House Donated 222 78 424 2 Possessed
43 BIRBHUM DHANASAHA PIPED WATER SUPPLY SCHEME(TSM/015498,SM/18352) New Illambazar Shrirampur 23.760525, 87.559905 Pump House Vested 21 1 1300 4 Possessed (TW-2) Identified but demarcation of specific pinpoint site required.
44 BIRBHUM Ruppur and adjoining mouzas Piped Water Supply Scheme.(TSM/015095,SM/14686) New Bolpur Sriniketan Paschim Islampur Pump House Vested 55 1 417 4 Possessed TW-2 Lat - 23.678901° Long - 87.62842°
45 BIRBHUM CHHATAR BANDI PIPED WATER SUPPLY SCHEME(TSM/015489,SM/18354) New Illambazar Hansra 23.71338, 87.548416 Pump House Vested 28 1 4391 4 Possessed (TW-2) Identified but demarcation of specific pinpoint site required.
46 BIRBHUM Sahapur Piped water Supply Scheme.(TSM/015328,SM/13649) New Rampurhat - II Popara Pump House Vested 121 1 317 5 Possessed
47 BIRBHUM RAMKRISHNAPUR PIPED WATER SUPPLY SCHEME(TSM/016099,SM/13950) New Nanoor Barasat 23.572533, 87.873191 OHR Donated 121 615 6 30 Possessed Identified but demarcation of specific pinpoint site required.
48 BIRBHUM PANCHPARA PIPED WATER SUPPLY SCHEME(TSM/016098,SM/13951) New Labpur Panchpara 23.863256, 87.8640289 Pump House Vested 144 1 1505 3 Possessed (TW-1) Identified but demarcation of specific pin point site required.
49 BIRBHUM KHAYERBANI PIPED WATER SUPPLY SCHEME(TSM/016217,SM/14677) New Labpur Khayerbani 23.744653, 87.80753 Pump House Vested 68 1 499 4 Possessed (TW-2) Identified but demarcation of specific pin point site required.
50 BIRBHUM KHAYERBANI PIPED WATER SUPPLY SCHEME(TSM/016217,SM/14677) New Labpur Khayerbani 23.744653, 87.80753 Pump House Vested 68 1 336 3 Possessed (TW-1) Identified but demarcation of specific pin point site required.
51 BIRBHUM HATKALUA PIPED WATER SUPPLY SCHEME(TSM/016242,SM/14115) New Labpur Hatkaluha 23.800833, 87.956279 Pump House Vested 182 1 81 3 Possessed (TW-1)
52 BIRBHUM Ruppur and adjoining mouzas Piped Water Supply Scheme.(TSM/015095,SM/14686) New Bolpur Sriniketan Chak Pali Pump House Vested 49 1 379 4 Possessed TW-4 Lat - Long -
53 BIRBHUM HATKALUA PIPED WATER SUPPLY SCHEME(TSM/016242,SM/14115) New Labpur Hatkaluha 23.800833, 87.956279 OHR Vested 182 1 81 30 Possessed
54 BIRBHUM CHUNPALASHI PIPED WATER SUPPLY SCHEME(TSM/015493,SM/13637) New Illambazar Chunpalashi 23.672628, 87.54297 OHR Vested 100 1 93 30 Possessed Identified but demarcation of specific pinpoint site required.
55 BIRBHUM Piped Water Supply Scheme for Khedamara Mouza (Paikpara Village) under Rampurhat -I Block within Birbhum District(TSM/009459,SM/14016) New Rampurhat - I Khedamara Pump House Vested 1 1 652 5 Possessed
56 BIRBHUM Retrofitting works for providing Functional Household Tap Connection (FHTC) within the command area of Jhikadda Phase-II Water Supply Scheme.(TSM/014656,SM/12667) Retrofitting Mayureswar - I Layekpur OHR Vested 96 1 573 40 Possessed
57 BIRBHUM Ruppur and adjoining mouzas Piped Water Supply Scheme.(TSM/015095,SM/14686) New Bolpur Sriniketan Paschim Islampur Nearby Paschim Ishlampur Samshan Pump House Donated 55 399 24 4 Possessed TW-1 Lat - Long -
58 BIRBHUM Ikshudhara piped water supply scheme.(TSM/015100,SM/13639) New Bolpur Sriniketan Ikshudhara Near Bhabanipur ICDS Centre OHR Vested 160 1 1589 30 Possessed OHR (ZONE-II) Lat - 23.607748° Long - 87.782639°
59 BIRBHUM Asuralay Piped Water Supply Scheme under mayureswar-I Block within Birbhum Division.(TSM/015465,SM/13376) New Mayureswar - I Diara Diara Pump House Vested 74 1 174 3 Possessed
60 BIRBHUM Sadanandapur piped water supply scheme.(TSM/015506,SM/13648) New Mohammad Bazar Sadanandapur Sadanandapur OHR Vested 60 1 3 40 Possessed DEMARCATION PENDING BY BLRO
61 BIRBHUM SANTOSHPUR PIPED WATER SUPPLY SCHEME(TSM/016256,SM/14895) New Nanoor Santoshpur 23.68164, 87.84091 OHR Vested 56 1 996 30 Possessed Identified but demarcation of specific pinpoint site required.
62 BIRBHUM GOPINATHPUR PIPED WATER SUPPLY SCHEME(TSM/016258,SM/14897) New Labpur Dhrubabati 23.791804, 87.917887 Pump House Donated 161 294 1459 4 Possessed (TW-2) Identified but demarcation of specific pin point site required.
63 BIRBHUM GOPINATHPUR PIPED WATER SUPPLY SCHEME(TSM/016258,SM/14897) New Labpur Jamna 23.790858, 87.9173 OHR Donated 162 46 1486 30 Possessed Identified but demarcation of specific pin point site required.
64 BIRBHUM Retrofitting works for providing Functional Household Tap Connection (FHTC) within the command area of Sekhpur Phase-II Water Supply Scheme.(TSM/014690,SM/13374) Retrofitting Mayureswar - I Sekhpur Pump House Donated 5 1 1012 2 Possessed
65 BIRBHUM Dhamara Piped Water Supply Scheme.(TSM/016240,SM/14898) New Mohammad Bazar Chak Raipur Chak Raipur OHR Vested 10 1 1446 40 Possessed Demarcation by BLRO is Completed
66 BIRBHUM Retrofitting works for providing Functional Household Tap Connection (FHTC) within the command area of Sekhpur Phase-II Water Supply Scheme.(TSM/014690,SM/13374) Retrofitting Mayureswar - I Sekhpur OHR Donated 5 243 3826 18 Possessed
67 BIRBHUM Ruppur and adjoining mouzas Piped Water Supply Scheme.(TSM/015095,SM/14686) New Bolpur Sriniketan Chak Pali Pump House Donated 49 34 382 4 Possessed TW-3 Lat - 23.678563° Long - 87.626905°
68 BIRBHUM Bidhyadharpur Piped Water Supply Scheme.(TSM/015556,SM/13708) New Bolpur Sriniketan Bidyadharpur Kasba Rd (Kopai River View Point) Near By Zone-IX CWR Site OHR Vested 34 1 171 30 Possessed OHR Lat - 23.713647° Long - 87.669024°
69 BIRBHUM Sonj Piped Water Supply Scheme under Mayureswar-I within Birbhum Division(TSM/015442,SM/13630) New Mayureswar - I Sonj Sonj Pump House Donated 66 1 3099 40 Possessed
70 BIRBHUM HANSAN PIPED WATER SUPPLY SCHEME(TSM/016218,SM/14900) New Rampurhat - II Hansan Pump House Vested 181 1 889 4 Possessed
71 BIRBHUM Ruppur and adjoining mouzas Piped Water Supply Scheme.(TSM/015095,SM/14686) New Bolpur Sriniketan Ballabhpur Near Khoyai Karma Tirtha Hat OHR Vested 63 1 3424 30 Possessed OHR (Z-II) Lat - 23.68300° Long - 87.657072°
72 BIRBHUM Augmentation of Labhpur PWSS, Illambazar PWSS, Joydev-kenduly PWSS, Tinoor PWSS, Kirnahar PWSS, Chandidas Nanoor PWSS ) under Birbhum Division(TSM/007454,SM/10320) Augmentation Nanoor Parota Pump House Donated 22 880 921 33 Possessed KIRNAHAR ZONE-II TW-2
73 BIRBHUM Beluti Piped Water Supply Scheme under Mayureswar-II Block within Birbhum Division(TSM/015494,SM/13634) New Mayureswar - II Nima Pump House Vested 109 1 0 8 Possessed
74 BIRBHUM Augmentation of Hatgacha PWSS, Mahammadbazar PWSS, Bishnupur PWSS, Mayureswar PWSS, Mollarpur (Zone I & Zone II) PWSS under Birbhum Division(TSM/007455,SM/10321) Augmentation Mayureswar - II Mayureswar Pump House Vested 138 1 1237 3 Possessed
75 BIRBHUM RAUTARA PIPED WATER SUPPLY SCHEME.(TSM/011622,SM/12888) New Mohammad Bazar Rautara Rautara Pump House Private 73 3359 906 8 Possessed NOC received from Donor
76 BIRBHUM Retrofitting works for providing Functional Household Tap Connection (FHTC) within the command area TARAPITH WATER SUPPLY SCHEME of RAMPURHAT-II Block under Birbhum Division, PHE Dte.(TSM/008210,SM/08898) Retrofitting Rampurhat - II Karkaria (Part) OHR Vested 60 1 647 61 Possessed
77 BIRBHUM Beluti Piped Water Supply Scheme under Mayureswar-II Block within Birbhum Division(TSM/015494,SM/13634) New Mayureswar - II Beluti OHR Vested 108 1 0 36 Possessed
78 BIRBHUM Augmentation of Hatgacha PWSS, Mahammadbazar PWSS, Bishnupur PWSS, Mayureswar PWSS, Mollarpur (Zone I & Zone II) PWSS under Birbhum Division(TSM/007455,SM/10321) Augmentation Mayureswar - II Mayureswar Pump House Vested 138 2950 2772 6 Possessed
79 BIRBHUM RAUTARA PIPED WATER SUPPLY SCHEME.(TSM/011622,SM/12888) New Mohammad Bazar Rautara Rautara OHR Vested 73 1 3051 40 Possessed Demarcation Done by GP
80 BIRBHUM PUNNA PIPED WATER SUPPLY SCHEME(TSM/016169,SM/14903) New Labpur Punna 23.84808, 87.777738 Pump House Donated 13 1488 1353 3 Possessed (TW-1) Identified but demarcation of specific pin point site required.
81 BIRBHUM Augmentation of Hatgacha PWSS, Mahammadbazar PWSS, Bishnupur PWSS, Mayureswar PWSS, Mollarpur (Zone I & Zone II) PWSS under Birbhum Division(TSM/007455,SM/10321) Augmentation Mayureswar - II Katasur Pump House Vested 102 1 34 3 Possessed
82 BIRBHUM DULA SAHAPUR PIPED WATER SUPPLY SCHEME(TSM/017017,SM/14746) New Labpur Dula Sahapur 23.78885553, 87.84997614 OHR Vested 105 1 308 30 Possessed Identified but demarcation of specific pin point site required.
83 BIRBHUM FARIDPUR PIPED WATER SUPPLY SCHEME(TSM/016785,SM/14971) New Labpur Faridpur 23.819860, 87.727736 OHR Vested 21 1 207 30 Possessed Identified but demarcation of specific pin point site required.
84 BIRBHUM RAGHABPUR PIPED WATER SUPPLY SCHEME(TSM/016570,SM/14747) New Labpur Dakshin Bamnigram 23.836024, 87.777409 OHR Vested 89 1 498 30 Possessed Identified but demarcation of specific pin point site required.
85 BIRBHUM Retrofitting works for providing Functional Household Tap Connection (FHTC) within the command area of Sekhpur Phase-II Water Supply Scheme.(TSM/014690,SM/13374) Retrofitting Mayureswar - I Sekhpur OHR Donated 5 150 3831 26 Possessed
86 BIRBHUM Sandhyajol Piped Water Supply Scheme(TSM/015736,SM/13981) New Rampurhat - II Sandhyajal OHR Vested 130 1 2149 28 Possessed
87 BIRBHUM Chhora Piped Water Supply Scheme.(TSM/016498,SM/16761) New Rampurhat - I Chakaipur OHR Vested 15 1 85 40 Possessed
88 BIRBHUM Retrofitting works for providing Functional Household Tap Connection (FHTC) within the command area of Tarapith Phase-II Water Supply Scheme.(TSM/014696,SM/13375) Retrofitting Rampurhat - II Karkaria (Part) OHR Vested 60 1 647 61 Possessed
89 BIRBHUM Tilai piped water supply scheme.(TSM/014575,SM/13127) New Rampurhat - I Tilai OHR Vested 103 1 285 40 Possessed
90 BIRBHUM ANDHARGRAM PIPED WATER SUPPLY SCHEME.(TSM/011621,SM/12676) New Mohammad Bazar Fullaipur Fullaipur Pump House Vested 106 1 1286 8 Possessed Confirmation from GP , BLRO demarcation pending
91 BIRBHUM ANDHARGRAM PIPED WATER SUPPLY SCHEME.(TSM/011621,SM/12676) New Mohammad Bazar Fullaipur Fullaipur OHR Vested 106 1 1307 40 Possessed Confirmation from GP & BLRO
92 BIRBHUM Khamedda Piped Water Supply Scheme(TSM/015742,SM/13980) New Rampurhat - II Gangedda Pump House Vested 213 1 400 3 Possessed
93 BIRBHUM Albandha Piped Water Supply Scheme.(TSM/015177,SM/14533) New Bolpur Sriniketan Laldaha Adityapur to Albandha Road (Barokahina more) Pump House Vested 76 1 18 4 Possessed TW-1 Lat - 23.732931° Long - 87.719964°
94 BIRBHUM Sultanpur Piped Water Supply Scheme Under Mayureswar -II Block Within Birbhum Division(TSM/015737,SM/14160) New Mayureswar - II Kanutia Kanutia Pump House Donated 176 1430 0 19 Possessed
95 BIRBHUM Albandha Piped Water Supply Scheme.(TSM/015177,SM/14533) New Bolpur Sriniketan Albandha Albandha to Ratanpur Rd (Srinidhupur ICDS center) OHR Donated 23 71 2224 33 Possessed OHR (ZONE-II) Lat - 23.747166° Long - 87.699083°
96 BIRBHUM ULANDI PIPED WATER SUPPLY SCHEME(TSM/015500,SM/13654) New Illambazar Kurmitha 23.735728, 87.521063 Pump House Vested 6 1 849 4 Possessed (TW-2) Identified but demarcation of specific pinpoint site required.
97 BIRBHUM Kayera Water Supply Scheme(TSM/015495,SM/13641) New Illambazar Kayera 23.685706, 87.542506 Pump House Vested 107 1 699 4 Possessed (TW-2) Identified but demarcation of specific pinpoint site required.
98 BIRBHUM Bidhyadharpur Piped Water Supply Scheme.(TSM/015556,SM/13708) New Bolpur Sriniketan Bidyadharpur Kasba Rd (Kopai River View Point) Near By Zone-IX CWR Site Pump House Vested 34 1 171 4 Possessed TW-1 Lat - 23.713647° Long - 87.669024°
99 BIRBHUM Augmentation of Sub surface water based Narayanpur (Zone-I & II) piped water supply scheme under Birbhum Division, Rampurhat -I Block, district - Birbhum within Birbhum Division. PHE. Dte.(TSM/014955,SM/14744) Augmentation Rampurhat - I Narayanpur OHR Vested 3 1 1382 6 Possessed
100 BIRBHUM Kendangal Piped Water Supply Scheme.(TSM/015607,SM/13642) New Bolpur Sriniketan Kendangal Beside Suri - Bolpur Rd (Near Sadbhab Mandap) OHR Vested 57 1 2082 30 Possessed OHR Lat - 23.691735° Long - 87.644871°
101 BIRBHUM MATIKONA PIPED WATER SUPPLY SCHEME(TSM/015501,SM/13643) New Illambazar Pratappur 23.66068, 87.569277 Pump House Donated 120 217 171 3 Possessed (TW-1) Identified but demarcation of specific pinpoint site required.
102 BIRBHUM Madhupur Water Supply Scheme(TSM/015317,SM/13644) New Rampurhat - II Purbba Gopalpur Pump House Vested 188 1 2573 4 Possessed
103 BIRBHUM Retrofitting works for providing functional household tap connection (FHTC) under Sekhpur PWSS within Mayureswar-I Block District Birbhum under Birbhum Division, PHE Dte.(TSM/008572,SM/09363) Retrofitting Mayureswar - I Sekhpur Pump House Donated 5 1 1012 2 Possessed
104 BIRBHUM NOHNA PIPED WATER SUPPLY SCHEME(TSM/015499,SM/13645) New Illambazar Paschim Narayanpur 23.607834, 87.492986 Pump House Vested 77 1 717 4 Possessed (TW-2) Identified but demarcation of specific pinpoint site required.
105 BIRBHUM Retrofitting works for providing functional household tap connection (FHTC) under Margram PWSS within Rampurhat-II Block District Birbhum under Birbhum Division, PHE Dte.(TSM/008520,SM/09367) Retrofitting Rampurhat - II Margram OHR Vested 138 1 9503 38 Possessed
106 BIRBHUM NOHNA PIPED WATER SUPPLY SCHEME(TSM/015499,SM/13645) New Illambazar Nohna 23.627499, 87.497916 OHR Donated 80 1085 1350 30 Possessed Identified but demarcation of specific pinpoint site required.
107 BIRBHUM Kasba Piped Water Supply Scheme.(TSM/015558,SM/13713) New Bolpur Sriniketan Kandarpapur Beside Kasba to Kopai Railways Rd (Near Kandarpapur Junior High School) OHR Vested 20 1 116 30 Possessed OHR Lat - 23.757744° Long - 87.666102°
108 BIRBHUM TATINAPARA PIPED WATER SUPPLY SCHEME(TSM/015894,SM/13979) New Labpur Tatinapara 23.785464, 87.752574 Pump House Vested 40 1 177 3 Possessed (TW-1) Identified but demarcation of specific pin point site required.
109 BIRBHUM Ninga Piped Water Supply Scheme(TSM/015711,SM/14089) New Rampurhat - II Ninga OHR Vested 174 1 1487 40 Possessed
110 BIRBHUM Retrofitting works for providing Functional Household Tap Connection (FHTC) within the command area of Raypur Phase-II Water Supply Scheme(TSM/014565,SM/12663) Retrofitting Mohammad Bazar Raypur OHR Vested 76 1 56 62 Possessed Raypur PWSS Zone I
111 BIRBHUM GOPINATHPUR PIPED WATER SUPPLY SCHEME(TSM/015544,SM/15253) New Illambazar Dharampur (P) 23.687722, 87.48619 Pump House Vested 46 1 1869 4 Possessed (TW-2) Identified but demarcation of specific pinpoint site required.
112 BIRBHUM BENAGRAM PIPED WATER SUPPLY SCHEME(TSM/015486,SM/13377) New Nanoor Banagram 23.632818, 87.858965 Pump House Vested 80 1 2461 3 Possessed (TW-1) Identified but demarcation of specific pinpoint site required.
113 BIRBHUM Chhamna Piped Water Supply Scheme under Mayureswar-II Block within Birbhum Division.(TSM/015479,SM/13710) New Mayureswar - II Harisara Harisara Pump House Donated 205 1 0 3 Possessed
114 BIRBHUM Augmentation of Labhpur PWSS, Illambazar PWSS, Joydev-kenduly PWSS, Tinoor PWSS, Kirnahar PWSS, Chandidas Nanoor PWSS ) under Birbhum Division(TSM/007454,SM/10320) Augmentation Nanoor Debagram Pump House Vested 15 1 2456 4 Possessed KIRNAHAR ZONE-I TW-2
115 BIRBHUM ANGORA PIPED WATER SUPPLY SCHEME(TSM/016091,SM/13971) New Nanoor Angora Near Sunil Ghosh poultry farm Pump House Vested 94 1 3 4 Possessed TW-2 Lat - 23.657728 Long - 87.904554
116 BIRBHUM Augmentation of Labhpur PWSS, Illambazar PWSS, Joydev-kenduly PWSS, Tinoor PWSS, Kirnahar PWSS, Chandidas Nanoor PWSS ) under Birbhum Division(TSM/007454,SM/10320) Augmentation Nanoor Debagram Pump House Vested 15 1 1544 4 Possessed KIRNAHAR ZONE-I TW-1
117 BIRBHUM MANIKPUR PIPED WATER SUPPLY SCHEME(TSM/016147,SM/18509) New Labpur Manikpur 23.8281493, 87.8784493 Pump House Vested 116 1 349 3 Possessed (TW-1) Identified but demarcation of specific pin point site required.
118 BIRBHUM BHUBANESWAR PIPED WATER SUPPLY SCHEME(TSM/015542,SM/13387) New Illambazar Santoshpur 23.627966, 87.457045 OHR Vested 69 1 931 40 Possessed Identified and verified.
119 BIRBHUM MANIKPUR PIPED WATER SUPPLY SCHEME(TSM/016147,SM/18509) New Labpur Manikpur 23.8281493, 87.8784493 OHR Vested 116 1 349 30 Possessed Identified but demarcation of specific pin point site required.
120 BIRBHUM BARA KARTIK CHUNGRI PIPED WATER SUPPLY SCHEME(TSM/016208,SM/18514) New Rampurhat - II Chhota Karttik Chungri OHR Vested 179 1 510 40 Possessed
121 BIRBHUM Birchandrapur Piped Water Supply Scheme under Mayureswar-I Block within Birbhum Division.(TSM/015354,SM/14141) New Mayureswar - I Kalisara KALISARA(PLOT NO:L.R. 246/622) OHR Vested 168 1 0 40 Possessed
122 BIRBHUM CHUNPALASHI PIPED WATER SUPPLY SCHEME(TSM/015493,SM/13637) New Illambazar Chunpalashi 23.67082, 87.545198 Pump House Vested 100 1 135 4 Possessed (TW-2) Identified but demarcation of specific pinpoint site required.
123 BIRBHUM Baraturi Gram Piped Water Supply Scheme under Mayureswar -I Block within Birbhum Division PHE Dte.(TSM/015347,SM/14424) New Mayureswar - I Baraturigram OHR Vested 169 3624 0 32 Possessed BLLRO Official Report received vide Memo No- 586/B.L&L.R.O/M'swar-I/2022 on 24/06/2022, IDT may be initiated for the JJM PROJECT
124 BIRBHUM Taloan Piped Water Supply Scheme under Mayureswar-I Block within Birbhum Division.(TSM/015342,SM/13653) New Mayureswar - I Taloan OHR Private 37 37 0 40 Possessed BLLRO Official Report received vide Memo No.- 587/B.L&L.R.O/M'swar-I/2022 on 24/06/2022, IDT may be initiated for the JJM PROJECT.
125 BIRBHUM Birchandrapur Piped Water Supply Scheme under Mayureswar-I Block within Birbhum Division.(TSM/015354,SM/14141) New Mayureswar - I Bhaddapur BHADDAPUR Pump House Vested 162 1 492 6 Possessed
126 BIRBHUM Kayera Water Supply Scheme(TSM/015495,SM/13641) New Illambazar Kayera 23.688449, 87.543594 Pump House Vested 107 1 908 3 Possessed (TW-1) Identified but demarcation of specific pinpoint site required.
127 BIRBHUM Bhabani Water Supply Scheme(TSM/015496,SM/18351) New Illambazar Bhabanipur 23.674976, 87.456782 Pump House Vested 83 1 285 4 Possessed (TW-2) Identified but demarcation of specific pinpoint site required.
128 BIRBHUM Lachhiator Piped Water Supply Scheme under Mayureswar-I Block within Birbhum Division.(TSM/015474,SM/14125) New Mayureswar - I Majharipara Majharipara OHR Vested 155 1 0 50 Possessed
129 BIRBHUM Bhabani Water Supply Scheme(TSM/015496,SM/18351) New Illambazar Bhabanipur 23.674428, 87.459462 Pump House Vested 83 1 214 3 Possessed (TW-1) Identified but demarcation of specific pinpoint site required.
130 BIRBHUM Daskalgram Piped Water Supply Scheme(TSM/015491,SM/18353) New Nanoor Daskalgram 23.751994, 87.944545 OHR Vested 10 1 10210 30 Possessed Identified and verified.
131 BIRBHUM SHEKHAMPUR PIPED WATER SUPPLY SCHEME(TSM/017121,SM/14956) New Labpur Shekhampur 23.813988, 87.7779482 Pump House Vested 84 1 2794 3 Possessed (TW-1) Identified but demarcation of specific pin point site required.
132 BIRBHUM Madhupur Water Supply Scheme(TSM/015317,SM/13644) New Rampurhat - II Purbba Gopalpur OHR Vested 188 1 859 17 Possessed
133 BIRBHUM PAPURI PIPED WATER SUPPLY SCHEME(TSM/015547,SM/14691) New Nanoor Papuri 23.658102, 87.810959 Pump House Vested 52 1 2296 3 Possessed (TW-1) Identified but demarcation of specific pinpoint site required.
134 BIRBHUM Kasba Piped Water Supply Scheme.(TSM/015558,SM/13713) New Bolpur Sriniketan Kandarpapur Beside Kasba to Kopai Railways Rd (Near Kandarpapur Junior High School) Pump House Vested 20 1 116 4 Possessed TW-1 Lat - 23.757744° Long - 87.666102°
135 BIRBHUM Banhat Piped Water Supply Scheme.(TSM/016070,SM/14029) New Rampurhat - I Banhat OHR Vested 84 1 1421 40 Possessed
136 BIRBHUM Daskalgram Piped Water Supply Scheme(TSM/015491,SM/18353) New Nanoor Daskalgram 23.751994, 87.944545 Pump House Vested 10 1 10210 3 Possessed (TW-1) Identified and verified.
137 BIRBHUM Podda Piped Water Supply Scheme(TSM/015557,SM/13714) New Rampurhat - II Podda OHR Vested 197 1 1002 13 Possessed
138 BIRBHUM RANIPARA PIPED WATER SUPPLY SCHEME(TSM/017183,SM/16276) New Labpur Ranipara 23.777587, 87.843514 Pump House Vested 106 1 313 3 Possessed (TW-1) Identified but demarcation of specific pin point site required.
139 BIRBHUM Daskalgram Piped Water Supply Scheme(TSM/015491,SM/18353) New Nanoor Daskalgram 23.751956, 87.949166 Pump House Vested 10 1 4836 4 Possessed (TW-2) Identified but demarcation of specific pinpoint site required.
140 BIRBHUM RANIPARA PIPED WATER SUPPLY SCHEME(TSM/017183,SM/16276) New Labpur Ranipara 23.777587, 87.843514 OHR Vested 106 1 313 30 Possessed Identified but demarcation of specified pin point site required.
141 BIRBHUM Kanksa piped water supply scheme under Mayureswar-I block within Birbhum Division(TSM/016201,SM/14119) New Mayureswar - I Kanksa OHR Private 13 1 796 40 Possessed For OHR ,1st T.W. & 1st pump House Site.
142 BIRBHUM CHHATAR BANDI PIPED WATER SUPPLY SCHEME(TSM/015489,SM/18354) New Illambazar Hansra 23.71303, 87.548983 OHR Vested 28 1 4446 30 Possessed Identified but demarcation of specific pinpoint site required.
143 BIRBHUM SANTOSHPUR PIPED WATER SUPPLY SCHEME(TSM/016256,SM/14895) New Nanoor Santoshpur 23.686522, 87.84285 Pump House Vested 56 1 1052 4 Possessed (TW-2) Identified but demarcation of specific pinpoint site required.
144 BIRBHUM LAYEKPUR PIPED WATER SUPPLY SCHEME(TSM/016003,SM/18361) New Labpur Layekpur 23.87935, 87.776705 Pump House Vested 7 1 1427 3 Possessed (TW-1) Identified but demarcation of specific pin point site required.
145 BIRBHUM Beluti Piped Water Supply Scheme under Mayureswar-II Block within Birbhum Division(TSM/015494,SM/13634) New Mayureswar - II Ghordaha Pump House Vested 110 1 0 3 Possessed
146 BIRBHUM SANTOSHPUR PIPED WATER SUPPLY SCHEME(TSM/016256,SM/14895) New Nanoor Santoshpur 23.68164, 87.84091 Pump House Vested 56 1 996 3 Possessed (TW-1) Identified but demarcation of specific pinpoint site required.
147 BIRBHUM Bergram Piped Water Supply Scheme.(TSM/015559,SM/13482) New Bolpur Sriniketan Bergram Beside Khiruli Rd Pump House Donated 10 2433 1163 3 Possessed TW-2 Lat - 23.728082° Long - 87.628432°
148 BIRBHUM GOPINATHPUR PIPED WATER SUPPLY SCHEME(TSM/016258,SM/14897) New Labpur Jamna 23.790858, 87.9173 Pump House Donated 162 46 1486 4 Possessed (TW-1) Identified but demarcation of specific pin point site required.
149 BIRBHUM Bergram Piped Water Supply Scheme.(TSM/015559,SM/13482) New Bolpur Sriniketan Bergram Near Bergram BCS. JR Basic School Pump House Donated 10 415 1129 4 Possessed TW-1 Lat - 23.731846° Long - 87.628542°
150 BIRBHUM Haridaspur Piped Water Supply Scheme.(TSM/016071,SM/14028) New Mohammad Bazar Haridaspur Haridaspur Pump House Private 5 576 781 8 Possessed Declaration from Donor received
151 BIRBHUM Bergram Piped Water Supply Scheme.(TSM/015559,SM/13482) New Bolpur Sriniketan Bergram Near Bergram BCS. JR Basic School OHR Donated 10 415 1129 33 Possessed OHR Lat - 23.731586° Long - 87.628125°
152 BIRBHUM Haridaspur Piped Water Supply Scheme.(TSM/016071,SM/14028) New Mohammad Bazar Haridaspur Haridaspur OHR Vested 5 1 234 40 Possessed DEMARCATION BY BLRO COMPLETED
153 BIRBHUM LAYEKPUR PIPED WATER SUPPLY SCHEME(TSM/016003,SM/18361) New Labpur Layekpur 23.87925, 87.77765 Pump House Vested 7 1 1446 4 Possessed (TW-3) Identified but demarcation of specific pin point site required.
154 BIRBHUM PUNNA PIPED WATER SUPPLY SCHEME(TSM/016169,SM/14903) New Labpur Punna 23.849502, 87.773524 Pump House Vested 13 1 708 4 Possessed (TW-2) Identified but demarcation of specific pin point site required.
155 BIRBHUM MASTALI PIPED WATER SUPPLY SCHEME(TSM/017207,SM/16275) New Labpur Mastali 23.807815, 87.805994 Pump House Vested 83 1 443 3 Possessed (TW-1) Identified but demarcation of specific pin point site required.
156 BIRBHUM Birchandrapur Piped Water Supply Scheme under Mayureswar-I Block within Birbhum Division.(TSM/015354,SM/14141) New Mayureswar - I Idrakpur IDRAKPUR Pump House Donated 163 359 612 4 Possessed
157 BIRBHUM LAYEKPUR PIPED WATER SUPPLY SCHEME(TSM/016003,SM/18361) New Labpur Layekpur 23.87935, 87.776705 OHR Vested 7 1 1427 30 Possessed Identified but demarcation of specific pin point site required.
158 BIRBHUM RANIBAZAR PIPED WATER SUPPLY SCHEME(TSM/017432,SM/14850) New Nanoor Ranibazar 23.549884, 87.903149 Pump House Vested 133 1 361 4 Possessed (TW-2) Identified but demarcation of specific pinpoint site required.
159 BIRBHUM RANIBAZAR PIPED WATER SUPPLY SCHEME(TSM/017432,SM/14850) New Nanoor Palitpur 23.556301, 87.912969 Pump House Vested 132 1 1079 3 Possessed (TW-1) Identified but demarcation of specific pinpoint site required.
160 BIRBHUM Retrofitting work for providing Functional Household Tap Connection(FHTC) within the Command area PURANAGRAM(PHASE-II) WATER SUPPLY SCHEME of MD Bazar Block under Birbhum Division, P.H.E. Dte.(TSM/014524,SM/12659) Retrofitting Mohammad Bazar Puranagram OHR Vested 147 1 6 45 Possessed
161 BIRBHUM RANIBAZAR PIPED WATER SUPPLY SCHEME(TSM/017432,SM/14850) New Nanoor Palitpur 23.556301, 87.912969 OHR Vested 132 1 1079 30 Possessed Identified but demarcation of specific pinpoint site required.
162 BIRBHUM Kankalitala piped water supply scheme.(TSM/015186,SM/18518) New Bolpur Sriniketan Padmabatipur Near Kapastikuri S.S.kankalimata Vidyapith OHR Donated 94 193 4 33 Possessed OHR (Z-II) Lat - Long -
163 BIRBHUM NAWADA PALANDI PIPED WATER SUPPLY SCHEME(TSM/016083,SM/14682) New Nanoor Thupsara 23.57997, 87.851105 Pump House Vested 114 1 1777 4 Possessed (TW-2) Identified but demarcation of specific pinpoint site required.
164 BIRBHUM Charicha Piped Water Supply Scheme.(TSM/016237,SM/18512) New Mohammad Bazar Karaia Nimdaspur Karaia Nimdaspur OHR Vested 89 1 1217 40 Possessed DEMARCATION IS PENDING
165 BIRBHUM Mostala Piped Water Supply Scheme.(TSM/015094,SM/18519) New Bolpur Sriniketan Jashra Near Jashra Football Ground Pump House Vested 164 1 5572 4 Possessed TW-5 Lat - 23.5826283° Long - 87.798583°
166 BIRBHUM Charicha Piped Water Supply Scheme.(TSM/016237,SM/18512) New Mohammad Bazar Char Ichharaghubarpur Char Ichharaghubarpur OHR Vested 100 1 267 40 Possessed DEMARCATION IS PENDING
167 BIRBHUM Mostala Piped Water Supply Scheme.(TSM/015094,SM/18519) New Bolpur Sriniketan Singi Near Singhee Lawer Danga Pump House Vested 163 1 5562 4 Possessed TW-2 Lat - 23.585755° Long - 87.806866°
168 BIRBHUM Kankalitala piped water supply scheme.(TSM/015186,SM/18518) New Bolpur Sriniketan Bisheghata Near Bisheghata Play Ground CWR Donated 88 47 165 4 Possessed CWR (Z-I) Lat - 23.743485° long - 87.736827°
169 BIRBHUM GOPINATHPUR PIPED WATER SUPPLY SCHEME(TSM/015544,SM/15253) New Illambazar Dharampur (P) 23.690907, 87.484207 OHR Vested 46 1 1802 30 Possessed Identified but demarcation of specific pinpoint site required.
170 BIRBHUM Kankalitala piped water supply scheme.(TSM/015186,SM/18518) New Bolpur Sriniketan Sangri Mahula Near Mohula Part Basic School Pump House Donated 79 260 346 3 Possessed TW-3 Lat - 23.745307° Long- 87.738201°
171 BIRBHUM Mostala Piped Water Supply Scheme.(TSM/015094,SM/18519) New Bolpur Sriniketan Jashra Near Jashra Rabindramukta Mancha Pump House Donated 164 18 1013 4 Possessed TW-4 Lat - 23.579183° Long - 87.798019°
172 BIRBHUM Retrofitting works for providing Functional Household Tap Connection (FHTC) within the command area of Kot Phase-II Water Supply Scheme.(TSM/014641,SM/12661) Retrofitting Mayureswar - I Purba Kalikapur OHR Vested 49 1 366 40 Possessed
173 BIRBHUM Purba Anantapur Piped Water Supply Scheme(TSM/015554,SM/13715) New Rampurhat - II Pabaipara OHR Vested 175 1 2 40 Possessed
174 BIRBHUM Dakshin Gram Piped Water Supply Scheme under Mayureswar-I Block within Birbhum Division(TSM/015454,SM/18521) New Mayureswar - I Ratma Ratma OHR Vested 46 1 0 32 Possessed
175 BIRBHUM Bidhyadharpur Piped Water Supply Scheme.(TSM/015556,SM/13708) New Bolpur Sriniketan Bidyadharpur Bidyadharpur Health Centre (Hool Mancha) Pump House Vested 34 1 542 4 Possessed TW-2 Lat - 23.713378° Long - 87.66915°
176 BIRBHUM Albandha Piped Water Supply Scheme.(TSM/015177,SM/14533) New Bolpur Sriniketan Sarbbanandapur OHR Vested 31 1 1058 30 Possessed OHR (ZONE-I) Lat - Long -
177 BIRBHUM Augmentation of Ground water Based piped water supply scheme for Dunigram (Zone-I & II), Block- Rampurhat-II, Dist- Birbhum, Within Birbhum Division, PHE Dte.(TSM/015009,SM/15236) Augmentation Rampurhat - II Chandpara OHR Private 184 58 1077 31 Possessed
178 BIRBHUM Retrofitting works for providing functional household tap connection (FHTC) under Sekhpur PWSS within Mayureswar-I Block District Birbhum under Birbhum Division, PHE Dte.(TSM/008572,SM/09363) Retrofitting Mayureswar - I Sekhpur OHR Donated 5 243 3826 18 Possessed
179 BIRBHUM Sonj Piped Water Supply Scheme under Mayureswar-I within Birbhum Division(TSM/015442,SM/13630) New Mayureswar - I Gazipur Gazipur OHR Vested 68 1 0 40 Possessed
180 BIRBHUM Retrofitting works for providing Functional Household Tap Connection (FHTC) under Dunigram PWSS (Phase-III) (TSM/006722,SM/07647) Retrofitting Rampurhat - II Chandpara OHR Private 184 58 1077 31 Possessed
181 BIRBHUM MASTALI PIPED WATER SUPPLY SCHEME(TSM/017207,SM/16275) New Labpur Mastali 23.815397, 87.790321 Pump House Donated 83 557 157 4 Possessed (TW-2) Identified but demarcation of specific pin point site required.
182 BIRBHUM BENGA CHATRA PIPED WATER SUPPLY SCHEME(TSM/015476,SM/13408) New Nanoor Kuramba Ghosh 23.614735, 87.832855 Pump House Vested 82 1 1350 3 Possessed (TW-1) Identified but demarcation of specific pinpoint site required.
183 BIRBHUM Salan Piped Water Supply Scheme.(TSM/015574,SM/14207) New Bolpur Sriniketan Salan Pump House Vested 8 1 1453 4 Possessed TW-2 Lat - 23.7331° Long - 87.60792°
184 BIRBHUM Retrofitting works for providing functional household tap connection (FHTC) under Jhikadda PWSS within Mayureswar-I Block District Birbhum under Birbhum Division, PHE Dte.(TSM/008519,SM/09368) Retrofitting Mayureswar - I Layekpur OHR Vested 96 1 573 40 Possessed
185 BIRBHUM Salan Piped Water Supply Scheme.(TSM/015574,SM/14207) New Bolpur Sriniketan Salan Pump House Donated 8 1476 1536 4 Possessed TW-1 Lat - 23.73224° Long - 87.60353°
186 BIRBHUM Charkalgram Piped Water Supply Scheme(TSM/015455,SM/13481) New Nanoor Pilkhundi 23.658508, 87.874718 Pump House Vested 77 1 171 3 Possessed (TW-1) Identified but demarcation of specific pinpoint site required.
187 BIRBHUM Chhamna Piped Water Supply Scheme under Mayureswar-II Block within Birbhum Division.(TSM/015479,SM/13710) New Mayureswar - II Kaleswar Kaleswar Pump House Vested 207 1 0 3 Possessed
188 BIRBHUM RAYEN PIPED WATER SUPPLY SCHEME(TSM/017123,SM/14957) New Nanoor Rayen 23.688017, 87.823338 Pump House Donated 49 498 51 3 Possessed (TW-1) Identified but demarcation of specific pinpoint site required.
189 BIRBHUM Chhamna Piped Water Supply Scheme under Mayureswar-II Block within Birbhum Division.(TSM/015479,SM/13710) New Mayureswar - II Chhamna Chhamna OHR Vested 182 1 0 13 Possessed
190 BIRBHUM BHATRA PIPED WATER SUPPLY SCHEME(TSM/017151,SM/14958) New Labpur Bhatra 23.830604, 87.908672 Pump House Donated 168 340 593 4 Possessed (TW-1) Identified but demarcation of specific pin point site required.
191 BIRBHUM GOPINATHPUR PIPED WATER SUPPLY SCHEME(TSM/015544,SM/15253) New Illambazar Dharampur (P) 23.690907, 87.484207 Pump House Vested 46 1 1802 3 Possessed (TW-1) Identified but demarcation of specific pinpoint site required.
192 BIRBHUM Retrofitting works for providing functional household tap connection (FHTC) under Jhikadda PWSS within Mayureswar-I Block District Birbhum under Birbhum Division, PHE Dte.(TSM/008519,SM/09368) Retrofitting Mayureswar - I Layekpur Pump House Vested 96 1 950 16 Possessed
193 BIRBHUM TATINAPARA PIPED WATER SUPPLY SCHEME(TSM/015894,SM/13979) New Labpur Tatinapara 23.785464, 87.752574 OHR Vested 40 1 177 30 Possessed Identified but demarcation of specific pin point site required.
194 BIRBHUM GOALDIHI PIPED WATER SUPPLY SCHEME(TSM/016090,SM/15528) New Nanoor Goaldihi 23.63483, 87.904032 OHR Vested 91 1 2554 30 Possessed Identified and verified.
195 BIRBHUM BRAHMANKHANDA PIPED WATER SUPPLY SCHEME(TSM/015460,SM/14534) New Nanoor Brahmankhanda 23.590189, 87.884317 Pump House Vested 125 1 1786 4 Possessed (TW-2) Identified but demarcation of specific pinpoint site required.
196 BIRBHUM MAHESWARPUR PIPED WATER SUPPLY SCHEME(TSM/015545,SM/15254) New Illambazar Maheswarpur 23.70252, 87.55055 Pump House Vested 33 1 706 4 Possessed (TW-2) Identified but demarcation of specific pinpoint site required.
197 BIRBHUM FEUGRAM PIPED WATER SUPPLY SCHEME(TSM/015471,SM/13477) New Nanoor Madhpur 23.763497, 87.84188 Pump House Vested 31 1 170 4 Possessed (TW-2) Identified but demarcation of specific pinpoint site required.
198 BIRBHUM BHEJENA PIPED WATER SUPPLY SCHEME.(TSM/011620,SM/12833) New Mohammad Bazar Bhejena Bhejena OHR Private 118 447 369 40 Possessed Demarcation Done by GP, NOC received from Donor
199 BIRBHUM MAHESWARPUR PIPED WATER SUPPLY SCHEME(TSM/015545,SM/15254) New Illambazar Maheswarpur 23.706941, 87.556438 Pump House Vested 33 1 722 3 Possessed (TW-1) Identified but demarcation of specific pinpoint site required.
200 BIRBHUM Retrofitting works for providing functional household tap connection (FHTC) under Margram PWSS within Rampurhat-II Block District Birbhum under Birbhum Division, PHE Dte.(TSM/008520,SM/09367) Retrofitting Rampurhat - II Margram Pump House Vested 138 1 4001 5 Possessed
201 BIRBHUM MADDA PIPED WATER SUPPLY SCHEME(TSM/016100,SM/15255) New Nanoor Madda 23.622412, 87.881428 Pump House Vested 108 1 550 3 Possessed (TW-1) Identified but demarcation of specific pinpoint site required.
202 BIRBHUM RAYEN PIPED WATER SUPPLY SCHEME(TSM/017123,SM/14957) New Nanoor Rayen 23.688017, 87.823338 OHR Donated 49 498 51 30 Possessed Identified but demarcation of specific pinpoint site required.
203 BIRBHUM Ikshudhara piped water supply scheme.(TSM/015100,SM/13639) New Bolpur Sriniketan Mahadebpur Pump House Donated 157 252 163 4 Possessed TW-5 Lat - 23.586875° Long - 87.782185°
204 BIRBHUM Baraturi Gram Piped Water Supply Scheme under Mayureswar -I Block within Birbhum Division PHE Dte.(TSM/015347,SM/14424) New Mayureswar - I Sanakpur Pump House Private 172 631 0 27 Possessed BLLRO Official Report received vide Memo No- 788/B.L&L.R.O/M'swar-I/2022 on 10/08/2022, IDT may be initiated for the JJM PROJECT
205 BIRBHUM Ikshudhara piped water supply scheme.(TSM/015100,SM/13639) New Bolpur Sriniketan Baradiha Beside Baradiha - Mahadevpur Rd Pump House Vested 158 1 2729 4 Possessed TW-1 Lat - 23.588501° Long - 87.785468°
206 BIRBHUM Dhamara Piped Water Supply Scheme.(TSM/016240,SM/14898) New Mohammad Bazar Chak Raipur Chak Raipur Pump House Vested 10 1 641 8 Possessed DEMARCATION & BLRO REPORT IS PENDING
207 BIRBHUM Nabagram Piped Water Supply Scheme.(TSM/015339,SM/13646) New Rampurhat - II Ranapur OHR Vested 117 1 59 9 Possessed
208 BIRBHUM HANSAN PIPED WATER SUPPLY SCHEME(TSM/016218,SM/14900) New Rampurhat - II Hansan OHR Private 181 1700 312 34 Possessed
209 BIRBHUM ANGORA PIPED WATER SUPPLY SCHEME(TSM/016091,SM/13971) New Nanoor Angora Near Angora Pry. School OHR Vested 94 1 615 24 Possessed OHR Lat - 23.65707 Long - 87.906383
210 BIRBHUM THIBA PIPEED WATER SUPPLY SCHEME(TSM/017115,SM/14968) New Labpur Thiba 23.820144, 87.893048 Pump House Vested 150 1 185 3 Possessed (TW-1) Identified but demarcation of specific pin point site required.
211 BIRBHUM SHEKHAMPUR PIPED WATER SUPPLY SCHEME(TSM/017121,SM/14956) New Labpur Shekhampur 23.818898, 87.7752571 Pump House Vested 84 1 4006 4 Possessed (TW-2) Identified but demarcation of specific pin point site required.
212 BIRBHUM BHATRA PIPED WATER SUPPLY SCHEME(TSM/017151,SM/14958) New Labpur Bhatra 23.830604, 87.908672 OHR Donated 168 340 593 30 Possessed Identified but demarcation of specific pin point site required.
213 BIRBHUM PARKUTA PIPED WATER SUPPLY SCHEME(TSM/017348,SM/14959) New Rampurhat - II Parkuta OHR Private 139 1180 600 18 Possessed Physically Verified (For OHR ,1st T.W. & 1st pump House Site)
214 BIRBHUM Augmentation of ground water based piped water supply scheme for Hazarpur (Zone-I & Zone-II), Block-Rampurhat-II, Dist- Birbhum within Birbhum Division PHE Dte.(TSM/015001,SM/14960) Augmentation Rampurhat - II Hazarpur OHR Private 93 1603 1409 40 Possessed Zone II
215 BIRBHUM PUNNA PIPED WATER SUPPLY SCHEME(TSM/016169,SM/14903) New Labpur Punna 23.84808, 87.777738 OHR Donated 13 1488 1353 30 Possessed Identified but demarcation of specific pin point site required.
216 BIRBHUM PAPURI PIPED WATER SUPPLY SCHEME(TSM/015547,SM/14691) New Nanoor Papuri 23.658102, 87.810959 OHR Vested 52 1 2296 30 Possessed Identified but demarcation of specific pinpoint site required.
217 BIRBHUM Kanduri Piped Water Supply Scheme.(TSM/016079,SM/14824) New Rampurhat - I Kanduri OHR Vested 22 1 645 60 Possessed
218 BIRBHUM BHEPUR PIPED WATER SUPPLY SCHEME(TSM/015433,SM/13759) New Nanoor Srikrishnapur 23.598523, 87.937403 OHR Vested 135 1 260 30 Possessed Identified but demarcation of specific pin point site required.
219 BIRBHUM BHEPUR PIPED WATER SUPPLY SCHEME(TSM/015433,SM/13759) New Nanoor Srikrishnapur 23.603932, 87.936168 Pump House Vested 135 1 225 4 Possessed (TW-2) Identified but demarcation of specific pin point site required.
220 BIRBHUM FARIDPUR PIPED WATER SUPPLY SCHEME(TSM/016785,SM/14971) New Labpur Faridpur 23.821280, 87.724507 Pump House Vested 21 1 242 4 Possessed (TW-2) Identified but demarcation of specific pin point site required.
221 BIRBHUM Kashtagara Piped Water Supply Scheme.(TSM/016499,SM/18733) New Rampurhat - I Saonsa OHR Donated 47 835 625 34 Possessed Land for Kashtagara Zone-II
222 BIRBHUM Bhagabatipur Piped Water Supply Scheme under Mayureswar-I Block within Birbhum Division.(TSM/015470,SM/13475) New Mayureswar - I Pakhuria Pakhuria OHR Donated 174 220 449 19 Possessed
223 BIRBHUM Srikantapur piped water supply scheme.(TSM/015507,SM/13652) New Mohammad Bazar Kukaradihi Kukaradihi Pump House Vested 61 1 771 8 Possessed Land for 2nd site is already Provided by BLRO at Lanalbanga, it is 4 km away from OHR site & land is occupied by Kabarsthan, so 2nd land identified at Kukradihi
224 BIRBHUM Augmentation of Labhpur PWSS, Illambazar PWSS, Joydev-kenduly PWSS, Tinoor PWSS, Kirnahar PWSS, Chandidas Nanoor PWSS ) under Birbhum Division(TSM/007454,SM/10320) Augmentation Nanoor Parota Pump House Donated 22 2350 723 11 Possessed KIRNAHAR ZONE-II TW-1
225 BIRBHUM Bhagabatipur Piped Water Supply Scheme under Mayureswar-I Block within Birbhum Division.(TSM/015470,SM/13475) New Mayureswar - I Pakhuria Pakhuria Pump House Donated 174 220 406 11 Possessed
226 BIRBHUM KURUMBA PIPED WATER SUPPLY SCHEME(TSM/016231,SM/14743) New Labpur Kurumba 23.7570915, 87.7795841 Pump House Vested 58 1 5765 3 Possessed (TW-1) Identified but demarcation of specific pin point site required.
227 BIRBHUM RAUTGARA PIPED WATER SUPPLY SCHEME OF MAYURESWAR-I BLOCK UNDER BIRBHUM DISTRICT(TSM/016708,SM/14894) New Mayureswar - I Rautgara Rautgara Pump House Donated 7 208 0 39 Possessed
228 BIRBHUM Asuralay Piped Water Supply Scheme under mayureswar-I Block within Birbhum Division.(TSM/015465,SM/13376) New Mayureswar - I Diara Diara OHR Vested 74 1 0 28 Possessed
229 BIRBHUM Chhamna Piped Water Supply Scheme under Mayureswar-II Block within Birbhum Division.(TSM/015479,SM/13710) New Mayureswar - II Tentuldihi Tentuldihi Pump House Vested 183 1 939 3 Possessed
230 BIRBHUM THIBA PIPEED WATER SUPPLY SCHEME(TSM/017115,SM/14968) New Labpur Thiba 23.8204, 87.893087 OHR Vested 150 1 185 4 Possessed (TW-2) Identified but demarcation of specific pin point site required.
231 BIRBHUM Gaytha Piped Water Supply Scheme(TSM/015546,SM/13712) New Rampurhat - II Bonta OHR Vested 168 787 245 40 Possessed Irrigation Land
232 BIRBHUM Birchandrapur Piped Water Supply Scheme under Mayureswar-I Block within Birbhum Division.(TSM/015354,SM/14141) New Mayureswar - I Hazipur HAZIPUR Pump House Donated 170 1574 0 35 Possessed
233 BIRBHUM Monoharpur Piped Water Supply Scheme.(TSM/015578,SM/13511) New Bolpur Sriniketan Monoharpur Pump House Vested 48 1 2280 4 Possessed TW-1 Lat - 23.68637° Long - 87.621467°
234 BIRBHUM DHANASAHA PIPED WATER SUPPLY SCHEME(TSM/015498,SM/18352) New Illambazar Shrirampur 23.766276, 87.562347 Pump House Vested 21 1 346 3 Possessed (TW-1) Identified and verified.
235 BIRBHUM Bajitpur Piped Water Supply Scheme under mayureswar-I Block within Birbhum Division.(TSM/015724,SM/13983) New Mayureswar - I Bajitpur Bajitpur Pump House Vested 8 1 1635 40 Possessed
236 BIRBHUM Ikshudhara piped water supply scheme.(TSM/015100,SM/13639) New Bolpur Sriniketan Baradiha Infront of Baradiha Football Ground Pump House Vested 158 1 2202 4 Possessed TW-3 Lat - 23.58917° Long - 87.787695°
237 BIRBHUM NOHNA PIPED WATER SUPPLY SCHEME(TSM/015499,SM/13645) New Illambazar Nohna 23.627499, 87.497916 Pump House Donated 80 1085 1350 3 Possessed (TW-1) Identified but demarcation of specific pinpoint site required.
238 BIRBHUM Monoharpur Piped Water Supply Scheme.(TSM/015578,SM/13511) New Bolpur Sriniketan Monoharpur Pump House Vested 48 1 451 4 Possessed TW-2 Lat - 23.6858° Long - 87.616554°
239 BIRBHUM SHIRSHA PIPED WATER SUPPLY SCHEME(TSM/015543,SM/13647) New Illambazar Shirsha 23.684364, 87.419849 Pump House Vested 56 1 160 4 Possessed (TW-3) Identified but demarcation of specific pinpoint site required.
240 BIRBHUM Mahesha Piped water supply scheme of Mayureswar-II block in birbhum district(TSM/016204,SM/18510) New Mayureswar - II Mahesha Pump House Vested 132 1 0 3 Possessed
241 BIRBHUM SHIRSHA PIPED WATER SUPPLY SCHEME(TSM/015543,SM/13647) New Illambazar Shirsha 23.68317, 87.420805 Pump House Vested 56 1 168 3 Possessed (TW-1) Identified but demarcation of specific pinpoint site required.
242 BIRBHUM Mahesha Piped water supply scheme of Mayureswar-II block in birbhum district(TSM/016204,SM/18510) New Mayureswar - II Daspalsa OHR Vested 131 1 769 30 Possessed
243 BIRBHUM Kayera Water Supply Scheme(TSM/015495,SM/13641) New Illambazar Kayera 23.688449, 87.543594 OHR Vested 107 1 908 30 Possessed Identified but demarcation of specific pinpoint site required.
244 BIRBHUM SHIRSHA PIPED WATER SUPPLY SCHEME(TSM/015543,SM/13647) New Illambazar Shirsha 23.68317, 87.420805 OHR Vested 56 1 168 30 Possessed Identified but demarcation of specific pinpoint site required.
245 BIRBHUM Ikshudhara piped water supply scheme.(TSM/015100,SM/13639) New Bolpur Sriniketan Mahadebpur Infront of Mahadevpur Junior Basic Primary School Pump House Donated 157 221 350 4 Possessed TW-4 Lat - 23.586175° Long - 87.78409°
246 BIRBHUM Kendangal Piped Water Supply Scheme.(TSM/015607,SM/13642) New Bolpur Sriniketan Kendangal Beside Suri - Bolpur Rd (Near Sadbhab Mandap) Pump House Vested 57 1 2082 4 Possessed TW-1 Lat - 23.691735° Long - 87.644871°
247 BIRBHUM Ikshudhara piped water supply scheme.(TSM/015100,SM/13639) New Bolpur Sriniketan Baradiha Near Baradiha Football Ground Pump House Vested 158 1 2171 4 Possessed TW-2 Lat - 23.587747° Long - 87.78777°
248 BIRBHUM DULA SAHAPUR PIPED WATER SUPPLY SCHEME(TSM/017017,SM/14746) New Labpur Dula Sahapur 23.78885553, 87.84997614 Pump House Vested 105 1 308 4 Possessed (TW-2) Identified but demarcation of specific pin point site required.
249 BIRBHUM Madhupur Water Supply Scheme(TSM/015317,SM/13644) New Rampurhat - II Purbba Gopalpur Pump House Private 188 3391 853 5 Possessed
250 BIRBHUM BRAHMANKHANDA PIPED WATER SUPPLY SCHEME(TSM/015460,SM/14534) New Nanoor Brahmankhanda 23.593738, 87.885258 Pump House Vested 125 1 271 3 Possessed (TW-1) Identified but demarcation of specific pinpoint site required.
251 BIRBHUM Ikshudhara piped water supply scheme.(TSM/015100,SM/13639) New Bolpur Sriniketan Baradiha Beside Baradiha - Mahadevpur Rd CWR Vested 158 1 2729 4 Possessed CWR (Z-I) Lat - 23.58849167° Long - 87.78541389°
252 BIRBHUM DULA SAHAPUR PIPED WATER SUPPLY SCHEME(TSM/017017,SM/14746) New Labpur Dula Sahapur 23.78885553, 87.84997614 Pump House Vested 105 1 308 4 Possessed (TW-1) Identified but demarcation of specific pin point site required.
253 BIRBHUM Nabagram Piped Water Supply Scheme.(TSM/015339,SM/13646) New Rampurhat - II Ranapur Pump House Vested 117 1 581 11 Possessed
254 BIRBHUM Ikshudhara piped water supply scheme.(TSM/015100,SM/13639) New Bolpur Sriniketan Baradiha Beside Baradiha - Mahadevpur Rd OHR Vested 158 1 2729 30 Possessed OHR (ZONE-I) Lat - 23.58849167° Long - 87.78541389°
255 BIRBHUM KHAGRA PIPED WATER SUPPLY SCHEME OF MAYURESWAR-II BLOCK UNDER BIRBHUM DISTRICT(TSM/016205,SM/14676) New Mayureswar - II Naogaon OHR Donated 232 229 0 40 Possessed School Land
256 BIRBHUM Kasba Piped Water Supply Scheme.(TSM/015558,SM/13713) New Bolpur Sriniketan Kandarpapur Beside Kasba to Kopai Railways Rd (Near Kandarpapur Junior High School) Pump House Vested 20 1 390 4 Possessed TW-2 Lat - 23.757702° Long - 87.670138°
257 BIRBHUM KHAYERBANI PIPED WATER SUPPLY SCHEME(TSM/016217,SM/14677) New Labpur Khayerbani 23.744653, 87.80753 OHR Vested 68 1 336 30 Possessed Identified but demarcation of specific pin point site required.
258 BIRBHUM Khamedda Piped Water Supply Scheme(TSM/015742,SM/13980) New Rampurhat - II Gangedda OHR Private 213 264 330 30 Possessed
259 BIRBHUM MATIKONA PIPED WATER SUPPLY SCHEME(TSM/015501,SM/13643) New Illambazar Harishpur 23.661388, 87.567401 Pump House Vested 116 1 461 4 Possessed (TW-2) Identified but demarcation of specific pinpoint site required.
260 BIRBHUM SAJNOR PIPED WATER SUPPLY SCHEME(TSM/016227,SM/14678) New Nanoor Sajnor 23.64276, 87.932104 OHR Vested 98 1 1033 30 Possessed Identified and verified.
261 BIRBHUM MANIKPUR PIPED WATER SUPPLY SCHEME(TSM/016147,SM/18509) New Labpur Manikpur 23.819162, 87.860417 Pump House Vested 116 1 346 4 Possessed (TW-2) Identified but demarcation of specific pin point site required.
262 BIRBHUM Mostala Piped Water Supply Scheme.(TSM/015094,SM/18519) New Bolpur Sriniketan Singi Near Singhee Lawer Danga CWR Vested 163 1 5562 4 Possessed CWR (Z-II) Lat - 23.585755° Long - 87.806866°
263 BIRBHUM Sultanpur Piped Water Supply Scheme Under Mayureswar -II Block Within Birbhum Division(TSM/015737,SM/14160) New Mayureswar - II Kanutia Kanutia Pump House Vested 176 1 485 3 Possessed
264 BIRBHUM MATIKONA PIPED WATER SUPPLY SCHEME(TSM/015501,SM/13643) New Illambazar Pratappur 23.66068, 87.569277 OHR Donated 120 217 171 30 Possessed Identified but demarcation of specific pinpoint site required.
265 BIRBHUM NAWADA PALANDI PIPED WATER SUPPLY SCHEME(TSM/016083,SM/14682) New Nanoor Thupsara 23.572614, 87.855117 Pump House Vested 114 1 3051 3 Possessed (TW-1) Identified but demarcation of specific pinpoint site required.
266 BIRBHUM CHHOTA TULIGRAM PIPED WATER SUPPKY SCHEME OF MAYURESWAR-II BLOCK UNDER BIRBHUM DIVISION(TSM/016652,SM/18513) New Mayureswar - II Akuni Pump House Vested 146 1 435 3 Possessed Pukur Par
267 BIRBHUM Mostala Piped Water Supply Scheme.(TSM/015094,SM/18519) New Bolpur Sriniketan Singi Near Singhee Lawer Danga OHR Vested 163 1 5562 30 Possessed OHR (Z-II) Lat - 23.585755° Long - 87.806866°
268 BIRBHUM Sultanpur Piped Water Supply Scheme Under Mayureswar -II Block Within Birbhum Division(TSM/015737,SM/14160) New Mayureswar - II Mathbahara Mathbahara OHR Vested 179 1 0 36 Possessed
269 BIRBHUM Madhupur Water Supply Scheme(TSM/015317,SM/13644) New Rampurhat - II Purbba Gopalpur Pump House Private 188 1336 854 7 Possessed
270 BIRBHUM NAWADA PALANDI PIPED WATER SUPPLY SCHEME(TSM/016083,SM/14682) New Nanoor Thupsara 23.572614, 87.855117 OHR Vested 114 1 3051 30 Possessed Identified but demarcation of specific pinpoint site required.
271 BIRBHUM SHRICHANDRAPUR PIPED WATER SUPPLY SCHEME(TSM/015539,SM/13516) New Illambazar Shrichandrapur 23.609029, 87.607732 OHR Donated 135 79 1088 30 Possessed Identified but demarcation of specific pinpoint site required.
272 BIRBHUM Dakshin Gram Piped Water Supply Scheme under Mayureswar-I Block within Birbhum Division(TSM/015454,SM/18521) New Mayureswar - I Dakshin Gram Dakshin Gram Pump House Donated 150 1983 648 4 Possessed
273 BIRBHUM FEUGRAM PIPED WATER SUPPLY SCHEME(TSM/015471,SM/13477) New Nanoor Madhpur 23.764758, 87.842702 Pump House Vested 31 1 37 3 Possessed (TW-1) Identified but demarcation of specific pinpoint site required.
274 BIRBHUM SHIRSHA PIPED WATER SUPPLY SCHEME(TSM/015543,SM/13647) New Illambazar Shirsha 23.683669, 87.420078 Pump House Vested 56 1 147 4 Possessed (TW-2) Identified but demarcation of specific pinpoint site required.
275 BIRBHUM Sekedda Piped Water Supply Scheme.(TSM/015615,SM/14683) New Mohammad Bazar Sekeddaha Sekeddaha OHR Vested 29 1 10 40 Possessed DEMARCATION PENDING
276 BIRBHUM RAGHABPUR PIPED WATER SUPPLY SCHEME(TSM/016570,SM/14747) New Labpur Dakshin Bamnigram 23.836024, 87.777409 Pump House Vested 89 1 498 3 Possessed (TW-1) Identified but demarcation of specific pin point site required.
277 BIRBHUM Ruppur and adjoining mouzas Piped Water Supply Scheme.(TSM/015095,SM/14686) New Bolpur Sriniketan Paschim Bahadurpur Near Paschim Bahadurpur Canalpar OHR Vested 53 1 1252 30 Possessed OHR (Z-I) Lat - 23.661193° Long - 87.623365°
278 BIRBHUM RANIPARA PIPED WATER SUPPLY SCHEME(TSM/017183,SM/16276) New Labpur Ranipara 23.777184, 87.843128 Pump House Vested 106 1 313 4 Possessed (TW-2) Identified but demarcation of specific pin point site required.
279 BIRBHUM Budhigram Piped Water Supply Scheme(TSM/015741,SM/16762) New Rampurhat - II Budhigram Pump House Vested 210 1 759 17 Possessed
280 BIRBHUM Barshal piped water supply scheme.(TSM/015509,SM/14535) New Rampurhat - I Chandankantha OHR Vested 113 1 49 32 Possessed
281 BIRBHUM CHHOTA TULIGRAM PIPED WATER SUPPKY SCHEME OF MAYURESWAR-II BLOCK UNDER BIRBHUM DIVISION(TSM/016652,SM/18513) New Mayureswar - II Akuni OHR Private 146 51 290 30 Possessed Pukur Par
282 BIRBHUM BHUBANESWAR PIPED WATER SUPPLY SCHEME(TSM/015542,SM/13387) New Illambazar Santoshpur 23.624358, 87.45889 Pump House Vested 69 1 1670 34 Possessed (TW-2) Identified and verified.
283 BIRBHUM Singari Piped Water Supply Scheme under Mayureswar-II Block within Birbhum Division.(TSM/015492,SM/14208) New Mayureswar - II Brahmanbahara Pump House Vested 63 1 0 10 Possessed
284 BIRBHUM Retrofitting works for providing functional household tap connection (FHTC) under Belera PWSS within Mayureswar-II Block District Birbhum under Birbhum Division, PHE Dte.(TSM/008514,SM/09371) Retrofitting Mayureswar - II Kuliara Pump House Donated 222 78 424 2 Possessed
285 BIRBHUM Retrofitting works for providing functional house hold tap connection (FHTC) under Bara Akalpur PWSS within Mayureswar-II Block District Birbhum under Birbhum Division, PHE Dte.(TSM/008570,SM/09365) Retrofitting Mayureswar - II Paschim Panchbaria Pump House Donated 80 100 1787 4 Possessed
286 BIRBHUM Ninga Piped Water Supply Scheme(TSM/015711,SM/14089) New Rampurhat - II Santoshpur Pump House Vested 177 1 510 4 Possessed
287 BIRBHUM Retrofitting works for providing functional house hold tap connection (FHTC) under Bara Akalpur PWSS within Mayureswar-II Block District Birbhum under Birbhum Division, PHE Dte.(TSM/008570,SM/09365) Retrofitting Mayureswar - II Paschim Panchbaria OHR Donated 80 691 1677 24 Possessed
288 BIRBHUM Shaspur Piped Water Supply Scheme.(TSM/015337,SM/13651) New Rampurhat - II Shaspur OHR Vested 125 1 647 23 Possessed
289 BIRBHUM PANCHPARA PIPED WATER SUPPLY SCHEME(TSM/016098,SM/13951) New Labpur Panchpara 23.863256, 87.8640289 OHR Vested 144 1 1505 30 Possessed Identified but demarcation of specific pin point site required.
290 BIRBHUM DHANASAHA PIPED WATER SUPPLY SCHEME(TSM/015498,SM/18352) New Illambazar Shrirampur 23.766276, 87.562347 OHR Vested 21 1 346 30 Possessed Identified and verified.
291 BIRBHUM GOALDIHI PIPED WATER SUPPLY SCHEME(TSM/016090,SM/15528) New Nanoor Goaldihi 23.636533, 87.898247 Pump House Vested 91 1 2007 4 Possessed (TW-2) Identified but demarcation of specific pinpoint site required.
292 BIRBHUM CHHATAR BANDI PIPED WATER SUPPLY SCHEME(TSM/015489,SM/18354) New Illambazar Hansra 23.71303, 87.548983 Pump House Vested 28 1 4446 3 Possessed (TW-1) Identified but demarcation of specific pinpoint site required.
293 BIRBHUM BRAHMANKHANDA PIPED WATER SUPPLY SCHEME(TSM/015460,SM/14534) New Nanoor Brahmankhanda 23.593738, 87.885258 OHR Vested 125 1 271 30 Possessed Identified but demarcation of specific pinpoint site required.
294 BIRBHUM ULANDI PIPED WATER SUPPLY SCHEME(TSM/015500,SM/13654) New Illambazar Kurmitha 23.737866, 87.518438 Pump House Vested 6 1 1186 3 Possessed (TW-1) Identified but demarcation of specific pinpoint site required.
295 BIRBHUM ULANDI PIPED WATER SUPPLY SCHEME(TSM/015500,SM/13654) New Illambazar Kurmitha 23.737866, 87.518438 OHR Vested 6 1 1186 30 Possessed Identified but demarcation of specific pinpoint site required.
296 BIRBHUM Retrofitting works of Narayanpur(Phase-II) Water Supply Scheme under Rampurhat-I Block for providing Functional Household Tap Connection(FHTC) within the command area of the scheme(TSM/006177,SM/07153) Retrofitting Rampurhat - I Narayanpur OHR Vested 3 1 1382 6 Possessed
297 BIRBHUM KADOA PIPED WAYER SUPPLY SCHEME(TSM/017099,SM/14668) New Labpur Kadoa 23.773794, 87.809864 OHR Vested 81 1 924 30 Possessed Identified but demarcation of specific pin point site required.
298 BIRBHUM Radipur Piped Water Supply Scheme.(TSM/016078,SM/14027) New Rampurhat - I Bhatina OHR Vested 19 1 858 40 Possessed
299 BIRBHUM Charkalgram Piped Water Supply Scheme(TSM/015455,SM/13481) New Nanoor Pilkhundi 23.654507, 87.876019 Pump House Vested 77 1 552 4 Possessed (TW-1) Identified but demarcation of specific pinpoint site required.
300 BIRBHUM Purba Anantapur Piped Water Supply Scheme(TSM/015554,SM/13715) New Rampurhat - II Purba Anantapur Pump House Private 172 805 123 4 Possessed
301 BIRBHUM MAHESWARPUR PIPED WATER SUPPLY SCHEME(TSM/015545,SM/15254) New Illambazar Maheswarpur 23.706941, 87.556438 OHR Vested 33 1 722 30 Possessed Identified but demarcation of specific pinpoint site required.
302 BIRBHUM BALIARA PIPED WATER SUPPLY SCHEME(TSM/017430,SM/14847) New Nanoor Karea 23.731984, 87.884685 Pump House Vested 19 1 707 4 Possessed (TW-1) Identified but demarcation of specific pinpoint site required.
303 BIRBHUM BALIARA PIPED WATER SUPPLY SCHEME(TSM/017430,SM/14847) New Nanoor Karea 23.730994, 87.885165 Pump House Vested 19 1 716 4 Possessed (TW-1) Identified but demarcation of specific pinpoint site required.
304 BIRBHUM Ramnagar Piped Water Supply Scheme under Mayureswar-II Block within Birbhum Division.(TSM/015482,SM/16373) New Mayureswar - II Panch Gonutia Pump House Vested 240 1 1879 10 Possessed
305 BIRBHUM Asenga Piped Water Supply Scheme.(TSM/014568,SM/12680) New Mohammad Bazar Angar Garia Angar Garia OHR Vested 143 1 657 40 Possessed DEMARCTION BY GP IS COMPLETED
306 BIRBHUM BHETER PIPED WATER SUPPLY SCHEME(TSM/016086,SM/14848) New Nanoor Palita 23.640843, 87.875012 OHR Vested 89 1 90 30 Possessed Identified but demarcation of specific pinpoint site required.
307 BIRBHUM Ramnagar Piped Water Supply Scheme under Mayureswar-II Block within Birbhum Division.(TSM/015482,SM/16373) New Mayureswar - II Malancha OHR Vested 242 1 696 40 Possessed
308 BIRBHUM Augmentation of ground water based piped water supply scheme for Hazarpur (Zone-I & Zone-II), Block-Rampurhat-II, Dist- Birbhum within Birbhum Division PHE Dte.(TSM/015001,SM/14960) Augmentation Rampurhat - II Tapan Pump House Private 163 2465 474 3 Possessed Zone I (3rd pump house)
309 BIRBHUM Sekedda Piped Water Supply Scheme.(TSM/015615,SM/14683) New Mohammad Bazar Ganpur Ganpur OHR Vested 18 1 20 40 Possessed DEMARCATION PENDING
310 BIRBHUM Sekedda Piped Water Supply Scheme.(TSM/015615,SM/14683) New Mohammad Bazar Dighalgram Dighalgram OHR Vested 26 1 350 40 Possessed DEMARCATION PENDING
311 BIRBHUM Ruppur and adjoining mouzas Piped Water Supply Scheme.(TSM/015095,SM/14686) New Bolpur Sriniketan Chak Pali Pump House Vested 49 1 380 4 Possessed TW-5 Lat - Long -
312 BIRBHUM Mostala Piped Water Supply Scheme.(TSM/015094,SM/18519) New Bolpur Sriniketan Jashra Pump House Donated 164 941 935 4 Possessed TW-3 Lat - 23.579183° Long - 87.798019°
313 BIRBHUM Khamedda Piped Water Supply Scheme(TSM/015742,SM/13980) New Rampurhat - II Khamedda Pump House Private 214 2995 1208 3 Possessed
314 BIRBHUM Ruppur and adjoining mouzas Piped Water Supply Scheme.(TSM/015095,SM/14686) New Bolpur Sriniketan Paschim Islampur Nearby Paschim Ishlampur Samshan CWR Vested 55 1 4 4 Possessed CWR (Z-I) Lat - 23.680276° Long - 87.625966°
315 BIRBHUM Mostala Piped Water Supply Scheme.(TSM/015094,SM/18519) New Bolpur Sriniketan Singi Near Singhee Lawer Danga Pump House Vested 163 1 5562 4 Possessed TW-1 Lat - 23.585755° Long - 87.806866°
316 BIRBHUM Ekpara Piped Water Supply Scheme.(TSM/014680,SM/12690) New Rampurhat - I Ekpara OHR Donated 2 927 441 40 Possessed
317 BIRBHUM FEUGRAM PIPED WATER SUPPLY SCHEME(TSM/015471,SM/13477) New Nanoor Madhpur 23.764758, 87.842702 OHR Vested 31 1 37 30 Possessed Identified but demarcation of specific pinpoint site required.
318 BIRBHUM Retrofitting works for providing Functional Household Tap Connection (FHTC) under Dunigram PWSS (Phase-III) (TSM/006722,SM/07647) Retrofitting Rampurhat - II Chandpara Pump House Private 184 58 1512 6 Possessed
319 BIRBHUM Albandha Piped Water Supply Scheme.(TSM/015177,SM/14533) New Bolpur Sriniketan Laldaha Adityapur to Albandha Road (Barokahina more) CWR Vested 76 1 18 4 Possessed CWR (Z-I) Lat - 23.732931° Long - 87.719964°
320 BIRBHUM BENAGRAM PIPED WATER SUPPLY SCHEME(TSM/015486,SM/13377) New Nanoor Banagram 23.631902, 87.8573 Pump House Vested 80 1 2649 4 Possessed (TW-2) Identified but demarcation of specific pinpoint site required.
321 BIRBHUM BENGA CHATRA PIPED WATER SUPPLY SCHEME(TSM/015476,SM/13408) New Nanoor Kuramba Ghosh 23.610528, 87.83232 Pump House Vested 82 1 1736 4 Possessed (TW-2) Identified but demarcation of specific pinpoint site required.
322 BIRBHUM BENAGRAM PIPED WATER SUPPLY SCHEME(TSM/015486,SM/13377) New Nanoor Banagram 23.632818, 87.858965 OHR Vested 80 1 2461 30 Possessed Identified but demarcation of specific pinpoint site required.
323 BIRBHUM BENGA CHATRA PIPED WATER SUPPLY SCHEME(TSM/015476,SM/13408) New Nanoor Kuramba Ghosh 23.614735, 87.832855 OHR Vested 82 1 1350 30 Possessed Identified but demarcation of specific pinpoint site required.
324 BIRBHUM Retrofitting works for providing Functional Household Tap Connection (FHTC) within the command area of Narayanghati Phase-II Water Supply Scheme.(TSM/014645,SM/13371) Retrofitting Mayureswar - II Hatinagar Pump House Donated 91 340 0 7 Possessed
325 BIRBHUM BHEPUR PIPED WATER SUPPLY SCHEME(TSM/015433,SM/13759) New Nanoor Srikrishnapur 23.598523, 87.937403 Pump House Vested 135 1 260 3 Possessed (TW-1) Identified but demarcation of specific pin point site required.
326 BIRBHUM RAUTGARA PIPED WATER SUPPLY SCHEME OF MAYURESWAR-I BLOCK UNDER BIRBHUM DISTRICT(TSM/016708,SM/14894) New Mayureswar - I Rautgara Rautgara OHR Donated 7 205 0 20 Possessed
327 BIRBHUM THIBA PIPEED WATER SUPPLY SCHEME(TSM/017115,SM/14968) New Labpur Thiba 23.820144, 87.893048 OHR Vested 150 1 185 30 Possessed Identified but demarcation of specific pin point site required.
328 BIRBHUM Baraturi Gram Piped Water Supply Scheme under Mayureswar -I Block within Birbhum Division PHE Dte.(TSM/015347,SM/14424) New Mayureswar - I Gopalnagar Pump House Private 175 57 272 3 Possessed BLLRO Report pending
329 BIRBHUM Augmentation of Ground water Based piped water supply scheme for Dunigram (Zone-I & II), Block- Rampurhat-II, Dist- Birbhum, Within Birbhum Division, PHE Dte.(TSM/015009,SM/15236) Augmentation Rampurhat - II Chandpara Pump House Private 184 58 1512 6 Possessed
330 BIRBHUM Shibgram Piped Water Supply Scheme under Mayureswar-I Block within Birbhum Division.(TSM/015462,SM/13476) New Mayureswar - I Shibgram Shibgram OHR Donated 147 1378 522 29 Possessed
331 BIRBHUM Shibgram Piped Water Supply Scheme under Mayureswar-I Block within Birbhum Division.(TSM/015462,SM/13476) New Mayureswar - I Shibgram Shibgram Pump House Donated 147 1378 524 10 Possessed
332 BIRBHUM FARIDPUR PIPED WATER SUPPLY SCHEME(TSM/016785,SM/14971) New Labpur Faridpur 23.819860, 87.727736 Pump House Vested 21 1 207 4 Possessed (TW-1) Identified but demarcation of specific pin point site required.
333 BIRBHUM Gaytha Piped Water Supply Scheme(TSM/015546,SM/13712) New Rampurhat - II Bonta Pump House Vested 168 1 485 5 Possessed
334 BIRBHUM Prayagpur Piped Water Supply Scheme under Mayureswar-II Block Within Birbhum Division(TSM/015739,SM/14088) New Mayureswar - II Darkandi Darkandi OHR Vested 125 1 0 36 Possessed
335 BIRBHUM TATINAPARA PIPED WATER SUPPLY SCHEME(TSM/015894,SM/13979) New Labpur Ekut 23.797794, 87.754959 Pump House Vested 37 1 1155 4 Possessed (TW-2) Identified but demarcation of specific pin point site required.
336 BIRBHUM Retrofitting works for providing functional household tap connection (FHTC) under Sekhpur PWSS within Mayureswar-I Block District Birbhum under Birbhum Division, PHE Dte.(TSM/008572,SM/09363) Retrofitting Mayureswar - I Sekhpur OHR Donated 5 150 3831 26 Possessed
337 BIRBHUM Sahapur Piped water Supply Scheme.(TSM/015328,SM/13649) New Rampurhat - II Nima Pakhuria OHR Vested 128 1 1133 47 Possessed
338 BIRBHUM Kanksa piped water supply scheme under Mayureswar-I block within Birbhum Division(TSM/016201,SM/14119) New Mayureswar - I Gadadharpur Pump House Donated 14 841 441 7 Possessed 375/B.L&L.R.O/M'swar-I/2023 on 20/03/2023 (For 2nd T.W. & 2nd pump House Site)
339 BIRBHUM MADDA PIPED WATER SUPPLY SCHEME(TSM/016100,SM/15255) New Nanoor Madda 23.622412, 87.881428 OHR Vested 108 1 550 30 Possessed Identified but demarcation of specific pinpoint site required.
340 BIRBHUM RAMKRISHNAPUR PIPED WATER SUPPLY SCHEME(TSM/016099,SM/13950) New Nanoor Barasat Pump House Donated 121 615 6 4 Possessed (TW-2) Identified but demarcation of specific pinpoint site required.
341 BIRBHUM Dhalla Piped Water Supply Scheme(TSM/015726,SM/15256) New Rampurhat - II Dakshin Narayanpur Pump House Vested 206 1 394 4 Possessed
342 BIRBHUM PANCHPARA PIPED WATER SUPPLY SCHEME(TSM/016098,SM/13951) New Labpur Panchpara 23.8613649, 87.857457 Pump House Vested 144 1 1504 4 Possessed (TW-2) Identified but demarcation of specific pin point site required.
343 BIRBHUM Monoharpur Piped Water Supply Scheme.(TSM/015578,SM/13511) New Bolpur Sriniketan Monoharpur OHR Vested 48 1 2280 30 Possessed OHR Lat - 23.68637° Long - 87.621467°
344 BIRBHUM RAMKRISHNAPUR PIPED WATER SUPPLY SCHEME(TSM/016099,SM/13950) New Nanoor Barasat 23.572533, 87.873191 Pump House Donated 121 615 6 3 Possessed (TW-1) Identified but demarcation of specific pinpoint site required.
345 BIRBHUM KURUMBA PIPED WATER SUPPLY SCHEME(TSM/016231,SM/14743) New Labpur Kurumba 23.735773, 87.784178 Pump House Vested 58 1 4001 4 Possessed (TW-2) Identified but demarcation of specific pin point site required.
346 BIRBHUM Retrofitting works for providing Functional Household Tap Connection (FHTC) within the command area of Belera Phase-II Water Supply Scheme.(TSM/014631,SM/12660) Retrofitting Mayureswar - II Kuliara OHR Vested 222 1 584 16 Possessed
347 BIRBHUM CHUNPALASHI PIPED WATER SUPPLY SCHEME(TSM/015493,SM/13637) New Illambazar Chunpalashi 23.672628, 87.54297 Pump House Vested 100 1 93 3 Possessed (TW-1) Identified but demarcation of specific pinpoint site required.
348 BIRBHUM Dabuk Piped Water Supply Scheme under Mayureswar-I Block within Birbhum Division(TSM/015431,SM/13480) New Mayureswar - I Majurhati MAJURHATI(PLOT NO:263) Pump House Vested 157 1 263 10 Possessed
349 BIRBHUM Retrofitting works for providing Functional Household Tap Connection (FHTC) within the command area of Basudebpur Phase-II Water Supply Scheme.(TSM/014573,SM/12662) Retrofitting Mayureswar - II Gopinathpur Pump House Vested 127 1 0 2 Possessed
350 BIRBHUM ANGORA PIPED WATER SUPPLY SCHEME(TSM/016091,SM/13971) New Nanoor Angora Near Angora Pry. School Pump House Vested 94 1 615 3 Possessed TW-1 Lat - 23.65707 Long - 87.906383
351 BIRBHUM Chakpara piped water supply scheme.(TSM/015256,SM/13638) New Rampurhat - I Chakpara OHR Vested 54 1 644 40 Possessed
352 BIRBHUM Retrofitting works for providing Functional Household Tap Connection (FHTC) within the command area of Raypur Phase-II Water Supply Scheme(TSM/014565,SM/12663) Retrofitting Mohammad Bazar Deucha OHR Vested 67 1 539 156 Possessed Raypur PWSS Zone II
353 BIRBHUM Kanaipur piped water supply scheme.(TSM/015178,SM/13640) New Rampurhat - I Kanaipur OHR Vested 8 1 129 40 Possessed
354 BIRBHUM BHATRA PIPED WATER SUPPLY SCHEME(TSM/017151,SM/14958) New Labpur Bagha 23.826555, 87.910035 Pump House Vested 167 1 632 4 Possessed (TW-2) Identified but demarcation of specific pin point site required.
355 BIRBHUM BHUBANESWAR PIPED WATER SUPPLY SCHEME(TSM/015542,SM/13387) New Illambazar Santoshpur 23.627966, 87.457045 Pump House Vested 69 1 931 4 Possessed (TW-1) Identified and verified.
356 BIRBHUM Kendangal Piped Water Supply Scheme.(TSM/015607,SM/13642) New Bolpur Sriniketan Kendangal Beside Suri - Bolpur Rd (Near Sadbhab Mandap) Pump House Vested 57 1 2083 4 Possessed TW-2 Lat - Long -
357 BIRBHUM Augmentation of ground water based piped water supply scheme for Hazarpur (Zone-I & Zone-II), Block-Rampurhat-II, Dist- Birbhum within Birbhum Division PHE Dte.(TSM/015001,SM/14960) Augmentation Rampurhat - II Pariharpur OHR Donated 161 566 619 40 Possessed Zone I (OHR & 1st pump house)
358 BIRBHUM Nabagram Piped Water Supply Scheme.(TSM/015339,SM/13646) New Rampurhat - II Ranapur Pump House Vested 117 1 61 35 Possessed
359 BIRBHUM Dabuk Piped Water Supply Scheme under Mayureswar-I Block within Birbhum Division(TSM/015431,SM/13480) New Mayureswar - I Dabuk Dabuk(PLOT NO:245/2552) OHR Private 158 1 245 42 Possessed
360 BIRBHUM KADOA PIPED WAYER SUPPLY SCHEME(TSM/017099,SM/14668) New Labpur Kadoa 23.773794, 87.809864 Pump House Vested 81 1 924 3 Possessed (TW-1) Identified but demarcation of specific pin point site required.
361 BIRBHUM Prayagpur Piped Water Supply Scheme under Mayureswar-II Block Within Birbhum Division(TSM/015739,SM/14088) New Mayureswar - II Amchua Amchua Pump House Vested 115 1 0 36 Possessed
362 BIRBHUM BARA KARTIK CHUNGRI PIPED WATER SUPPLY SCHEME(TSM/016208,SM/18514) New Rampurhat - II Bara Karttik Chungri Pump House Vested 182 1 5068 4 Possessed 3rd pump house
363 BIRBHUM Singari Piped Water Supply Scheme under Mayureswar-II Block within Birbhum Division.(TSM/015492,SM/14208) New Mayureswar - II Brahmanbahara OHR Donated 63 1679 0 21 Possessed
364 BIRBHUM Charkalgram Piped Water Supply Scheme(TSM/015455,SM/13481) New Nanoor Pilkhundi 23.658508, 87.874718 OHR Vested 77 1 171 30 Possessed Identified and verified.
365 BIRBHUM BHETER PIPED WATER SUPPLY SCHEME(TSM/016086,SM/14848) New Nanoor Palita 23.640843, 87.875012 Pump House Vested 89 1 90 3 Possessed (TW-1) Identified but demarcation of specific pinpoint site required.
366 BIRBHUM Sandhyajol Piped Water Supply Scheme(TSM/015736,SM/13981) New Rampurhat - II Parun Pump House Vested 132 1 219 4 Possessed
367 BIRBHUM Bajitpur Piped Water Supply Scheme under mayureswar-I Block within Birbhum Division.(TSM/015724,SM/13983) New Mayureswar - I Bajitpur Bajitpur OHR Vested 8 1 0 40 Possessed
368 BIRBHUM SAJNOR PIPED WATER SUPPLY SCHEME(TSM/016227,SM/14678) New Nanoor Sajnor 23.644703, 87.932749 Pump House Vested 98 1 1325 4 Possessed (TW-2) Identified but demarcation of specific pinpoint site required.
369 BIRBHUM HATKALUA PIPED WATER SUPPLY SCHEME(TSM/016242,SM/14115) New Labpur Hatkaluha 23.801478, 87.956593 Pump House Vested 182 1 81 4 Possessed (TW-2)
370 BIRBHUM HANSAN PIPED WATER SUPPLY SCHEME(TSM/016218,SM/14900) New Rampurhat - II Shrikrishnapur Pump House Vested 185 1 140 3 Possessed
371 BIRBHUM Shaspur Piped Water Supply Scheme.(TSM/015337,SM/13651) New Rampurhat - II Shaspur Pump House Vested 125 1 365 12 Possessed Pukur Par
372 BIRBHUM Lachhiator Piped Water Supply Scheme under Mayureswar-I Block within Birbhum Division.(TSM/015474,SM/14125) New Mayureswar - I Namakanda Namakanda Pump House Donated 34 417 0 20 Possessed
373 BIRBHUM Srikantapur piped water supply scheme.(TSM/015507,SM/13652) New Mohammad Bazar Kukaradihi Kukaradihi OHR Vested 61 1 770 40 Possessed DEMARCATION PENDING BY BLRO
374 BIRBHUM Kashtagara Piped Water Supply Scheme.(TSM/016499,SM/18733) New Rampurhat - I Hastikanda OHR Vested 31 1 189 40 Possessed Land for Kashtagara Zone-I
375 BIRBHUM Bhabani Water Supply Scheme(TSM/015496,SM/18351) New Illambazar Bhabanipur 23.674428, 87.459462 OHR Vested 83 1 214 30 Possessed Identified but demarcation of specific pinpoint site required.
376 BIRBHUM MASTALI PIPED WATER SUPPLY SCHEME(TSM/017207,SM/16275) New Labpur Mastali 23.807815, 87.805994 OHR Vested 83 1 443 30 Possessed Identified but demarcation of specific pin point site required.