1 |
MALDAH |
Source Augmentation of Bhabuk Water Supply Scheme of Habibpur Block under Malda Division P.H.E Dte. Malda ,TSM/014864 ,SM/12762 |
Augmentation |
20/09/2022 |
149.78 |
67.25 |
67.25 |
44.9 |
81 |
2 |
MALDAH |
Additional Capital Cost Estimate for mechanical/ electrical components for Augmentation of Surface based piped water supply scheme under Northern and Southern Sector of Manikchak, English Bazar, Kaliachak -I, II, III block, dist. Malda under Malda Mechani ,TSM/020265 ,SM/19225 |
Augmentation |
25/07/2024 |
2,769.31 |
0.00 |
0.00 |
0 |
0 |
3 |
MALDAH |
Augmentation of Adina Zone-I Piped Water Supply Scheme ,TSM/011889 ,SM/15958 |
Augmentation |
22/02/2023 |
543.44 |
135.31 |
135.31 |
24.9 |
44 |
4 |
MALDAH |
Augmentation of Adina Zone-II Piped Water Supply Scheme ,TSM/011890 ,SM/15956 |
Augmentation |
22/02/2023 |
355.78 |
164.17 |
164.17 |
46.14 |
60 |
5 |
MALDAH |
AUGMENTATION OF AIHO ZONE-I PIPED WATER SUPPLY SCHEME ,TSM/017676 ,SM/15155 |
Augmentation |
07/02/2023 |
398.39 |
205.46 |
205.46 |
51.57 |
53 |
6 |
MALDAH |
Augmentation of Alal Zone-III Piped Water Supply Scheme ,TSM/011885 ,SM/15951 |
Augmentation |
22/02/2023 |
425.25 |
181.55 |
181.55 |
42.69 |
52 |
7 |
MALDAH |
AUGMENTATION OF ARIADANGA PIPED WATER SUPPLY SCHEME ,TSM/008180 ,SM/10181 |
Augmentation |
17/02/2022 |
2,126.39 |
1,040.91 |
1,040.88 |
48.95 |
62 |
8 |
MALDAH |
Augmentation of Baharal Zone-I & II Piped Water Supply Scheme ,TSM/011899 ,SM/14099 |
Augmentation |
15/12/2022 |
2,200.14 |
136.36 |
136.36 |
6.2 |
45 |
9 |
MALDAH |
Augmentation of Bamongram piped water supply scheme. ,TSM/008160 ,SM/10138 |
Augmentation |
08/02/2022 |
1,038.64 |
667.12 |
667.12 |
64.23 |
83 |
10 |
MALDAH |
Augmentation of Bejpura Piped Water Supply Scheme under Malda Division, PHE Dte. ,TSM/020578 ,SM/18910 |
Augmentation |
09/10/2023 |
133.47 |
0.00 |
0.00 |
0 |
10 |
11 |
MALDAH |
Augmentation of Bhaluka Fatepur Piped water supply scheme ,TSM/009046 ,SM/10137 |
Augmentation |
08/02/2022 |
1,077.25 |
435.88 |
435.88 |
40.46 |
87 |
12 |
MALDAH |
AUGMENTATION OF BHINGOL PIPED WATER SUPPLY SCHEME ,TSM/017675 ,SM/15948 |
Augmentation |
22/02/2023 |
254.87 |
84.04 |
84.04 |
32.97 |
71 |
13 |
MALDAH |
Augmentation of Bulbulchandi PWSS. ,TSM/008161 ,SM/09422 |
Augmentation |
17/11/2021 |
981.06 |
619.20 |
619.20 |
63.12 |
70 |
14 |
MALDAH |
Augmentation of Deotala Water Supply Scheme ,TSM/005108 ,SM/09986 |
Augmentation |
16/12/2021 |
842.06 |
182.78 |
182.78 |
21.71 |
66 |
15 |
MALDAH |
Augmentation of Ground Water Based GAZOLE (Zone-I, II, III & IV) Piped Water Supply Scheme under Malda Division, PHE Dte. ,TSM/017388 ,SM/18558 |
Augmentation |
31/07/2023 |
3,085.32 |
535.86 |
530.03 |
17.18 |
38 |
16 |
MALDAH |
Augmentation of Jatradanga Piped water supply scheme ,TSM/010498 ,SM/12734 |
Augmentation |
20/09/2022 |
390.21 |
98.37 |
98.37 |
25.21 |
42 |
17 |
MALDAH |
AUGMENTATION OF JOTGOPAL Piped Water Supply Scheme ,TSM/008179 ,SM/14190 |
Augmentation |
10/01/2023 |
546.57 |
112.65 |
112.65 |
20.61 |
42 |
18 |
MALDAH |
Augmentation of Khusida Piped Water Supply Scheme ,TSM/008174 ,SM/10397 |
Augmentation |
31/03/2022 |
1,222.99 |
526.38 |
526.38 |
43.04 |
52 |
19 |
MALDAH |
Augmentation of Maheshpur piped water supply scheme ,TSM/005106 ,SM/12362 |
Augmentation |
13/09/2022 |
1,566.03 |
711.07 |
711.07 |
45.41 |
82 |
20 |
MALDAH |
Augmentation of Mahishbathani Piped Water Supply Scheme ,TSM/017802 ,SM/16383 |
Augmentation |
28/02/2023 |
328.05 |
108.33 |
108.33 |
33.02 |
46 |
21 |
MALDAH |
AUGMENTATION OF MALATIPUR PWSS ,TSM/008173 ,SM/09987 |
Augmentation |
16/12/2021 |
699.42 |
351.63 |
351.63 |
50.27 |
77 |
22 |
MALDAH |
Augmentation of Mirzapur Piped Water Supply Scheme ,TSM/009757 ,SM/10317 |
Augmentation |
04/03/2022 |
1,029.67 |
632.21 |
632.21 |
61.4 |
83 |
23 |
MALDAH |
Augmentation of Nasipur Piped Water Supply Scheme ,TSM/011880 ,SM/15952 |
Augmentation |
22/02/2023 |
868.83 |
338.98 |
338.98 |
39.02 |
46 |
24 |
MALDAH |
Augmentation of Samsi PWSS. ,TSM/008164 ,SM/18447 |
Augmentation |
20/07/2023 |
2,234.04 |
279.13 |
269.38 |
12.06 |
35 |
25 |
MALDAH |
AUGMENTATION OF SURFACE WATER BASED PIPED WATER SUPPLY SCHEME FOR MALDAH ARSENIC AREA (NORTHERN & SOUTHERN SECTOR) ,TSM/019386 ,SM/18660 |
Augmentation |
04/08/2023 |
80,427.62 |
21,474.84 |
21,474.84 |
26.7 |
45 |
26 |
MALDAH |
Augmentation of Tilasan Piped water supply scheme ,TSM/009047 ,SM/09567 |
Augmentation |
22/11/2021 |
331.85 |
226.09 |
226.09 |
68.13 |
92 |
27 |
MALDAH |
Augmentation of Uttar Chandipur Zone- I Piped Water Supply Scheme under Malda Division, PHE Dte. ,TSM/019385 ,SM/16053 |
Augmentation |
22/02/2023 |
620.93 |
261.89 |
261.89 |
42.18 |
60 |
28 |
MALDAH |
Augmentation of Uttar Chandipur Zone- II Piped Water Supply Scheme under Malda Division, PHE Dte. ,TSM/019387 ,SM/16382 |
Augmentation |
28/02/2023 |
1,030.99 |
118.07 |
115.05 |
11.16 |
43 |
29 |
MALDAH |
Augmentation of Uttar Chandipur Zone- III Piped Water Supply Scheme under Malda Division, PHE Dte. ,TSM/019388 ,SM/15149 |
Augmentation |
06/02/2023 |
881.16 |
150.86 |
150.86 |
17.12 |
53 |
30 |
MALDAH |
Augmentation of Uttar Chandipur Zone- IV A Piped Water Supply Scheme under Malda Division, PHE Dte. ,TSM/019389 ,SM/15308 |
Augmentation |
10/02/2023 |
879.54 |
134.22 |
121.08 |
13.77 |
55 |
31 |
MALDAH |
Augmentation of Uttar Chandipur Zone- IV B Piped Water Supply Scheme under Malda Division, PHE Dte. ,TSM/019390 ,SM/15193 |
Augmentation |
06/02/2023 |
988.47 |
174.89 |
174.89 |
17.69 |
56 |
32 |
MALDAH |
Augmentation of Uttar Harishandropur piped water supply scheme. ,TSM/008163 ,SM/10291 |
Augmentation |
28/02/2022 |
2,223.72 |
801.27 |
801.04 |
36.02 |
60 |
33 |
MALDAH |
AUMENTATION OF AIHO ZONE-II PIPED WATER SUPPLY SCHEME ,TSM/017677 ,SM/15188 |
Augmentation |
07/02/2023 |
390.50 |
166.58 |
166.58 |
42.66 |
58 |
34 |
MALDAH |
Construction of 6 (six) nos CWR in connection with providing FHTC under surface water based Malda arsenic Area water supply scheme ( Northern & Southern Sector) ,TSM/017446 ,SM/15142 |
Augmentation |
06/02/2023 |
622.76 |
565.52 |
539.64 |
86.65 |
91 |
35 |
MALDAH |
Ground Water Based Augmentation of Chanchal Piped Water Supply Scheme ,TSM/011884 ,SM/13792 |
Augmentation |
22/11/2022 |
2,992.80 |
354.85 |
354.85 |
11.86 |
32 |
36 |
MALDAH |
Improvement of existing 2 X 250 KVA Substation (11/0.433 Kv) with other allied works at Water Treatment Plant of Gour Area and Augmentation of Mahadipur W/S Scheme under Malda Mechanical Division, P.H.E. Dte. ,TSM/014262 ,SM/13237 |
Augmentation |
14/10/2022 |
123.52 |
111.15 |
102.17 |
82.71 |
81 |
37 |
MALDAH |
Improvement of Ground water Based piped water supply scheme by Installation of Arsenic /Iron Removal plant for Gopalpur -I & II water supply schemes under Malda Arsenic area water supply Division, PHED ,TSM/018197 ,SM/15143 |
Augmentation |
06/02/2023 |
270.23 |
160.90 |
160.90 |
59.54 |
70 |
38 |
MALDAH |
Improvement of Ground water Based piped water supply scheme by Installation of Arsenic /Iron Removal plant for Talimnagar & Adjoining mouzas water supply schemes under Malda Arsenic area water supply Division, PHED ,TSM/018215 ,SM/15145 |
Augmentation |
06/02/2023 |
31.42 |
20.31 |
20.31 |
64.64 |
80 |
39 |
MALDAH |
Laying of additional pipe line at various Piped Water Supply Schemes under Harishchandrapur-I & II Block under Malda Division, PHE Dte. ,TSM/017205 ,SM/15086 |
Augmentation |
04/02/2023 |
116.57 |
93.75 |
93.75 |
80.42 |
87 |
40 |
MALDAH |
Laying of additional pipeline and restoration in connection with retrofitting of Baherpur Water Supply Scheme ( Zone I & Zone II) in Bamongola Dev. Block under Malda Division P.H.E Dte Malda. ,TSM/017379 ,SM/15197 |
Augmentation |
06/02/2023 |
164.65 |
134.36 |
134.36 |
81.6 |
87 |
41 |
MALDAH |
Source Augmentation of Adhna Piped Water Supply Scheme under Malda Division, PHE Dte. ,TSM/016220 ,SM/15063 |
Augmentation |
04/02/2023 |
124.60 |
63.56 |
63.56 |
51.01 |
78 |
42 |
MALDAH |
Source Augmentation of Akalpur Piped Water Supply Scheme under Malda Division, PHE Dte. ,TSM/012797 ,SM/12314 |
Augmentation |
09/09/2022 |
135.51 |
65.15 |
65.15 |
48.08 |
70 |
43 |
MALDAH |
Source Augmentation of Altor Piped Water Supply Scheme under Malda Division, PHE Dte. ,TSM/012799 ,SM/12312 |
Augmentation |
09/09/2022 |
131.81 |
64.50 |
64.50 |
48.93 |
67 |
44 |
MALDAH |
Source Augmentation of Arapur piped water supply scheme under Malda Arsenic Area w/s Division , PHED ,TSM/017481 ,SM/15141 |
Augmentation |
06/02/2023 |
131.66 |
92.18 |
90.19 |
68.5 |
82 |
45 |
MALDAH |
Source Augmentation of Arjuna Piped Water Supply Scheme under Malda Division, PHE Dte. ,TSM/016722 ,SM/15074 |
Augmentation |
04/02/2023 |
83.83 |
36.70 |
36.70 |
43.78 |
78 |
46 |
MALDAH |
Source Augmentation of Bahirgachi Piped Water Supply Scheme under Malda Division, PHE Dte. ,TSM/015614 ,SM/15113 |
Augmentation |
04/02/2023 |
261.08 |
147.78 |
147.78 |
56.6 |
76 |
47 |
MALDAH |
Source Augmentation of Basara Piped Water Supply Scheme under Malda Division, PHE Dte. ,TSM/015035 ,SM/12760 |
Augmentation |
20/09/2022 |
220.11 |
6.67 |
2.75 |
1.25 |
56 |
48 |
MALDAH |
Source Augmentation of Bihari Piped Water Supply Scheme under Malda Division, PHE Dte. ,TSM/016679 ,SM/15083 |
Augmentation |
04/02/2023 |
75.97 |
11.48 |
11.48 |
15.11 |
72 |
49 |
MALDAH |
Source Augmentation of Dahara Piped Water Supply Scheme under Malda Division, PHE Dte. ,TSM/016549 ,SM/15105 |
Augmentation |
04/02/2023 |
212.37 |
166.82 |
166.82 |
78.55 |
84 |
50 |
MALDAH |
Source Augmentation of Dakshin Brindabanbati Piped Water Supply Scheme under Malda Division, PHE Dte. ,TSM/015613 ,SM/15201 |
Augmentation |
06/02/2023 |
196.28 |
111.09 |
110.90 |
56.5 |
87 |
51 |
MALDAH |
Source Augmentation of Dakshin Gouripur Piped Water Supply Scheme under Malda Division, PHE Dte. ,TSM/016694 ,SM/15073 |
Augmentation |
04/02/2023 |
96.31 |
28.03 |
28.03 |
29.1 |
78 |
52 |
MALDAH |
Source Augmentation of Dakshin Mahendrapur Piped Water Supply Scheme under Malda Division, PHE Dte. ,TSM/017129 ,SM/15090 |
Augmentation |
04/02/2023 |
102.52 |
60.56 |
60.56 |
59.08 |
73 |
53 |
MALDAH |
Source Augmentation of Dalla Piped Water Supply Scheme under Malda Division, PHE Dte. ,TSM/016720 ,SM/15079 |
Augmentation |
04/02/2023 |
166.09 |
116.68 |
116.68 |
70.25 |
84 |
54 |
MALDAH |
Source Augmentation of Gun Sankrul Piped Water Supply Scheme under Malda Division, PHE Dte. ,TSM/014744 ,SM/12761 |
Augmentation |
20/09/2022 |
295.68 |
225.74 |
225.57 |
76.29 |
79 |
55 |
MALDAH |
Source Augmentation of Kadirpur Piped Water Supply Scheme under Malda Division, PHE Dte. ,TSM/016285 ,SM/15111 |
Augmentation |
04/02/2023 |
272.73 |
121.81 |
121.81 |
44.66 |
83 |
56 |
MALDAH |
Source Augmentation of Kankot Piped Water Supply Scheme under Malda Division, PHE Dte. ,TSM/017203 ,SM/15057 |
Augmentation |
04/02/2023 |
64.27 |
14.56 |
14.56 |
22.65 |
54 |
57 |
MALDAH |
Source Augmentation of Kendua Piped Water Supply Scheme under Malda Division, PHE Dte. ,TSM/016529 ,SM/15106 |
Augmentation |
04/02/2023 |
149.47 |
53.89 |
53.89 |
36.05 |
58 |
58 |
MALDAH |
Source Augmentation of Khatil Piped Water Supply Scheme under Malda Division, PHE Dte. ,TSM/015034 ,SM/14420 |
Augmentation |
20/01/2023 |
172.98 |
12.17 |
12.17 |
7.04 |
45 |
59 |
MALDAH |
Source Augmentation of Kutub Sahar Piped Water Supply Scheme under Malda Division, PHE Dte. ,TSM/014339 ,SM/12317 |
Augmentation |
09/09/2022 |
281.18 |
107.71 |
103.81 |
36.92 |
49 |
60 |
MALDAH |
Source Augmentation of Mabrakpur Piped Water Supply Scheme under Malda Division, PHE Dte. ,TSM/016719 ,SM/15080 |
Augmentation |
04/02/2023 |
213.72 |
125.04 |
125.04 |
58.51 |
62 |
61 |
MALDAH |
Source Augmentation of Malipakar Piped Water Supply Scheme under Malda Division, PHE Dte. ,TSM/016606 ,SM/15190 |
Augmentation |
06/02/2023 |
103.91 |
65.85 |
65.85 |
63.37 |
99 |
62 |
MALDAH |
Source Augmentation of Mekpur Piped Water Supply Scheme under Malda Division, PHE Dte. ,TSM/014459 ,SM/12763 |
Augmentation |
20/09/2022 |
369.49 |
176.10 |
176.02 |
47.64 |
54 |
63 |
MALDAH |
Source Augmentation of Mianagar Piped Water Supply Scheme under Malda Division, PHE Dte. ,TSM/014342 ,SM/12316 |
Augmentation |
09/09/2022 |
167.81 |
88.63 |
88.63 |
52.82 |
63 |
64 |
MALDAH |
Source Augmentation of Moyna Piped Water Supply Scheme under Malda Division, PHE Dte. ,TSM/016347 ,SM/15093 |
Augmentation |
04/02/2023 |
196.91 |
57.77 |
57.77 |
29.34 |
58 |
65 |
MALDAH |
Source Augmentation of Nemua Piped Water Supply Scheme under Malda Division, PHE Dte. ,TSM/016470 ,SM/15102 |
Augmentation |
04/02/2023 |
104.31 |
77.28 |
67.26 |
64.49 |
58 |
66 |
MALDAH |
Source Augmentation of Pannapur Piped Water Supply Scheme under Malda Division, PHE Dte. ,TSM/012801 ,SM/12315 |
Augmentation |
09/09/2022 |
174.73 |
84.82 |
84.82 |
48.54 |
56 |
67 |
MALDAH |
Source Augmentation of Parameswarpur Piped Water Supply Scheme under Malda Division, PHE Dte. ,TSM/016354 ,SM/15110 |
Augmentation |
04/02/2023 |
119.40 |
66.66 |
65.44 |
54.8 |
85 |
68 |
MALDAH |
Source Augmentation of Purba Binodpur Piped Water Supply Scheme under Malda Division, PHE Dte. ,TSM/012798 ,SM/12313 |
Augmentation |
09/09/2022 |
145.33 |
69.75 |
69.75 |
48 |
55 |
69 |
MALDAH |
Source Augmentation of Rajarampur Piped Water Supply Scheme under Malda Division, PHE Dte. ,TSM/012802 ,SM/12305 |
Augmentation |
09/09/2022 |
152.39 |
70.51 |
70.51 |
46.27 |
62 |
70 |
MALDAH |
Source Augmentation of Rampur Piped Water Supply Scheme under Malda Division, PHE Dte. ,TSM/016552 ,SM/15062 |
Augmentation |
04/02/2023 |
93.10 |
44.23 |
44.23 |
47.5 |
52 |
71 |
MALDAH |
Source Augmentation of Sadlichak Piped Water Supply Scheme under Malda Division, PHE Dte. ,TSM/016501 ,SM/15112 |
Augmentation |
04/02/2023 |
84.77 |
16.09 |
16.09 |
18.98 |
49 |
72 |
MALDAH |
Source Augmentation of Sailpur Piped Water Supply Scheme under Malda Division, PHE Dte. ,TSM/016471 ,SM/15108 |
Augmentation |
04/02/2023 |
100.43 |
48.96 |
48.96 |
48.75 |
97 |
73 |
MALDAH |
Source Augmentation of Saiyadpur Piped Water Supply Scheme under Malda Division, PHE Dte. ,TSM/012800 ,SM/12311 |
Augmentation |
09/09/2022 |
335.27 |
175.72 |
175.72 |
52.41 |
60 |
74 |
MALDAH |
Source Augmentation of Sankail Piped Water Supply Scheme under Malda Division, PHE Dte. ,TSM/014344 ,SM/12323 |
Augmentation |
09/09/2022 |
180.45 |
76.49 |
76.49 |
42.38 |
43 |
75 |
MALDAH |
Source Augmentation of Talsur Piped Water Supply Scheme under Malda Division, PHE Dte. ,TSM/016724 ,SM/15065 |
Augmentation |
04/02/2023 |
216.09 |
174.99 |
174.99 |
80.98 |
85 |
76 |
MALDAH |
Source Augmentation of Uttar Kumedpur Piped Water Supply Scheme under Malda Division, PHE Dte. ,TSM/017125 ,SM/15091 |
Augmentation |
04/02/2023 |
84.27 |
39.54 |
39.54 |
46.92 |
79 |
77 |
MALDAH |
Source Augmentation of Uttar Nazirpur Piped water supply scheme under Malda arsenic Area w/s Division, PHED ,TSM/017480 ,SM/15144 |
Augmentation |
06/02/2023 |
144.97 |
60.89 |
52.92 |
36.5 |
85 |
78 |
MALDAH |
SOURCE AUGMENTATION TROUGH INTRODUCING ROLLING TYPE BARGE FOR RAW WATER LIFTING FROM RIVER FULHAR AT INTAKE STATION OF BALUPUR WATER SUPPLY SCHEME UNDER RATUA-I BLOCK IN THE DISTRICT OF MALDA UNDER MALDA MECHANICAL DIVISION, PHE DTE. ,TSM/021467 ,SM/18911 |
Augmentation |
09/10/2023 |
109.49 |
42.04 |
42.04 |
38.4 |
39 |