FHTC Corrected Report : 10th SLSSC (2022-23)
Status Report on FHTC Correction after the Appropriation in YDU for the Schemes Approved post 2019-2020

Clear
Rs. in Lakh
Sl No. District
As per Census (2011)
Scheme
Scheme Approved in SLSSC post 2019-2020 as per PHED-MIS
Scheme SM Code
Sanctioned Scheme Code as per PHED-MIS
TSM Code
Temporary Scheme Code as per PHED-MIS
Is Scheme correction completed
Whether FHTC Correction executed
FHTC approved
Approved FHTC Count considered under the Scheme as per PHED-MIS
Increased
FHTC Count Increased after the appropriation in YDU as per PHED-MIS
Decreased
FHTC Count Decreased after the appropriation in YDU as per PHED-MIS
FHTC Modified
Total FHTC Count Modified after the appropriation in YDU as per PHED-MIS
Cost approved
Approved Implementation Cost considered under the Scheme as per PHED-MIS
Increased
Implementation Cost Increased after the appropriation in YDU as per PHED-MIS
Decreased
Implementation Cost Decreased after the appropriation in YDU as per PHED-MIS
Modified Cost
Total Implementation Cost Modified after the appropriation in YDU as per PHED-MIS
10 9,171 0 0 9,171 4,587.49 0 0 4,587.49
1 BIRBHUM MASTALI PIPED WATER SUPPLY SCHEME SM/16275 TSM/017207 Yes 696 0 0 696 486.59 0.00 0.00 486.59
2 BIRBHUM RANIPARA PIPED WATER SUPPLY SCHEME SM/16276 TSM/017183 Yes 876 0 0 876 540.82 0.00 0.00 540.82
3 BIRBHUM Nichinta Piped Water Supply Scheme (Khoyrasole Block) SM/16271 TSM/017782 Yes 237 0 0 237 145.99 0.00 0.00 145.99
4 BIRBHUM Shrirampur Piped Water Supply Scheme (Khoyrasole Block) SM/16272 TSM/017779 Yes 538 0 0 538 249.14 0.00 0.00 249.14
5 BIRBHUM Gulalgachi Piped Supply Scheme SM/18419 TSM/016743 Yes 3,333 0 0 3,333 1,267.58 0.00 0.00 1,267.58
6 BIRBHUM Penchalia Piped Water Supply Scheme SM/16282 TSM/017488 Yes 831 0 0 831 389.54 0.00 0.00 389.54
7 BIRBHUM Sagarbhanga Piped Water Supply Scheme (Khoyrasole Block) SM/16270 TSM/017780 Yes 272 0 0 272 153.88 0.00 0.00 153.88
8 BIRBHUM Amlachaturi Piped Water Supply Scheme SM/16387 TSM/016716 Yes 1,427 0 0 1,427 904.87 0.00 0.00 904.87
9 BIRBHUM Mayandal Piped Water Supply Scheme SM/16273 TSM/017491 Yes 342 0 0 342 158.49 0.00 0.00 158.49
10 BIRBHUM Hatikata Piped Water Supply Scheme SM/16198 TSM/017489 Yes 619 0 0 619 290.59 0.00 0.00 290.59
Total 9,171 0 0 9,171 4,587.49 0.00 0.00 4,587.49