Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
12 578.6 487.95  
1 MALDAH Malda Division BHADAR Piped Water Supply Scheme , SM/12768 New Formal work order for the work of Implementation of BHADAR Piped Water Supply Scheme at Gazole Block of Malda district under Malda Division, PHE Dte., Govt. of West Bengal. Mr. Arnab Giri, Assistant Engineer Amit Karmakar, Junior Engineer 1996/MD 17/05/2023 715 MOONLIGHT CONSTRUCTION AND STAR GOLD ENTERPRISE 336.77 321.92 85
2 MALDAH Malda Division BHADAR Piped Water Supply Scheme , SM/12768 New Acceptance cum formal work order for Laying of Distribution of UPVC Pipeline of BHADAR Piped Water Supply Scheme at Gaole Block of Malda District under Malda Division, PHE Dte., Govt. of West Bengal. Mr. Arnab Giri, Assistant Engineer Amit Karmakar, Junior Engineer 2332/MD 08/06/2023 571 M/S KUNDU CONSTRUCTION 87.98 80.55 90
3 MALDAH Malda Division BHADAR Piped Water Supply Scheme , SM/12768 New W.B.S.E.D.C.LTD Quotation charge at P/H No. I of Bhadar PWSS, Gazole C.C.C in the district of Malda Under Malda Mechanical Division PHE Dte. Assistant Engineer - II 3004390642 16/08/2023 90 W.B.S.E.D.C.LTD 16.23 16.23 100
4 MALDAH Malda Division BHADAR Piped Water Supply Scheme , SM/12768 New Supply and delivery of ISI Marked Centrifugally Cast (Spun) Ductile iron Pressure Pipes for Water with Socket & Spigot ends conforming to IS:8329/2000(latest amendment) in standard length of 5.5 M/6.00M suitable for push on joint (rubber gasket jointing) with Cement Mortar Lining inside the pipes and outside zinc coating with finished layer of Bituminous coating/ Synthetic resin (Blue/Red Epoxy) compatible with zinc coating (Class K-9 & Class K-7) along with supply of EPDM Quality of Rubber Gasket as per IS:5382/1985, for each of the joints admi Assistant Engineer Junior Engineer 2555/RS 17/08/2023 JINDAL SAW LIMITED. 16.80 0.00 15
5 MALDAH Malda Division BHADAR Piped Water Supply Scheme , SM/12768 New Placing of diesel driven Car on hire basis for official use of the office of the Assistant Engineer, Malda Sadar Sub-Division, PHE Dte. under Malda Division, PHE Dte. in good running condition. (Period from 01/07/2023 to 30/09/2023). Mr. Arnab Giri, Assistant Engineer 487/MD 21/06/2023 90 SUBHANKAR SINGH 0.31 0.31 100
6 MALDAH Malda Division BHADAR Piped Water Supply Scheme , SM/12768 New Supply, installation, commissioning and trial operation of electro-mechanical components at T/W no. I & II and making compound lighting arrangement at T/W no. I of Bhadar Water Supply Scheme in the District of Malda under Malda Mechanical Division, PHE Dte. (TSM/014278) Assistant Engineer - II Junior Engineer-06,Junior Engineer-07 3340/MLMD 30/10/2023 180 MOON LIGHT CONSTRUCTION AND STAR GOLD ENTERPRISE 25.45 23.75 93
7 MALDAH Malda Division BHADAR Piped Water Supply Scheme , SM/12768 New Construction of Boundary Wall at Head Work site of Bhadar Water Supply Scheme under Gazole Block under Malda Division, PHE Dte. in the district of Malda. Mr. Arnab Giri, Assistant Engineer Amit Karmakar, Junior Engineer 269/MD 11/01/2024 182 MOONLIGHT CONSTRUCTION AND STAR GOLD ENTERPRISE 22.49 17.39 80
8 MALDAH Malda Division BHADAR Piped Water Supply Scheme , SM/12768 New Laying of Distribution Sysytem and Providing Functional Household Tap Connection (FHTC) of BHADAR Piped Water Supply Scheme at Gazole Block of Malda District under Malda Division, PHE Dte, Govt. of West Bengal. Mr. Arnab Giri, Assistant Engineer Amit Karmakar, Junior Engineer 2928/MD 10/06/2024 386 MOONLIGHT CONSTRUCTION AND STAR GOLD ENTERPRISE 55.17 27.80 50
9 MALDAH Malda Division BHADAR Piped Water Supply Scheme , SM/12768 New Construction of Boundary Wall at 2nd Tube Well Site of BHADAR Piped Water Supply Scheme at Gazole Dev. Block under Malda Division, PHE Dte. in the district of Malda. Mr. Arnab Giri, Assistant Engineer Amit Karmakar, Junior Engineer 2930/MD 10/06/2024 45 NANDAN ENTERPRISE 6.73 0.00 70
10 MALDAH Malda Division BHADAR Piped Water Supply Scheme , SM/12768 New Continuation work-Continuation work-Operation & Guarding of the Pumping Machinery (Automatic Operation) including all allied electro- mechanical components at Pump-House no I of BHADAR W/S Scheme in the District of Malda under Malda Mechanical Division, P.H.E. Dte. Assistant Engineer - II Junior Engineer-07 3478/MLMD 30/10/2024 92 MOON LIGHT CONSTRUCTION AND STAR GOLD ENTERPRISE 0.81 0.00 100
11 MALDAH Malda Division BHADAR Piped Water Supply Scheme , SM/12768 New Operation and Guarding of pumping machinery (Automatic Operation) including all allied electro-mechanical components installed at BHADAR W/S Scheme in the district of MALDA under MLMD, PHE Dte. Assistant Engineer - II Junior Engineer-06 3649/MLMD 29/08/2025 365 MOON LIGHT CONSTRUCTION AND STAR GOLD ENTERPRISE 3.63 0.00 0
12 MALDAH Malda Division BHADAR Piped Water Supply Scheme , SM/12768 New Annual Operation Maintenance & Emergent repair of pipe line of distribution system & Rising main of BHADAR Piped Water Supply Scheme at Gazole Dev. Block under Malda Division, PHE Dte. in the District of Malda. {Period from 01/10/2025 to 30/09/2026}. Sri Biswadip Sengupta, Assistant Engineer Amit Karmakar, Junior Engineer 5033/MD 22/09/2025 365 MOONLIGHT CONSTRUCTION AND STAR GOLD ENTERPRISE 6.23 0.00 0
Total 578.59 487.93